Sun Jun 7 14:44:29 2015, Thomas Bergauer, SVD3 (H6B), XY Stage and DUT Positions, , , , , Unknown  
|
Coordinate system:
pos x-Direction = Jura side
pos y-Direction = Down |
Sun Jun 7 20:02:40 2015, Hao Yin, Belle II FADC (H6A), Cooling Box Emergency break, , , , , Unknown
|
Something triggered a emergency break. HWRun012 only last 1-10k event has to be discarded. |
Mon Jun 8 11:33:24 2015, Thomas Bergauer, common, beam profile, , , , , Unknown
|
120GeV hadrons, beam config H6A.BELLE.003 |
Mon Jun 8 16:53:13 2015, Benedikt Würkner, SVD3 (H6B), EUTelescope Fitter not working investigation, , , , , Unknown 
|
Apparently every problem can be attributed to a misalignment problem. The telescope has troubles with heavily misaligned DUTs. Was resolved by creating
different gear-files for each run with pretty precise coordinates of the DUT position calculated for the telescope coordinate system.
Additionally one has to watch out for misaligned planes of the telescope itself. It was required to allow for more than 2mm offset for the telescope |
Mon Jun 8 18:08:49 2015, Thomas Bergauer, SVD3 (H6B), Telescope online monitor, , , , , Unknown
|
a working version of the EUDET online monitor (which works also with the FE-I4) is at the following location
~/BELLETEST/eudaq-neu/build/monitors/onlinemon$ ./OnlineMon.exe -sc 0 -f /home/telescope/eudaq/data/run000060.raw |
Tue Jun 9 10:01:03 2015, Lukas Bulla, SVD3 (H6B), TLU setup info, , , , , Unknown 
|
Channels:
Upstream vertical -> channel 0; (bitmask 1)
Upstream horizontal -> channel 1; (bitmask 2)
Downstream
vertical -> channel 2; (bitmask 4)
Downstream horizontal ->channel 3; (bitmask 8)
|
Wed Jun 10 18:05:03 2015, Benedikt Würkner, SVD3 (H6B), FEI4 configuration, , , , No, Unknown
|
There are two planes, one fixed upstream and one fixed downstream.
CIS3WII_6 upstream and CIS2WI_IBL2 downstream.
They are configured using the pc in H6B which can be accessed via microsoft remote desktop from the network 192.168.5.x using the ip 192.168.5.6. |
|