Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle testbeam at SPS in June 2015, Page 4 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Project Subject Run Number Eventsdown XYPosition Cooling Data
  27   Sun Jun 7 10:36:38 2015 Hao YinBelle II FADC (H6A)Pedestal00610000  Unknown

Cooled, Temp see attachment
FirRun002
 

Attachment 1: Pos1.PNG
Pos1.PNG
  62   Tue Jun 9 09:32:41 2015 Hao YinBelle II FADC (H6A)Pedestal00710000  Good

Room temp, fir002

  73   Tue Jun 9 20:32:46 2015 Hao YinBelle II FADC (H6A)Pedestal00810000 NoGood

Room temp, fir004

  81   Wed Jun 10 18:52:34 2015 Hao YinBelle II FADC (H6A)Pedestal00910000 YesGood

temp: in -22 out -18,
FIRRun004,

Attachment 1: temperature.PNG
temperature.PNG
  96   Fri Jun 12 17:00:18 2015 Hao YinBelle II FADC (H6A)Pedestal01110000 NoGood

cooled pedestal vaules for long sixlet cal

  97   Fri Jun 12 17:03:02 2015 Hao YinBelle II FADC (H6A)Pedestal01210000 NoGood

room temp
FIRRun002
 

  1   Tue May 12 10:27:39 2015 Benedikt WürknerSVD3 (H6B)Setup information    Unknown

Information concerning the SVD3 setup during a beam test

In the beam area setup the whole crate and the power supply with the usual spider cable and the two Keithly 2410 high voltage supplies. Monitoring of the 2410 happens via a NI MAX interface that connects to the GPIB-Ethernet interface and needs to be configured there. The IP and password are noted on the device. The software can be found on heros in medialib/LONGTERM/longterm R3.1_doubleSided as a normal *.vi file. 

Default adresses 16 and 17 as defined in labview, need to figure out on site which is which, if the voltage selected (e.g. 100V) is applied as +50/-50 or if it is applied as +100/-100 before connecting the cables. 

Take a run without dut as well to check the telescope integrity. Without dut in beamline!!!!!

Attachment 1: spider-config.jpg
spider-config.jpg
  2   Wed Jun 3 10:48:42 2015 Benedikt WürknercommonNetworking    Unknown

WLAN Router:

SSID: Hephy

password: 20supersecret14

DHCP Range: 192.168.0.200 to 239

Netmask: /24

DNS Server: 192.168.0.254

Gateway: 192.168.0.254

external IP: 128.141.174.109 (für diverse Port Forwardings)

 

Manuell vergebene IP Adressen bitte unbedingt Benni mitteilen oder/und in der folgenden Tabelle eintragen! 

IP/MAC Zuweisung:

IP Machine/Name intern Port Forwarding (aussen)
192.168.0.124 SVD Kenwood  VNC(5900)  VNC(9000)
192.168.0.11 SVD3 DAQ  VNC(5900)  VNC(9001)
192.168.0.12 TUX DAQ  VNC(5900), VNC(5901), SSH(22)  VNC(9009), VNC(9002), SSH(9003),
192.168.0.13 Belle XY Tisch    
192.168.0.14 TUXOA  SSH(22), VNC(5900)  SSH(9004), VNC(9012)
192.168.0.20 JTAG Server    
192.168.0.148 alixcool    
192.168.0.16 slowcontrol  VNC(5900)  VNC(9005)
192.168.0.144 CAEN Power supply    
192.168.0.17 zenpixelwiki  SSH(22), VNC(5900)  SSH(9006), VNC(9008)
192.168.0.18 TLU (pcx25042, XY)  VNC(5900)  VNC(9007)
192.168.0.19 Cooling control PC VNC(5900) VNC(9011)
192.168.0.240 NI GPIB - ENET / 1000    
192.168.0.150 Printserver  VNC(5900)  VNC(9010)
       
137.138.113.254 Aida PC   vnc(5900)

 

Admin Zugang Wlan Router:

IP: 192.168.0.254

Username: admin

password: Hephy2014

 

  3   Wed Jun 3 17:23:07 2015 Thomas BergauerBelle II FADC (H6A)XY stage positions    Unknown

x-Achse: positiv Richtung Saleve (counting room)

y-Achse: positiv Richtung UNTEN!!

 

position of laddertestbox xy stages:

Rev. Pos (BWD Sensor, BWD, Oben) x= 82.3, y=110.6

Mitte Sensor:

Pos 1: (mitte BWD sensor): x=144.74, y=80.8

Pos 2: (mitte Origami -z): x=269.62, y=80.8

Pos 3: (mitte Origami ce): x=394.42, y=80.8

Pos 4 (mitte FWD Micron Sensor): x=517, y=80.8

Ecke:

Pos 5 (Ecke BWD sensor): x=92.3, y=105.6

Pos 6 (Ecke Origami -z): x=217.18, y=105.6

Pos 7 (Ecke Origami ce): x=342.06, y=105.6

Pos 8 (Ecke FWD sensor): x=467,62, y=56,3 

Pos 9 (Ecke FWD sensor): x=568,33 y=64,48

Attachment 1: L5_Class_B-.PNG
L5_Class_B-.PNG
  4   Thu Jun 4 14:15:50 2015 Hao YinBelle II FADC (H6A)FIR001   Good

FIR filer and ADC delay with all sensor and telescope.
telescope n-side switched.

  9   Thu Jun 4 18:49:03 2015 Benedikt WürknerSVD3 (H6B)Setup    Unknown
Attachment 1: IMG_20150604_184442.jpg
IMG_20150604_184442.jpg
Attachment 2: IMG_20150604_184451.jpg
IMG_20150604_184451.jpg
Attachment 3: IMG_20150604_184516.jpg
IMG_20150604_184516.jpg
  12   Fri Jun 5 12:02:29 2015 Hao YinBelle II FADC (H6A)Sixlet Calibration001   Good

room temp max subevent at 2. with lat = 96

  13   Fri Jun 5 12:03:34 2015 Hao YinBelle II FADC (H6A)Sixlet Calibration002   Good

lat = 97 to a greater range of lat scan

  14   Fri Jun 5 19:55:00 2015 Hao YinBelle II FADC (H6A)Sixlet Calibration003   Unknown

lat = 98

room temp

pedestalrun 003

  20   Sat Jun 6 16:14:36 2015 Benedikt WürknerSVD3 (H6B)calibration run and setup informationcal01   Unknown

Calibration Run with +- 50V Bias with higher compliance since the p-side draws more current than expected (23muA by the MAMBO)

 

  25   Sat Jun 6 23:30:29 2015 Benedikt WürknerBelle II FADC (H6A)Hardware009   Good

room temp, FIRRun002, PedestalRun005, room temp

target: FW, pos 9 (p-0, n-128*4)

  26   Sun Jun 7 00:58:33 2015 Benedikt WürknerSVD3 (H6B)hardware runhw006   Crap

Table: 100:70

Bias: +-50V

600 pedestal

0 offset (at the beginning)

Started APVDAQ and waited till 600 were taken then started EUDAQ

EUDAQ Run 24

Mimosa Thresholds lvl 7

  28   Sun Jun 7 10:39:56 2015 Hao YinBelle II FADC (H6A)Calibration002   Good

Cooled!
FIRRun002, pedestalrun006; temp see attachment in pedestalrun006
 

  34   Sun Jun 7 13:19:19 2015 Hao YinBelle II FADC (H6A)Hardware010   Good

cooled

FIRRun002, PedestalRun006 (temp enty)

target: BW, pos 1

  36   Sun Jun 7 14:44:29 2015 Thomas BergauerSVD3 (H6B)XY Stage and DUT Positions    Unknown

Coordinate system:

pos x-Direction = Jura side

pos y-Direction = Down

Zero-point is in the top right corner in Beam direction

 

absolute Position of PI Stages:

Pos 1: x=100 mm, y=79 mm (Hits in APV 3 und 8-9 in p-Seite und 14 und 17 in n-Seite )

Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite) 

Pos 3: x=38.6 mm, y=84 mm

Pos 4: x=130.7 mm, y=84 mm

Pos 5: x=30.5 mm, y= 99.74 mm (wide side top)

Pos 6: x=136.08 mm, y= 91.49 mm (narrow side top)

Pos 7: x= 30.5 mm, y= 79 mm (wide side center)

Pos 8: x=136.08 mm, y= 79 mm (narrow side center)

Pos 9: x=30.5 mm, y= 60.67 mm (wide side down)

Pos 10: x= 136.08mm, y=68.9 mm (narrow side down)

Attachment 1: FWD-BWD.PNG
FWD-BWD.PNG
Attachment 2: apv-numbering.jpg
apv-numbering.jpg
Attachment 3: FWD-BWD_Bemaßung.PNG
FWD-BWD_Bemaßung.PNG
ELOG V3.1.5-fc6679b