Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol, Page 4 of 4  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Sat Oct 27 00:43:55 2012, Christian Irmler, MicronBaby, cal, cal029, 83800, 27.10.2012 00:10:15, 27.10.2012 00:36:55, Good 
After irradiation
 
Micron baby stack after gamma irrdiation
Entry  Sat Oct 27 19:36:24 2012, Markus Friedl, MicronOrigami_gross, cal, cal031, 83800, 27.10.2012 19:59:50, 27.10.2012 20:44:38, Good 
Belle stack 2 after irradiation
HV = +50V -50V
I = 112 µA
Entry  Sun Oct 28 15:46:07 2012, Markus Friedl, MicronBaby, cal, cal034, 83800, 28.10.2012 15:19:10, 28.10.2012 15:40:47, Good 
Micron Baby stack 2 after irradiation (intermediate strips)
HV = -100 V
I = 33 uA
Entry  Mon Oct 29 11:36:40 2012, Markus Friedl, Infineon, cal, cal037, 83800, 29.10.2012 11:35:12, 29.10.2012 11:58:02 , Good 
Infineon stack Version 2 after irradiation
HV = +300 V
I = 137 A
Entry  Mon Oct 29 22:36:52 2012, Markus Friedl, HPK_baby, cal, cal038, 83800, 29.10.2012 22:17:34, 29.10.2012 22:47:47, Good 
HPK baby stack after irradiation with partial cooling (HPK neutron & HPK neutron/gamma)
HV = +75 Vm  -75V
I =  226A
Entry  Tue Oct 30 10:37:19 2012, Markus Friedl, HPK_baby, cal, cal039, 83800, 30.10.2012 10:35:35 , 30.10.2012 11:02:06 , Good 
Turned off cooling, now taking warm data
 
HPK baby stack after irradiation - no cooling
Entry  Tue Oct 30 17:24:01 2012, Markus Friedl, MicronOrigami_gross, cal, cal040, 83800, 30.10.2012 17:20:28 , 30.10.2012 17:54:09, Unknown 
Cooling for 2DSSD established after some struggle.
2DSSD fully read out with cooling
HV= +40 V -40 V    I = 2 uA
Entry  Fri Oct 12 23:51:35 2012, Markus Friedl, common, Zimmernummer & Telefonnummern, , , , , Unknown 
2nd week:
Markus: 38 - 420   (phone: 70 420)
Thomas: 38 - 431   (phone: 70 431)
Entry  Wed Oct 17 14:06:24 2012, Markus Friedl, MicronOrigami_gross, Stack für stealth parasitic mode, , , , , Good pausenfueller1.jpgpausenfueller2.jpg
Dieser Stack wird jetzt quasi als Pausenkasperl eingebaut und läuft im "stealth parasitic" mode während der Irradiation-Woche. Gut,
dass wir alles auch von Wien aus fernsteuern können :-)
Entry  Sat Oct 13 14:44:47 2012, Manfred Valentan, MicronOrigami_gross, Stack configuration, Belle Stack 3, , , , , Unknown 
Module in Beamrichtung:
2-DSSD Origami  -z
2-DSSD Origami ce
Entry  Mon Oct 15 18:52:18 2012, Marko Dragicevic, MicronOrigami_gross, Stack configuration, Belle Stack 2, , , , , Unknown 
Belle stack 2:
Modules:

    Origami #4
    Origami #3
    Wedge new 1
    Wedge old

n-Seite: Beam abgewand
Entry  Fri Oct 12 23:52:57 2012, Markus Friedl, common, Sozialisierung, , , , , Unknown 
Prost, Bergi!
(Das ist nur ein Test, ob du wirklich all die Elog-Emails liest.)
Entry  Tue Oct 16 23:03:09 2012, Markus Friedl, common, Sozialisierung, , , , , Unknown IMAG2041.jpgfondue.jpg
So steuert man einen Testbeam!
Entry  Fri Oct 12 15:04:55 2012, Marko Dragicevic, common, Network configuration, , , , , Unknown 
Router:
IP 137.138.113.230
Hostname ROUTERHEPHY.cern.ch
Entry  Thu Oct 18 09:14:07 2012, Manfred Valentan, common, Fahrt nach Mol, , , , , Unknown 
 Liebe Kollegen,
wir brechen. auf. Wünscht uns Glück!
Entry  Wed Oct 31 15:54:59 2012, Christian Irmler, common, Ethernetkabel zu H6A, , , , , Unknown 2012-10-31_15.47.42.jpg2012-10-31_12.28.32.jpg
Ethernetkabel HNA447 -> H6A:
Das obere Ende im Counting Hut liegt im Zwischenboden unterhalb der orangenen Steckdose beim Eingang mit dem elektronischen Zahlenschloß.
Das untere Ende in der Zone hängt aufgerollt an einem Pfeiler der Kabeltasse, unweit der Stelle an der das Kabel von oben hinunter gelassen
Entry  Fri Oct 12 19:42:36 2012, Christian Irmler, MicronBaby, Configuration of normal stack, , , , , Unknown micronbaby_stack_geometry.jpg
Micron baby stack with all strips connected to APV chips
n-side faces the beam, p-side not read out.
Channels counting from bottom to top
Entry  Sun Oct 14 02:00:12 2012, Manfred Valentan, MicronBaby, Configuration of intermediate stack, , , , , Unknown 
Micron baby stack with every other strip connected to APV chips
n-side faces the beam, p-side not read out.
Channels counting from bottom to top
Entry  Sat Oct 13 19:04:23 2012, Markus Friedl, MicronOrigami_gross, CO2 cooling, , , , , Unknown 
Wir haben ja schon seit langem vermutet, dass man mit reiner Gasphase nicht kühlen kann. Jetzt erbringen wir den experimentellen Beweis dafür.
Expandierendes Gas kühlt zwar auch, aber nicht so tief runter und vor allem sind beträchtliche Temperaturdifferenzen zwischen den einzelnen
Modulen zu beobachten. Das erste Origami bekommt etwa -13°C aber bis zum letzten Micron sind wir auf Raumtemperatur.
Entry  Mon Oct 15 19:21:56 2012, Marko Dragicevic, common, Beam settings and profile, , , , , Unknown NetBeans_IDE_3.5_15-Oct-12_19-28-32.png
Beam setting file:
H6A.804: FM HAD (H8=+180, H6=120@0mrad) PARALL IN H6A; RD42
Kommentar (Marko):
ELOG V3.1.5-fc6679b