Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle/Infineon/AIDA testbeam at SPS in Nov 2014, Page 1 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Project Subject Run Number Events StartTime EndTime Datadown Text Attachments
  1   Fri Nov 14 19:01:27 2014 Thomas BergauercommonAdministrative Procedures for Departure    UnknownWednesday:
* Transport request starten (I do
not need any transport service) von 887 nach
 Merchandise-2014.pdfankunftsbestaetigung.pdf 
  2   Fri Nov 14 19:22:40 2014 Martin Kurzcommonip addresses, portforwarding, wlan    UnknownWLAN Router:

SSID:
Hephy

password: 20supersecret14
  
  3   Fri Nov 14 19:47:25 2014 Thomas Bergauer Telefonnummern    Unknown* CCC (zentraler Beschleuniger-Kontrollraum):
77500
* H6A Controlroom: 76755
  
  4   Fri Nov 14 19:49:04 2014 Florian BuchsteinercommonBelle Setup    Unknown   SPS_2014_Testbeam_-_Belle_Setup-Model.pdf 
  5   Fri Nov 14 19:52:12 2014 Thomas Bergauer important web pages    UnknownSPS Accelerator status:  http://op-webtools.web.cern.ch/op-webtools/vistar/vistars.php?usr=SPS1
general Information about the Beam
  
  6   Sat Nov 15 11:36:41 2014 Thomas BergauercommonChecklist for North Area access    Unknown 
  
  7   Sat Nov 15 11:37:19 2014 Thomas BergauerAIDAList of EUDET Telescope PCs in H6b    Unknown https://twiki.cern.ch/twiki/bin/view/CLIC/ClicPixelDataTakingCERNPS2014   
  8   Sat Nov 15 12:41:50 2014 Benedikt WürknerBelle SVDDiscoveries during preliminary sensor tests    UnknownL5_p_side APV #3 faulty signal
L4_n_side APV #2 and #3 faulty signal
 weird_signal.pngfaulty-signal-l4_n.pngfaulty-signal_l4_n_2.png 
  9   Sun Nov 16 14:22:51 2014 Thomas BergauerAIDAPC Configuration EUDET Telescope in H6b    UnknownPC (gehört AIDA) in H6b control room:  ssh
telescope@
  
  10   Sun Nov 16 21:37:56 2014 Hao YincommonAIM    Unknownfachi:  aimhephy@antispam.e4ward.com
chrisu:  gargamel0971
flo: flo.bux@sbg.at
  
  11   Mon Nov 17 19:23:57 2014 Thomas BergauerInfineonPI XY table initial position    Unknowninitial position of Infineon Stack (PI
Micromove):
(guess center position by eye)
  
  12   Mon Nov 17 22:03:02 2014 Martin KurzcommonDrucker    UnknownDrucken über den Printserver
(192.168.0.150):
 
  
  13   Mon Nov 17 22:18:27 2014 Hao YinBelle SVDADC delay scan  Mon Nov 17 22:08:29 UnknownL3-p: 18
L4-p: 36
L5-p: 33
  
  15   Mon Nov 17 22:21:50 2014 Hao Yin Bad APVs  Mon Nov 17 22:08:29 CET 2014 UnknownList with bad APVs:

 
  
  16   Mon Nov 17 22:22:56 2014 Hao Yin PedestalRun_00100110000Mon Nov 17 22:22:41 CET 2014 UnknownAt room temperature.
 
  
  17   Mon Nov 17 22:28:05 2014 Hao Yin CalibrationRun001 Mon Nov 17 22:27:07 CET 2014 UnknownNoise file from run 001 
PedestalRun_001
FIRRun_001
  
  18   Mon Nov 17 22:28:07 2014 Hao Yin CalibrationRun001 Mon Nov 17 22:27:07 CET 2014 UnknownNoise file from run 001 
PedestalRun_001
FIRRun_001
  
  19   Mon Nov 17 22:28:09 2014 Hao Yin CalibrationRun001 Mon Nov 17 22:27:07 CET 2014 UnknownNoise file from run 001 
PedestalRun_001
FIRRun_001
  
  20   Mon Nov 17 23:04:57 2014 Hao YinBelle SVDPedestalRun_002 10338Mon Nov 17 23:03:03 CET 2014 UnknownPedestal run at room temperature.
6 subevents. Noise reference run.
Delay as latest run.
  
  21   Tue Nov 18 01:03:18 2014 Hao YinBelle SVDRemapped FADC inputs  Tue Nov 18 01:03:32 CET 2014 UnknownWe moved the second cable to the third
connector on the FADC to match DESY testbeam
conditions. 
  
ELOG V3.1.5-fc6679b