Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol, Page 4 of 4  Not logged in ELOG logo
ID Date Author Project Subject Run Numberdown Events StartTime EndTime Data Text Attachments
  29   Tue Oct 16 22:19:21 2012 Christian IrmlerMicronOrigami_grosscalcal0078380016.10.2012 20:25:17 16.10.2012 21:12:01 UnknownOrigami Stack 2: Origami #4, #3, Wedge
new1, old
HV = +-50V, Ibias=12.3µA
  
  26   Tue Oct 16 11:07:17 2012 Christian IrmlerMicronOrigami_grosscalcal0068380016.10.2012 10:30:3416.10.2012 11:00:51UnknownOrigami Stack 2a: Origami #4, Wedge new1
reading out all 6 APV of p-side
HV = +-40V, Ibias=5.12µA
  
  23   Mon Oct 15 22:13:28 2012 Marko DragicevicMicronOrigami_grosscal ATTENTION: wrong bias voltage cal0058380015.10.2012 22:16:2615.10.2012 23:07:37 UnknownATTENTION: Bias voltage was +-100 V instead
of +- 50 V
Origami Stack 2: Origami #4, #3,
  
  18   Sun Oct 14 23:01:11 2012 Marko DragicevicInfineoncalcal0048380014.10.2012 21:44:0014.10.2012 21:03:00UnknownInfineon Stack Version 1 (with height information,
BabyStrips horizontal Strixel vertical)
HV = 300V   I=3.1 uA
  
  15   Sun Oct 14 08:25:10 2012 Manfred ValentanMicronBabycalcal0038380014.10.2012 08:21:4614.10.2012 08:51:58UnknownMicron baby intermediate stack
HV = -100 V
I = 6.9 uA
  
  12   Sat Oct 13 23:04:22 2012 Markus FriedlMicronOrigami_grosscalcal0028380013.10.2012 23:03:1813.10.2012 22:57:48UnknownBelle stack 3 (2-DSSD, Micron new, Micron
old)
HV = +-50V   I=10.5A 
  
  3   Fri Oct 12 22:00:52 2012 Christian IrmlerMicronBabycalcal0018380012.10.2012 21:16:3312.10.2012 21:59:02Good12.10.2012  21:16:33  event=0 
Disk space: Needed=0.00 GB, Available=206.59
GB, Total=931.51 GB
  
  1   Fri Oct 12 15:04:55 2012 Marko DragiceviccommonNetwork configuration    UnknownRouter:
IP 137.138.113.230
Hostname ROUTERHEPHY.cern.ch
  
  2   Fri Oct 12 19:42:36 2012 Christian IrmlerMicronBabyConfiguration of normal stack    UnknownMicron baby stack with all strips connected
to APV chips
n-side faces the beam, p-side not
 micronbaby_stack_geometry.jpg 
  5   Fri Oct 12 23:51:35 2012 Markus FriedlcommonZimmernummer & Telefonnummern    Unknown2nd week:
Markus: 38 - 420   (phone: 70
420)
  
  6   Fri Oct 12 23:52:57 2012 Markus FriedlcommonSozialisierung    UnknownProst, Bergi!
(Das ist nur ein Test, ob du wirklich
all die Elog-Emails liest.)
  
  8   Sat Oct 13 14:44:47 2012 Manfred ValentanMicronOrigami_grossStack configuration, Belle Stack 3    UnknownModule in Beamrichtung:
2-DSSD Origami  -z
2-DSSD Origami ce
  
  10   Sat Oct 13 19:04:23 2012 Markus FriedlMicronOrigami_grossCO2 cooling    UnknownWir haben ja schon seit langem vermutet,
dass man mit reiner Gasphase nicht kühlen
kann. Jetzt erbringen wir den experimentellen
  
  13   Sun Oct 14 02:00:12 2012 Manfred ValentanMicronBabyConfiguration of intermediate stack    UnknownMicron baby stack with every other strip
connected to APV chips
n-side faces the beam, p-side not
  
  20   Mon Oct 15 18:52:18 2012 Marko DragicevicMicronOrigami_grossStack configuration, Belle Stack 2    UnknownBelle stack 2:
Modules:

    Origami #4
    Origami
  
  21   Mon Oct 15 19:21:56 2012 Marko DragiceviccommonBeam settings and profile    UnknownBeam setting file:
H6A.804: FM HAD (H8=+180, H6=120@0mrad)
PARALL IN H6A; RD42
 NetBeans_IDE_3.5_15-Oct-12_19-28-32.png 
  30   Tue Oct 16 23:03:09 2012 Markus FriedlcommonSozialisierung    UnknownSo steuert man einen Testbeam!
 IMAG2041.jpgfondue.jpg 
  34   Wed Oct 17 14:06:24 2012 Markus FriedlMicronOrigami_grossStack für stealth parasitic mode    GoodDieser Stack wird jetzt quasi als Pausenkasperl
eingebaut und läuft im "stealth
parasitic" mode während der Irradiation-Woche.
 pausenfueller1.jpgpausenfueller2.jpg 
  36   Thu Oct 18 09:14:07 2012 Manfred ValentancommonFahrt nach Mol    Unknown Liebe Kollegen,
wir brechen. auf. Wünscht uns
Glück!
  
  80   Wed Oct 31 15:54:59 2012 Christian IrmlercommonEthernetkabel zu H6A    UnknownEthernetkabel HNA447 -> H6A:
Das obere Ende im Counting Hut liegt
im Zwischenboden unterhalb der orangenen
 2012-10-31_15.47.42.jpg2012-10-31_12.28.32.jpg 
ELOG V3.1.5-fc6679b