ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
Data |
Text |
|
1
|
Fri Nov 14 19:01:27 2014 |
Thomas Bergauer | common | Administrative Procedures for Departure | | | | | Unknown | Wednesday:
* Transport request starten (I do
not need any transport service) von 887 nach |
|
3
|
Fri Nov 14 19:47:25 2014 |
Thomas Bergauer | | Telefonnummern | | | | | Unknown | * CCC (zentraler Beschleuniger-Kontrollraum):
77500
* H6A Controlroom: 76755 |
|
5
|
Fri Nov 14 19:52:12 2014 |
Thomas Bergauer | | important web pages | | | | | Unknown | SPS Accelerator status: http://op-webtools.web.cern.ch/op-webtools/vistar/vistars.php?usr=SPS1
general Information about the Beam |
|
6
|
Sat Nov 15 11:36:41 2014 |
Thomas Bergauer | common | Checklist for North Area access | | | | | Unknown |
|
|
7
|
Sat Nov 15 11:37:19 2014 |
Thomas Bergauer | AIDA | List of EUDET Telescope PCs in H6b | | | | | Unknown | https://twiki.cern.ch/twiki/bin/view/CLIC/ClicPixelDataTakingCERNPS2014 |
|
9
|
Sun Nov 16 14:22:51 2014 |
Thomas Bergauer | AIDA | PC Configuration EUDET Telescope in H6b | | | | | Unknown | PC (gehört AIDA) in H6b control room: ssh
telescope@ |
|
11
|
Mon Nov 17 19:23:57 2014 |
Thomas Bergauer | Infineon | PI XY table initial position | | | | | Unknown | initial position of Infineon Stack (PI
Micromove):
(guess center position by eye) |
|
29
|
Tue Nov 18 13:13:53 2014 |
Thomas Bergauer | Infineon | hardware run | infineon_run001 | 225508 | | | Unknown | Infineon new stack - batch 4
single hit
HV=300V,
total I = 4.2475 µA
strips |
|
2
|
Fri Nov 14 19:22:40 2014 |
Martin Kurz | common | ip addresses, portforwarding, wlan | | | | | Unknown | WLAN Router:
SSID:
Hephy
password: 20supersecret14 |
|
12
|
Mon Nov 17 22:03:02 2014 |
Martin Kurz | common | Drucker | | | | | Unknown | Drucken über den Printserver
(192.168.0.150):
|
|
53
|
Thu Nov 20 10:22:17 2014 |
Markus Friedl | Belle SVD | common | | | | | Unknown |
Some VME errors occured over
night
Optical fiber
changed
Situation |
|
92
|
Sat Nov 22 11:16:26 2014 |
Markus Friedl | Belle SVD | cooling | | | | | Unknown | Cooling box plant hung up (I2C error on
Alix, persistent after reboot)
Power-cycled cooling plant, now working |
|
109
|
Sun Nov 23 09:49:00 2014 |
Markus Friedl | Belle SVD | cooling | | | | | Unknown | Saturday evening, the cooling became unstable
which indicates the end of the CO2 supply,
possibly having a mixture of liquid and gas |
|
115
|
Sun Nov 23 15:07:54 2014 |
Markus Friedl | Belle SVD | common | | | | | Unknown | Geometry setup of FW/BW:
(all dimensions are in mm and refer
to the sensor planes) |
|
116
|
Sun Nov 23 15:09:53 2014 |
Markus Friedl | Belle SVD | PedestalRun | 001 | 10000 | | | Good | Initial pedestal run with SVD3 setup and
WedgeOld, FW993, BW993 (reading out 4 chips
on every p-side) |
|
117
|
Sun Nov 23 15:10:42 2014 |
Markus Friedl | Belle SVD | CalibrationRun | 001 | 83400 | | | Good | Initial calibration run with SVD3 setup
and WedgeOld, FW993, BW993 (reading out 4
chips on every p-side) |
|
118
|
Sun Nov 23 15:13:37 2014 |
Markus Friedl | Belle SVD | HardwareRun | 003 | 100600 | 23.11.2014 14:07:23 | 23.11.2014 16:51:27 | Good | Hardware run, hitting APVs 0/1 on p-sides,
1/2 on n-sides
EUDAT telescope running with difference |
|
119
|
Sun Nov 23 16:55:37 2014 |
Markus Friedl | Belle SVD | HardwareRun | 004 | 60600 | 23.11.2014 16:51:49 | 23.11.2014 18:23:54 | Good | Hardware run, hitting APVs 1/2 on p-sides,
1/2 on n-sides
EUDAT telescope running with difference |
|
121
|
Sun Nov 23 18:26:54 2014 |
Markus Friedl | Belle SVD | HardwareRun | 005 | 60600 | 23.11.2014 18:24:34 | 23.11.2014 | Good | Hardware run, hitting APVs 2/3 on p-sides,
1/2 on n-sides
EUDAT telescope running with difference |
|
10
|
Sun Nov 16 21:37:56 2014 |
Hao Yin | common | AIM | | | | | Unknown | fachi: aimhephy@antispam.e4ward.com
chrisu: gargamel0971
flo: flo.bux@sbg.at |
|