Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle testbeam at SPS in June 2015, Page 4 of 6  Not logged in ELOG logo
Entry  Sun Jun 7 10:36:38 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 006, 10000, , , Unknown Pos1.PNG
Cooled, Temp see attachment
FirRun002
 
Entry  Tue Jun 9 09:32:41 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 007, 10000, , , Good 
Room temp, fir002
Entry  Tue Jun 9 20:32:46 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 008, 10000, , No, Good 
Room temp, fir004
Entry  Wed Jun 10 18:52:34 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 009, 10000, , Yes, Good temperature.PNG
temp: in -22 out -18,
FIRRun004,
Entry  Fri Jun 12 17:00:18 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 011, 10000, , No, Good 
cooled pedestal vaules for long sixlet cal
Entry  Fri Jun 12 17:03:02 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 012, 10000, , No, Good 
room temp
FIRRun002
 
Entry  Tue May 12 10:27:39 2015, Benedikt Würkner, SVD3 (H6B), Setup information, , , , , Unknown spider-config.jpg
Information concerning the SVD3 setup during a beam test

In the beam area setup the whole crate and the power supply with the usual spider cable and the two Keithly 2410 high voltage supplies.
Monitoring of the 2410 happens via a NI MAX interface that connects to the GPIB-Ethernet interface and needs to be configured there. The IP and password
Entry  Wed Jun 3 10:48:42 2015, Benedikt Würkner, common, Networking, , , , , Unknown 
WLAN Router:

SSID: Hephy

password: 20supersecret14

DHCP Range: 192.168.0.200 to 239
Entry  Wed Jun 3 17:23:07 2015, Thomas Bergauer, Belle II FADC (H6A), XY stage positions, , , , , Unknown L5_Class_B-.PNG
x-Achse: positiv Richtung Saleve (counting room)

y-Achse: positiv Richtung UNTEN!!
Entry  Thu Jun 4 14:15:50 2015, Hao Yin, Belle II FADC (H6A), FIR, 001, , , , Good 
FIR filer and ADC delay with all sensor and telescope.
telescope n-side switched.
Entry  Thu Jun 4 18:49:03 2015, Benedikt Würkner, SVD3 (H6B), Setup, , , , , Unknown IMG_20150604_184442.jpgIMG_20150604_184451.jpgIMG_20150604_184516.jpg
 
Entry  Fri Jun 5 12:02:29 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 001, , , , Good 
room temp max subevent at 2. with lat = 96
Entry  Fri Jun 5 12:03:34 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 002, , , , Good 
lat = 97 to a greater range of lat scan
Entry  Fri Jun 5 19:55:00 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 003, , , , Unknown 
lat = 98

room temp

pedestalrun 003
Entry  Sat Jun 6 16:14:36 2015, Benedikt Würkner, SVD3 (H6B), calibration run and setup information, cal01, , , , Unknown 
Calibration Run with +- 50V Bias with higher compliance since the p-side draws more current than expected (23muA by the MAMBO)

 
Entry  Sat Jun 6 23:30:29 2015, Benedikt Würkner, Belle II FADC (H6A), Hardware, 009, , , , Good 
room temp, FIRRun002, PedestalRun005, room temp

target: FW, pos 9 (p-0, n-128*4)
Entry  Sun Jun 7 00:58:33 2015, Benedikt Würkner, SVD3 (H6B), hardware run, hw006, , , , Crap 
Table: 100:70

Bias: +-50V

600 pedestal
Entry  Sun Jun 7 10:39:56 2015, Hao Yin, Belle II FADC (H6A), Calibration, 002, , , , Good 
Cooled!
FIRRun002, pedestalrun006; temp see attachment in pedestalrun006
 
Entry  Sun Jun 7 13:19:19 2015, Hao Yin, Belle II FADC (H6A), Hardware, 010, , , , Good 
cooled

FIRRun002, PedestalRun006 (temp enty)

target: BW, pos 1
Entry  Sun Jun 7 14:44:29 2015, Thomas Bergauer, SVD3 (H6B), XY Stage and DUT Positions, , , , , Unknown FWD-BWD.PNGapv-numbering.jpgFWD-BWD_Bemaßung.PNG
Coordinate system:

pos x-Direction = Jura side

pos y-Direction = Down
ELOG V3.1.5-fc6679b