Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle testbeam at SPS in June 2015, Page 2 of 6  Not logged in ELOG logo
Entry  Sat Jun 6 16:18:48 2015, Benedikt Würkner, SVD3 (H6B), hardware run, hw003, 50000, , , Unknown 

Table: 100:70

Bias: +-50V

Run to confirm trigger delay

Entry  Sat Jun 6 16:48:41 2015, Hao Yin, Belle II FADC (H6A), Hardware, 008, 50000, 8, No, Good 20x

room temp, FIRRun002, PedestalRun005, room temp

target: FW, pos 8 (p-0, n-0)

Entry  Sun Jun 7 13:21:15 2015, Hao Yin, Belle II FADC (H6A), Hardware, 011, 50000, , , Good Pos2.PNG

cooled (see attachment)

FIRRun002, PedestalRun006

target: -Z, pos 2

Entry  Sun Jun 7 15:03:31 2015, Thomas Bergauer, SVD3 (H6B), hardware run with TLU and Telescope, hw050, 50000, 2, No, Good 

RUN WITH SVD3 plus telescope

EUDET Run 50

Mimosa Threshold 7

Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite) 

Entry  Sun Jun 7 15:59:05 2015, Hao Yin, Belle II FADC (H6A), Hardware, 012, 50000, , , Unknown Pos3.PNG

cooled (see attachment)

FIRRun002, PedestalRun006

target: CE, pos 2

cooling box emergency break ... ie about the last 1-10 k not useable.

Entry  Sun Jun 7 20:03:09 2015, Thomas Bergauer, SVD3 (H6B), hardware run with TLU and Telescope, hw051, 50000, 3, No, Good 

RUN WITH SVD3 plus telescope

EUDET Run 51

Mimosa Threshold 7

Pos 3: x=38.6 mm, y=84 mm

Entry  Sun Jun 7 20:03:31 2015, Thomas Bergauer, SVD3 (H6B), hardware run with TLU and Telescope, hw052, 50000, 4, No, Good 

RUN WITH SVD3 plus telescope

EUDET Run 52

Mimosa Threshold 7

Pos 4: x=130.7 mm, y=84 mm (hits auf APV 2 und (bisschen) 3, (bisschen) 8 und 9, 15 und 16

Entry  Sun Jun 7 20:37:56 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and Telescope, hw053, 50000, 5, , Good 

RUN WITH SVD3 plus telescope

EUDET Run 53

Mimosa Threshold 6

Pos 5: x=30.5 mm, y= 99.74 mm (wide side top)

Entry  Sun Jun 7 23:04:06 2015, Hao Yin, Belle II FADC (H6A), Hardware, 013, 50000, , , Good 

cooled (see attachment)

FIRRun002, PedestalRun006

target: CE, pos 3

cooling box emergency break ... ie about the last 1-10 k not useable.

Entry  Mon Jun 8 09:37:30 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and Telescope, hw056, 50000, 8, No, Good run000056-fitter-residuals.pdf

RUN WITH SVD3 plus telescope

EUDET Run 56

Mimosa Threshold 6

Pos 8: x=136.08 mm, y= 79 mm (narrow side center)

Entry  Mon Jun 8 10:47:44 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and Telescope, hw057, 50000, 9, No, Good run000057-fitter-residuals.pdf

RUN WITH SVD3 plus telescope

EUDET Run 57

Mimosa Threshold 6

Pos 9: x=30.5 mm, y= 60.67 mm (wide side down)

Entry  Mon Jun 8 11:57:14 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and Telescope, hw058, 50000, 10, No, Good 

RUN WITH SVD3 plus telescope

EUDET Run 58

Mimosa Threshold 6

Pos 10: x= 136.08mm, y=68.9 mm (narrow side down)

Entry  Mon Jun 8 15:49:23 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, 60, 50000, 10, No, Unknown Screenshot_2015-06-08_17.59.50.pngScreenshot_2015-06-08_17.41.03.png

Hardware run with FEI4, Telescope and FW&BW Modules

Pos 10: x= 136.08mm, y=68.9 mm (narrow side down)

 

Bilder: Hitmap FE-I4 und Correlation zw. Mimosa und FE-I4

Entry  Mon Jun 8 18:00:06 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, hw061, 50000, 2, No, Unknown 

RUN WITH SVD3, telescope and FEI4

EUDET Run 61

Mimosa Threshold 6

Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite) 

Entry  Mon Jun 8 20:16:41 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, 62, 50000, 3, No, Unknown 

RUN WITH SVD3, telescope and FEI4

EUDET Run 62

Mimosa Threshold 6

Pos 3: x=38.6 mm, y=84 mm

Entry  Tue Jun 9 09:50:15 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, 64, 50000, 5, No, Unknown 

RUN WITH SVD3, telescope and FEI4

EUDET Run 64

Mimosa Threshold 6

Pos 5: x=30.5 mm, y= 99.74 mm (wide side top)

Entry  Tue Jun 9 11:20:25 2015, Benedikt Würkner, SVD3 (H6B), Vertical Beam Profile Run, 65, 50000, 2, No, Unknown 

Trying to get a nice plot of the beam profile by only using the vertical PMTs (number 0 and 2) see http://elog.hephy.at/testbeam-SPS2015/66 for details. 

Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite) 

Producer.TLU Config Change:

  • AndMask=0x5
Entry  Tue Jun 9 12:34:16 2015, Benedikt Würkner, SVD3 (H6B), Horizontal Beam Profile Run, 66, 50000, 2, No, Unknown 

Trying to get a nice plot of the beam profile by only using the PMTs 1 and 3 (horizontal)  see http://elog.hephy.at/testbeam-SPS2015/66 for details. 

Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite) 

Producer.TLU Config Change:

  • AndMask=0xa (10 in hex) 
Entry  Tue Jun 9 14:33:50 2015, Benedikt Würkner, SVD3 (H6B), Vertical Beam Profile Run, 67, 50000, 2, No, Unknown 

Trying to get a nice plot of the beam profile by only using the vertical PMT 0 (upstream vertical, the long one)  see http://elog.hephy.at/testbeam-SPS2015/66 for details. 

Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite) 

Producer.TLU Config Change:

  • AndMask=0x1 
Entry  Wed Jun 10 19:05:04 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, 71, 50000, 1, No, Unknown 

RUN WITH SVD3, telescope and FEI4

EUDET Run 71

Mimosa Threshold 6

Pos 1: x=100 mm, y=79 mm (Hits in APV 3 und 8-9 in p-Seite und 14 und 17 in n-Seite )

Downstream FEI4 used

ELOG V3.1.5-fc6679b