|
ID |
Date |
Author |
Project |
Measurement Type |
Object ID |
Subject |
Text |
|
|
36
|
Thu Jun 5 10:34:45 2014 |
Benedikt Würkner | Belle II | source | Silc Module | Silc Angle Measurement 10° | Measured the Silc 03/10 Module using the
Sr90 Source to have a comparison for the
Eta-Distribution at different angles. |
|
|
2
|
Tue Apr 22 19:34:09 2008 |
Markus Friedl | SPS Testbeam June08 | module | hybrid 01 | Properties of hybrid 01, sensor fully bonded, HV=100V | HV bias glued to backplane, HV=100V |
6x |
|
5
|
Wed Apr 30 16:52:17 2008 |
Markus Friedl | BELLE Upgrade | module | micron | micron sensor glued to frame | soeben haben wir den micron-DSSD (double metal
layer) in den 2-teiligen rahmen geklebt und
auf beiden seiten
|
|
|
6
|
Wed May 7 15:24:49 2008 |
Christian Irmler | SPS Testbeam June08 | module | module 10/02 | properties (noise, intcal), APVs bonded to the sensor | Module tested with 1 and 2 rows bonded to
the sensor, respectively.
HV = 100 V
Ibias
(100V) = 19.1 nA
Ibias (200V) = 23.7 nA |
12x |
|
9
|
Wed May 7 15:26:24 2008 |
Christian Irmler | SPS Testbeam June08 | module | module 20/09 | properties (noise, intcal), APVs bonded to the sensor | Module tested with 1 and 2 rows bonded to
the sensor, respectively.
HV = 100 V
Ibias
(100 V) = 25.1 nA
Ibias (200 V) = 31.4 nA |
12x |
|
8
|
Wed May 7 15:40:07 2008 |
Christian Irmler | SPS Testbeam June08 | module | module 07/07 | properties (noise, intcal), APVs bonded to the sensor | Module tested with 1 and 2 rows bonded to
the sensor, respectively.
HV = 100 V
Ibias
(100 V) = 20.2 nA
Ibias (200 V) = 21.9 nA |
12x |
|
7
|
Wed May 7 16:12:58 2008 |
Christian Irmler | SPS Testbeam June08 | module | module 12/08 | properties (noise, intcal), APVs bonded to the sensor | Module tested with 1 and 2 rows bonded to
the sensor, respectively.
HV = 100 V
Ibias
(100 V) = 22.2 nA
Ibias (200 V) = 26.5 nA |
12x |
|
10
|
Wed May 7 19:05:08 2008 |
Christian Irmler | SPS Testbeam June08 | module | module 04/04 | properties (noise, intcal), APVs bonded to the sensor | Module tested with 1 and 2 rows bonded to
the sensor, respectively.
HV = 100 V
Ibias
(100 V) = 27.8 nA
Ibias (200 V) = 32.7 nA |
12x |
|
11
|
Fri May 9 09:56:15 2008 |
Christian Irmler | SPS Testbeam June08 | module | module 06/03 | properties (noise, intcal), APVs bonded to the sensor | Module tested with 1 and 2 rows bonded to
the sensor, respectively.
HV = 100 V
Ibias
(100 V) = 26.5 nA
Ibias (200 V) = 37.8 nA |
12x |
|
12
|
Fri May 9 10:00:34 2008 |
Christian Irmler | SPS Testbeam June08 | module | module 03/10 | properties (noise, intcal), APVs bonded to the sensor | Module tested with 1 and 2 rows bonded to
the sensor, respectively.
HV = 100 V
Ibias
(100 V) = 18.9 nA
Ibias (200 V) = 25.5 nA |
12x |
|
13
|
Fri May 9 10:04:26 2008 |
Christian Irmler | SPS Testbeam June08 | module | module 05/05 | properties (noise, intcal), APVs bonded to the sensor | Module tested with 1 and 2 rows bonded to
the sensor, respectively.
HV = 100 V
Ibias
(100 V) = 18.0 nA
Ibias (200 V) = 23.6 nA |
12x |
|
43
|
Tue May 19 14:48:06 2015 |
Hao Yin | Belle II | module | L6 Noise inJection Runs | L6 Noise inJection Runs | Folder "L6_RLC_Test"
Configuration file: /mnt/data/ITA_NOISE_TESTS/L6_RLC_Test/SinglePeak_3Fadc.cfg
3 Tests: Injkection to 2.5V 1.25V. |
|
|
52
|
Mon Nov 30 15:18:12 2015 |
Hao Yin | Belle II | module | ADC_DELAY_HOT | ADC delay hot | ADC delay scan at room temp and 20 min
after APV I2C config.
measured values at display in the |
|
|
53
|
Mon Nov 30 17:11:17 2015 |
Hao Yin | Belle II | module | FIRRun001 | FIRRun001 aft ADC_HOT | FirRun 20 min after I2C |
|
|
1
|
Fri Apr 18 17:23:26 2008 |
Markus Friedl | SPS Testbeam June08 | hybrid | hybrid 01 | Noise of hybrid 01, sensor fully bonded, no HV | HV bias not yet glued to backplane |
|
|
15
|
Wed Oct 7 14:23:35 2009 |
Dieter Uhl | BELLE Upgrade | hybrid | #4 | hybrid-pitchadapter | opens at upper coat
|
|
|
16
|
Wed Oct 7 14:24:06 2009 |
Dieter Uhl | BELLE Upgrade | hybrid | #5 | hybrid-pitchadapter | shorts at upper coat
|
|
|
37
|
Tue May 19 09:31:50 2015 |
Hao Yin | | | | Noise Test ITA | Everything works except L3 p-side.
The config file is shown in the
following: |
|
|
38
|
Tue May 19 10:08:53 2015 |
Hao Yin | | | | FADC system setup success | 3 FADC. All Channel/APV25 running (except
L3 n first and last -> not connected (bonding))
n-side: all connectors |
|
|
42
|
Tue May 19 13:42:04 2015 |
Hao Yin | | | | L6 Noise inJection Setup | Test Nr. 1:
RLC between DockBox and Hybrid
(both side). |
|