  78   Tue Oct 30 18:35:51 2012 Christian IrmlerMicronOrigami_grossrunrun040100k30.10.2012 18:23:2130.10.2012 21:55:53 UnknownCooling for 2DSSD established after some
struggle.
2DSSD fully read out with cooling
 temperatures_run040.jpg 
  79   Tue Oct 30 22:15:41 2012 Markus FriedlMicronOrigami_grossrunrun041100k30.10.2012 22:09:13 UnknownCooling for 2DSSD established after some
struggle.
2DSSD fully read out with cooling
 temperatures_run041.jpg 
  23   Mon Oct 15 22:13:28 2012 Marko DragicevicMicronOrigami_grosscal ATTENTION: wrong bias voltage cal0058380015.10.2012 22:16:2615.10.2012 23:07:37 UnknownATTENTION: Bias voltage was +-100 V instead
of +- 50 V
Origami Stack 2: Origami #4, #3,
  
  3   Fri Oct 12 22:00:52 2012 Christian IrmlerMicronBabycalcal0018380012.10.2012 21:16:3312.10.2012 21:59:02Good12.10.2012  21:16:33  event=0 
Disk space: Needed=0.00 GB, Available=206.59
GB, Total=931.51 GB
  
  12   Sat Oct 13 23:04:22 2012 Markus FriedlMicronOrigami_grosscalcal0028380013.10.2012 23:03:1813.10.2012 22:57:48UnknownBelle stack 3 (2-DSSD, Micron new, Micron
old)
HV = +-50V   I=10.5A 
  
  15   Sun Oct 14 08:25:10 2012 Manfred ValentanMicronBabycalcal0038380014.10.2012 08:21:4614.10.2012 08:51:58UnknownMicron baby intermediate stack
HV = -100 V
I = 6.9 uA
  
  18   Sun Oct 14 23:01:11 2012 Marko DragicevicInfineoncalcal0048380014.10.2012 21:44:0014.10.2012 21:03:00UnknownInfineon Stack Version 1 (with height information,
BabyStrips horizontal Strixel vertical)
HV = 300V   I=3.1 uA
  
  26   Tue Oct 16 11:07:17 2012 Christian IrmlerMicronOrigami_grosscalcal0068380016.10.2012 10:30:3416.10.2012 11:00:51UnknownOrigami Stack 2a: Origami #4, Wedge new1
reading out all 6 APV of p-side
HV = +-40V, Ibias=5.12µA
  
  29   Tue Oct 16 22:19:21 2012 Christian IrmlerMicronOrigami_grosscalcal0078380016.10.2012 20:25:17 16.10.2012 21:12:01 UnknownOrigami Stack 2: Origami #4, #3, Wedge
new1, old
HV = +-50V, Ibias=12.3µA
  
  35   Wed Oct 17 21:30:39 2012 Markus FriedlMicronOrigami_grosscalcal0088380017.10.2012 17:15:1317.10.2012 18:08:11GoodInternal calibration for "stealth
parasitic" mode Belle stack; taken without
beam
 currents.pngcurrents2.png 
  40   Sat Oct 20 10:49:03 2012 Markus FriedlMicronOrigami_grosscalcal0198380020.10.2012 10:46:3620.10.2012 11:32:57GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-45V, Ibias=70A
  
  43   Sun Oct 21 09:01:04 2012 Markus FriedlMicronOrigami_grosscalcal0208380021.10.2012 08:59:2121.10.2012 09:45:03GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-40V, Ibias=72uA
  
  44   Sun Oct 21 09:50:00 2012 Markus FriedlMicronOrigami_grosscalcal0218380021.10.2012 09:50:07 21.10.2012 10:35:40GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-35V, Ibias=69uA
  
  46   Sun Oct 21 15:15:45 2012 Markus FriedlMicronOrigami_grosscalcal0228380021.10.2012 15:13:4721.10.2012 16:00:25GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-30V, Ibias=70uA
  
  48   Mon Oct 22 00:08:39 2012 Markus FriedlMicronOrigami_grosscalcal0238380022.10.2012 00:07:3422.10.2012 00:53:02GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-25V, Ibias=65uA
  
  50   Mon Oct 22 10:10:16 2012 Markus FriedlMicronOrigami_grosscalcal0248380022.10.2012 10:08:5322.10.2012 10:54:18GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-20V, Ibias=53uA
  
  53   Tue Oct 23 13:50:44 2012 Markus FriedlMicronOrigami_grosscalcal0258380023.10.2012 13:47:09 23.10.2012 14:35:05GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-15V, Ibias=48uA
  
  54   Tue Oct 23 15:55:58 2012 Markus FriedlMicronOrigami_grosscalcal0268380023.10.2012 14:56:4723.10.2012 15:42:17 GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-10V, Ibias=36uA
  
  57   Wed Oct 24 08:25:04 2012 Thomas BergauerMicronOrigami_grosscalcal0278380024.10.2012 08:22:2524.10.2012 09:10:19Unknown Belle Stack 4: 2 DSSD -z, Origami
#3, #1, wedge new #2
HV = +-5V, Ibias=23.5uA
Position:
  
  58   Wed Oct 24 09:51:41 2012 Thomas BergauerMicronOrigami_grosscalcal0288380024.10.2012 09:50:5324.10.2012 10:39:43Unknown Belle Stack 4: 2 DSSD -z, Origami
#3, #1, wedge new #2
HV = +-2.5V, Ibias=14.5uA
Position:
  