| 
Home
CMS Production
Clean room
MedAustron
HEPHY
testbeams
old
 | 
| 
electronics
module assembly
SiDDaTA
scratch
 | 
|   HEPHY logbook of the Electronics Group, Page 3 of 4  | 
Not logged in | 
  | 
   | 
| New entries since: | Thu Jan  1 01:00:00 1970 |    | 
   Tue May 19 14:48:06 2015, Hao Yin, Belle II, module, L6 Noise inJection Runs, L6 Noise inJection Runs 
 |  
   Mon Nov 30 15:12:19 2015, Hao Yin, , , , FIR_ADC config 
 |  
   Mon Nov 30 17:11:17 2015, Hao Yin, Belle II, module, FIRRun001, FIRRun001 aft ADC_HOT 
 |  
   Tue May 19 10:57:19 2015, Hao Yin, Belle II, system, FIR, FIR filter 
 |  
   Tue May 19 10:08:53 2015, Hao Yin, , , , FADC system setup success 
 |  
   Mon May 25 10:38:03 2015, Hao Yin, Belle II, system, L5 Ladder Emission Test, Emission 
 |  
   Tue May 19 13:23:16 2015, Hao Yin, Belle II, system, Calibration, CalibrationRun001 
 |  
   Fri May 22 12:01:32 2015, Hao Yin, , , , CMC injection LV 10V 
 |  
   Mon Nov 30 15:18:12 2015, Hao Yin, Belle II, module, ADC_DELAY_HOT, ADC delay hot 
 |  
   Mon May 25 20:27:23 2015, Hao Yin, Belle II, system, Caen PS base line measurements,    
 |  
   Wed May 27 09:30:54 2015, Hao Yin, Belle II, system, CAEN PS Primary side,      
 |  
   Mon Nov 30 17:13:47 2015, Hao Yin, Belle II, system, PedestalRun,  
 |  
   Mon Nov 30 17:23:51 2015, Hao Yin, Belle II, system, HardwareRun001,    
 |  
   Mon Nov 30 17:47:54 2015, Hao Yin, Belle II, system, HardwareRun002,    
 |  
   Mon Nov 30 18:32:13 2015, Hao Yin, Belle II, system, ADC Delay Scan Cold,  
 |  
   Mon Nov 30 18:44:04 2015, Hao Yin, Belle II, system, FIRRun_Cold,  
 |  
   Mon Nov 30 18:45:49 2015, Hao Yin, Belle II, system, PedestalRun_Cold,  
 |  
   Mon Nov 30 18:49:23 2015, Hao Yin, Belle II, system, Hardware_Cold,    
 |  
   Mon Nov 30 19:01:54 2015, Hao Yin, Belle II, system, Hardware_Cold,    
 |  
   Mon Nov 30 19:48:05 2015, Hao Yin, Belle II, system, Hardware_Room_With_Cold_I2C,    
 |   
 |