ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
XYPosition |
Cooling |
Data |
Text |
|
27
|
Sun Jun 7 10:36:38 2015 |
Hao Yin | Belle II FADC (H6A) | Pedestal | 006 | 10000 | | | Unknown | Cooled, Temp see attachment
FirRun002
|
|
62
|
Tue Jun 9 09:32:41 2015 |
Hao Yin | Belle II FADC (H6A) | Pedestal | 007 | 10000 | | | Good | Room temp, fir002 |
|
73
|
Tue Jun 9 20:32:46 2015 |
Hao Yin | Belle II FADC (H6A) | Pedestal | 008 | 10000 | | No | Good | Room temp, fir004 |
|
81
|
Wed Jun 10 18:52:34 2015 |
Hao Yin | Belle II FADC (H6A) | Pedestal | 009 | 10000 | | Yes | Good | temp: in -22 out -18,
FIRRun004, |
|
96
|
Fri Jun 12 17:00:18 2015 |
Hao Yin | Belle II FADC (H6A) | Pedestal | 011 | 10000 | | No | Good | cooled pedestal vaules for long sixlet
cal |
|
97
|
Fri Jun 12 17:03:02 2015 |
Hao Yin | Belle II FADC (H6A) | Pedestal | 012 | 10000 | | No | Good | room temp
FIRRun002
|
|
1
|
Tue May 12 10:27:39 2015 |
Benedikt Würkner | SVD3 (H6B) | Setup information | | | | | Unknown | Information concerning the SVD3 setup during
a beam test
In the beam area setup the whole |
|
2
|
Wed Jun 3 10:48:42 2015 |
Benedikt Würkner | common | Networking | | | | | Unknown | WLAN Router:
SSID:
Hephy
password: 20supersecret14 |
|
3
|
Wed Jun 3 17:23:07 2015 |
Thomas Bergauer | Belle II FADC (H6A) | XY stage positions | | | | | Unknown | x-Achse: positiv Richtung Saleve (counting
room)
|
|
4
|
Thu Jun 4 14:15:50 2015 |
Hao Yin | Belle II FADC (H6A) | FIR | 001 | | | | Good | FIR filer and ADC delay with all sensor
and telescope.
telescope n-side switched. |
|
9
|
Thu Jun 4 18:49:03 2015 |
Benedikt Würkner | SVD3 (H6B) | Setup | | | | | Unknown | |
|
12
|
Fri Jun 5 12:02:29 2015 |
Hao Yin | Belle II FADC (H6A) | Sixlet Calibration | 001 | | | | Good | room temp max subevent at 2. with lat =
96 |
|
13
|
Fri Jun 5 12:03:34 2015 |
Hao Yin | Belle II FADC (H6A) | Sixlet Calibration | 002 | | | | Good | lat = 97 to a greater range of lat scan |
|
14
|
Fri Jun 5 19:55:00 2015 |
Hao Yin | Belle II FADC (H6A) | Sixlet Calibration | 003 | | | | Unknown | lat = 98
room temp
pedestalrun 003 |
|
20
|
Sat Jun 6 16:14:36 2015 |
Benedikt Würkner | SVD3 (H6B) | calibration run and setup information | cal01 | | | | Unknown | Calibration Run with +- 50V Bias with higher
compliance since the p-side draws more current
than expected (23muA by the MAMBO) |
|
25
|
Sat Jun 6 23:30:29 2015 |
Benedikt Würkner | Belle II FADC (H6A) | Hardware | 009 | | | | Good | room temp, FIRRun002, PedestalRun005, room
temp
target: FW, pos 9 (p-0, n-128*4) |
|
26
|
Sun Jun 7 00:58:33 2015 |
Benedikt Würkner | SVD3 (H6B) | hardware run | hw006 | | | | Crap | Table: 100:70
Bias: +-50V
600 pedestal |
|
28
|
Sun Jun 7 10:39:56 2015 |
Hao Yin | Belle II FADC (H6A) | Calibration | 002 | | | | Good | Cooled!
FIRRun002, pedestalrun006; temp see
attachment in pedestalrun006 |
|
34
|
Sun Jun 7 13:19:19 2015 |
Hao Yin | Belle II FADC (H6A) | Hardware | 010 | | | | Good | cooled
FIRRun002, PedestalRun006 (temp
enty) |
|
36
|
Sun Jun 7 14:44:29 2015 |
Thomas Bergauer | SVD3 (H6B) | XY Stage and DUT Positions | | | | | Unknown | Coordinate system:
pos x-Direction = Jura side
pos y-Direction = Down |
|