ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
Data |
Text |
 |
7
|
Mon Jan 6 19:10:36 2014 |
Thomas Bergauer | common | Beam Momentum 3GeV/c | run001 to run012 | | | | Unknown | We have set the beam momentum to 3 GeV |
 |
17
|
Tue Jan 7 02:17:14 2014 |
Thomas Bergauer | | beam momentum 6GeV/c | run013 | | | | Unknown | |
|
23
|
Tue Jan 7 09:33:51 2014 |
Thomas Bergauer | common | beam momentum back to 3Gev/c | run014 and later ones | | | | Unknown | |
|
28
|
Tue Jan 7 14:51:45 2014 |
Thomas Bergauer | Belle SVD | TLU control | | | | | Unknown | 1. ssh bastion
2. ssh belle-control
3. ssh |
|
41
|
Wed Jan 8 12:40:30 2014 |
Thomas Bergauer | AIDA | intcal AIDA Stack | cal034 | 83.8k | 08.01.2014 12:32:22 | 08.01.2014 13:01:30 | Unknown | HV=100V I=4.5uA
position adapted to center beam
|
|
42
|
Wed Jan 8 14:10:07 2014 |
Thomas Bergauer | AIDA | run | run035 | 211681 | 08.01.2014 14:01:25 | 08.01.2014 17:03:55 | Unknown | HV=100V I=4.2uA
position adapted to center beam
accidentally
hit reset button on PC which ended this run |
|
43
|
Wed Jan 8 17:20:40 2014 |
Markus Friedl | AIDA | run | run036 | 320k | 08.01.2014 17:18:51 | 08.01.2014 22:14:58 | Unknown | HV=100V I=4.3uA
centered position
5GeV beam |
|
46
|
Thu Jan 9 11:02:14 2014 |
Markus Friedl | AIDA | info | | | | | Unknown | Created bad strip masks for the AIDA config
files |
|
50
|
Thu Jan 9 14:47:21 2014 |
Thomas Bergauer | common | position of DESY Table | | | | | Unknown | BEAM mode:
height (z): -346 (initially:
-357)
horizontal (x): -255
OFF |
|
59
|
Fri Jan 10 11:02:31 2014 |
Markus Friedl | Belle SVD | Power supply | | | 10.01.2014 11:00:00 | | Unknown | |
|
67
|
Mon Jan 13 12:02:40 2014 |
Markus Friedl | common | Kontakt | | | | | Unknown | Richard Thalmeier Tel. 4801
Hao Yin |
|
68
|
Sun Jan 19 18:01:46 2014 |
Christian Irmler | common | AIDA setup operated with TuxDAQ | | | | | Unknown | New SIS driver version sis1100-2.13-3 installed
on DAQPC.
To install the driver call as root: |
|
70
|
Fri Jan 24 00:21:16 2014 |
Hao Yin | | AIDA | HW_AIDA001 | 40k | 24.02.2014 00:18 | | Unknown | HV=100V I=3.7uA
position = 0 / -30 mm relative to
initial (but again centered) no idea --- |
|
72
|
Fri Jan 24 11:23:15 2014 |
Hao Yin | | AIDA | HW_AIDA003 | 76356 | 24.02.2014 10:30 | 24.02.2014 11:22 | Unknown | HV=100V I=3.7uA
position = 0 / -30 mm relative to
initial (but again centered) no idea --- |
|
74
|
Sat Jan 25 18:24:03 2014 |
Wolfgang Treberspurg | Infineon | Single mode Run Stack 2 | HW_Run_Infineon_Stack2_001 | 1.05 M | 25.01.2014 10:30 | 25.01.2014 15:40 | Unknown | HV at 300V; I at app. 11µA 4GeV,
Single mode
Modules centered to beam but no hits |
|
75
|
Sat Jan 25 18:28:38 2014 |
Wolfgang Treberspurg | Infineon | Calibration run Infineon Stack 2 | Calibration_Run_Infineon_Stack2_001 | 82900 | 25.01.2014 10:15 | 25.01.2014 10:25 | Unknown | HV 300V, I ca. 11µA single mode |
|
76
|
Sat Jan 25 18:46:32 2014 |
Wolfgang Treberspurg | Infineon | Mulit 6 mode Run Stack 2 | HW_Run_Infineon_Stack2_Multi_001 | 340k | 25.01.2014 16:30 | 25.01.2014 18:40 | Unknown | HV 300V, I 10µA
Beam Energy changed during the run
between 2GeV - 5GeV - 4GeV |
|
1
|
Sat Jan 4 16:30:46 2014 |
Markus Friedl | Infineon | cal | cal001 | 83800 | 04.01.2014 16:16:51 | 04.01.2014 16:25:46 | Good | HV=300V I=9.3uA (total) |
|
2
|
Sun Jan 5 15:08:09 2014 |
Markus Friedl | AIDA | cal | cal002 | 83800 | 05.01.2014 15:01:32 | 05.01.2014 15:30:36 | Good | HV=100V I=6uA |
|
3
|
Mon Jan 6 16:33:13 2014 |
Markus Friedl | Infineon | run | run001 | 200k | 06.01.2014 16:28:58 | 06.01.2014 17:10:56 | Good | HV=300V I=11.1uA
position centered horizontally (+5mm)
DESY table z=-346 x=-255 |
|