Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle testbeam at SPS in June 2015, Page 6 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Project Subjectdown Run Number Events XYPosition Cooling Data Text Attachments
  94   Fri Jun 12 09:31:58 2015 Hao YinBelle II FADC (H6A)FIR005  YesGoodFIR filer and ADC delay for long sixlet
cal run.
  
  80   Wed Jun 10 18:05:03 2015 Benedikt WürknerSVD3 (H6B)FEI4 configuration   NoUnknownThere are two planes, one fixed upstream
and one fixed downstream. 

CIS3WII_6 upstream and CIS2WI_IBL2
  
  56   Mon Jun 8 16:53:13 2015 Benedikt WürknerSVD3 (H6B)EUTelescope Fitter not working investigation    UnknownApparently every problem can be attributed
to a misalignment problem. The telescope
has troubles with heavily misaligned DUTs.
 nice-alignment.pngbad-alignment.png 
  39   Sun Jun 7 20:02:40 2015 Hao YinBelle II FADC (H6A)Cooling Box Emergency break    UnknownSomething triggered a emergency break.
HWRun012 only last 1-10k event has to be
discarded.
  
  28   Sun Jun 7 10:39:56 2015 Hao YinBelle II FADC (H6A)Calibration002   GoodCooled!
FIRRun002, pedestalrun006; temp see
attachment in pedestalrun006
  
  63   Tue Jun 9 09:33:33 2015 Hao YinBelle II FADC (H6A)Calibration003   Goodroom temp
FIRRun002,
pedestalrun006;
  
  70   Tue Jun 9 16:22:59 2015 Benedikt WürknerSVD3 (H6B)Beam Profile Results66 und 67 2NoGood   HW_066_002_Result.pdfHW_066_003_Result.pdfHW_067_000_Result.pdfHW_067_001_Result.pdf 
ELOG V3.1.5-fc6679b