Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle testbeam at SPS in June 2015, Page 3 of 6  Not logged in ELOG logo
ID Date Author Project Subject Run Number Events XYPosition Coolingdown Data Text Attachments
  71   Tue Jun 9 20:27:55 2015 Benedikt WürknerSVD3 (H6B)Hardware FEI4685035058NoUnknownRUN WITH SVD3, telescope and FEI4

EUDET Run 68

Mimosa Threshold 6
  
  73   Tue Jun 9 20:32:46 2015 Hao YinBelle II FADC (H6A)Pedestal00810000 NoGoodRoom temp, fir004   
  74   Tue Jun 9 20:36:39 2015 Hao YinBelle II FADC (H6A)Hardware02062k NoGoodroom temp

FIRRun004, PedestalRun008
telescope alignment
  
  75   Wed Jun 10 10:40:24 2015 Hao YinBelle II FADC (H6A)Sixlet Calibration004  NoGoodroom
temp
pedestalrun 008
  
  76   Wed Jun 10 11:19:33 2015 Hao YinBelle II FADC (H6A)Sixlet Calibration005  NoGoodroom
temp
pedestalrun 008
  
  77   Wed Jun 10 12:03:53 2015 Hao YinBelle II FADC (H6A)Sixlet Calibration006  NoGoodroom
temp
pedestalrun 008
  
  78   Wed Jun 10 12:04:27 2015 Hao YinBelle II FADC (H6A)Sixlet Calibration007  NoGoodroom
temp
pedestalrun 008
  
  80   Wed Jun 10 18:05:03 2015 Benedikt WürknerSVD3 (H6B)FEI4 configuration   NoUnknownThere are two planes, one fixed upstream
and one fixed downstream. 

CIS3WII_6 upstream and CIS2WI_IBL2
  
  82   Wed Jun 10 19:05:04 2015 Benedikt WürknerSVD3 (H6B)Hardware FEI471500001NoUnknownRUN WITH SVD3, telescope and FEI4

EUDET Run 71

Mimosa Threshold 6
  
  84   Wed Jun 10 20:54:36 2015 Benedikt WürknerSVD3 (H6B)Residuals FE-I4 (Upstream)59 10NoGood   run000059-fitter-residuals.pdf 
  85   Wed Jun 10 21:36:25 2015 Benedikt WürknerSVD3 (H6B)Horizontal Beam Profile Run72500001NoGoodTrying to get a nice plot of the beam profile
by only using the and 3 (horizontal) 
see http://elog.hephy.at/testbeam-SPS2015/66
 HW_072_002_Result.pdfHW_072_003_Result.pdfHW_072_000_Result.pdfHW_072_001_Result.pdf 
  88   Thu Jun 11 15:56:32 2015 Benedikt WürknerSVD3 (H6B)Hardware FEI473200007NoUnknownRUN WITH SVD3, telescope and FEI4

EUDET Run 73

Mimosa Threshold 6
  
  91   Thu Jun 11 17:11:40 2015 Benedikt WürknerSVD3 (H6B)Hardware FEI474200008NoUnknownRUN WITH SVD3, telescope and FEI4

EUDET Run 74

Mimosa Threshold 6
  
  95   Fri Jun 12 16:52:52 2015 Benedikt WürknerSVD3 (H6B)Telescope without DUT76~30k NoGoodThreshold 6

Testrun to see how the telescope
behaves without a DUT to test if there is
 Telescope_without_DUT.png 
  96   Fri Jun 12 17:00:18 2015 Hao YinBelle II FADC (H6A)Pedestal01110000 NoGoodcooled pedestal vaules for long sixlet
cal
  
  97   Fri Jun 12 17:03:02 2015 Hao YinBelle II FADC (H6A)Pedestal01210000 NoGoodroom temp
FIRRun002
 
  
  98   Fri Jun 12 17:08:23 2015 Benedikt WürknerSVD3 (H6B)Telescope with FEI480~30k NoGoodThreshold 6

Testrun to see how the telescope
behaves without a DUT to test if there is
  
  99   Fri Jun 12 17:11:45 2015 Hao YinBelle II FADC (H6A)Hardware02650k1NoGoodroom
temp

FIRRun002,
  
  100   Sat Jun 13 09:09:37 2015 Hao YinBelle II FADC (H6A)Hardware027~200k2NoGoodroom
temp

FIRRun002,
  
  101   Sat Jun 13 10:07:36 2015 Hao YinBelle II FADC (H6A)Hardware02850k4NoGoodroom
temp

FIRRun002,
  
ELOG V3.1.5-fc6679b