ID Date Author Project Subject Run Number Events StartTime EndTime Datadown
  20   Mon Sep 19 17:47:50 2011 Manfred ValentanMicronModule COMM-IRRAD     

Sensor: B2Micron_2826_07_Baby2 (reused from last year, was DUT3, module is irradiated to 700 kGy)

p-stop: Common, with intermediate strips, irradiated

Hybrid p-side: H41
Hybrid n-side: M31

  21   Mon Oct 3 20:30:14 2011 Thomas BergauercommonXY Tisch     

Grosser (DESY) Tisch:  x = -342.0    y = 343.0  (Einheiten unbekannt, möglicherweise mm)

Raten-Scan siehe gescannter Zettel im Attachment.

 

erster Wert: X, also horizontal (positive Zahlen: Saleve side = Restaurant Nr. 3)

zweiter Wert: Z, also Höhe (positive Zahlen nach unten)

Micron DUT: X:324, Z:103 [Einheiten in mm]

 

configuration: IP-Address 192.168.0.13; 2 Achsen

  23   Mon Oct 3 21:08:27 2011 Manfred ValentanMicronMicron-Baby-Stack p-stop, configuration     

Photo of hand-drawn stack configuration, config files

  25   Tue Oct 4 10:44:09 2011 Christian IrmlerMicronInternal Calibrationcal0028380004.10.2011 10:04:4904.10.2011 10:19:41 

micronbaby p-spray/irrad
HV = -100V
beam on,

irrad APVs with standard baseline settings --> too high

APV #2 (I²C addr. 40) deactivated, latency error after initialization, reset line open?

  26   Tue Oct 4 10:44:48 2011 Christian IrmlerMicronInternal Calibrationcal0038380004.10.2011 10:33:5004.10.2011 10:48:51 

micronbaby p-spray/irrad
HV = -100V
beam on, baseline of irrad APV reduced

APV #2 (I²C addr. 40) deactivated, latency error after initialization, reset line open?

  27   Tue Oct 4 10:47:59 2011 Manfred ValentanMicronInternal Calibrationcal0018380003.10.2011 20:34:4803.10.2011 20:50:57 

micronbaby p-stop stack
HV = -100V
beam on

  36   Wed Oct 5 19:33:40 2011 Markus FriedlcommonTrigger condition  4.10.2011 15:00  

Changed trigger such that off-spill scintillator triggers are vetoed.

Inserted Flip-Flop which is set by begin of spill (WWE) and reset by end of spill signal (EE). Out-bar is put in coincidence with the scintillator trigger.

This also changes the timing, which was unfortunately not detected until 30 hours later. Thus, runs 4-7 have bad (wrong) timing -> UNUSABLE