Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle testbeam at SPS in June 2015, Page 6 of 6  Not logged in ELOG logo
Entry  Fri Jun 12 09:31:58 2015, Hao Yin, Belle II FADC (H6A), FIR, 005, , , Yes, Good 
FIR filer and ADC delay for long sixlet cal run.
Entry  Wed Jun 10 18:05:03 2015, Benedikt Würkner, SVD3 (H6B), FEI4 configuration, , , , No, Unknown 
There are two planes, one fixed upstream and one fixed downstream. 

CIS3WII_6 upstream and CIS2WI_IBL2 downstream.

They are configured using the pc in H6B which can be accessed via microsoft remote desktop from the network 192.168.5.x using the ip 192.168.5.6. 
Entry  Mon Jun 8 16:53:13 2015, Benedikt Würkner, SVD3 (H6B), EUTelescope Fitter not working investigation, , , , , Unknown nice-alignment.pngbad-alignment.png
Apparently every problem can be attributed to a misalignment problem. The telescope has troubles with heavily misaligned DUTs. Was resolved by creating
different gear-files for each run with pretty precise coordinates of the DUT position calculated for the telescope coordinate system. 

Additionally one has to watch out for misaligned planes of the telescope itself. It was required to allow for more than 2mm offset for the telescope
Entry  Sun Jun 7 20:02:40 2015, Hao Yin, Belle II FADC (H6A), Cooling Box Emergency break, , , , , Unknown 
Something triggered a emergency break. HWRun012 only last 1-10k event has to be discarded.
Entry  Sun Jun 7 10:39:56 2015, Hao Yin, Belle II FADC (H6A), Calibration, 002, , , , Good 
Cooled!
FIRRun002, pedestalrun006; temp see attachment in pedestalrun006
 
Entry  Tue Jun 9 09:33:33 2015, Hao Yin, Belle II FADC (H6A), Calibration, 003, , , , Good 
room temp
FIRRun002,
pedestalrun006;
Entry  Tue Jun 9 16:22:59 2015, Benedikt Würkner, SVD3 (H6B), Beam Profile Results, 66 und 67, , 2, No, Good HW_066_002_Result.pdfHW_066_003_Result.pdfHW_067_000_Result.pdfHW_067_001_Result.pdf
 
ELOG V3.1.5-fc6679b