Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011, Page 4 of 5  Not logged in ELOG logo
ID Date Author Project Subject Run Number Eventsdown StartTime EndTime Data Text Attachments
  93   Wed Mar 7 16:03:30 2012 Christian IrmlerBELLEOrigami Module #4run113100k07.03.2012 16:07:3407.03.2012 16:30:48 UnknownSr90, small (new) scintillator, new trigger
unit
Origami Mod. #4
 run112-113.jpg 
  94   Wed Mar 7 16:58:36 2012 Christian IrmlerBELLEOrigami Module #4cal113100k07.03.2012 16:40:04 07.03.2012 16:57:08UnknownSr90, small (new) scintillator, new trigger
unit
Origami Mod. #4
  
  8   Fri Sep 16 11:01:15 2011 Manfred ValentanMicronMicron Baby Modules     Irradiated modules from last year:
COMB-IRRAD: B2Micron_2826_19_Baby4:
combined p-stop, intermediate strips (was
  
  9   Mon Sep 19 17:38:34 2011 Manfred ValentanMicronModule ATOLL-2     Sensor: B2Micron_2826_17_Baby3
p-stop: Atoll, with intermediate
strips
  
  10   Mon Sep 19 17:39:09 2011 Manfred ValentanMicronModule COMM-2     Sensor: B2Micron_2826_17_Baby2
p-stop: Common, with intermediate
strips
  
  11   Mon Sep 19 17:39:55 2011 Manfred ValentanMicronModule COMB-2     Sensor: B2Micron_2826_17_Baby4
p-stop: Combined with intermediate
strips
  
  12   Mon Sep 19 17:40:47 2011 Manfred ValentanMicronModule SPRAY-2     Sensor: B2Micron_2825_05_Baby4
p-stop: p-spray WITHOUT intermediate
strips
  
  13   Mon Sep 19 17:41:27 2011 Manfred ValentanMicronModule SPRAY-I-2     Sensor: B2Micron_2825_15_Baby3
p-stop: p-spray WITH intermediate
strips
  
  14   Mon Sep 19 17:42:01 2011 Manfred ValentanMicronModule SPRAY-1     Sensor: B2Micron_2825_05_Baby3
p-stop: p-spray WITHOUT intermediate
strips
  
  15   Mon Sep 19 17:42:39 2011 Manfred ValentanMicronModule SPRAY-I-1     Sensor: B2Micron_2825_15_Baby2
p-stop: p-spray WITH intermediate
strips
  
  16   Mon Sep 19 17:44:00 2011 Manfred ValentanMicronModule COMM-1     Sensor: B2Micron_2826_19_Baby2 (reused
from last year, was TRK7)
p-stop: Common, with intermediate
  
  17   Mon Sep 19 17:44:39 2011 Manfred ValentanMicronModule COMB-1     Sensor: B2Micron_2826_01_Baby4 (reused
from last year, was TRK6)
p-stop: Combined, with intermediate
  
  18   Mon Sep 19 17:46:07 2011 Manfred ValentanMicronModule ATOLL-1     Sensor: B2Micron_2826_07_Baby3 (reused
from last year, but was not used in beam
test SPS2010) 
  
  19   Mon Sep 19 17:47:11 2011 Manfred ValentanMicronModule COMB-IRRAD     Sensor: B2Micron_2826_19_Baby4 (reused
from last year, was DUT4, module is irradiated
to 700 kGy)
  
  20   Mon Sep 19 17:47:50 2011 Manfred ValentanMicronModule COMM-IRRAD     Sensor: B2Micron_2826_07_Baby2 (reused
from last year, was DUT3, module is irradiated
to 700 kGy)
  
  21   Mon Oct 3 20:30:14 2011 Thomas BergauercommonXY Tisch     Grosser (DESY) Tisch:  x = -342.0   
y = 343.0  (Einheiten unbekannt, möglicherweise
mm)
 xy-tisch-control.JPGdesy_xy_table.jpg 
  23   Mon Oct 3 21:08:27 2011 Manfred ValentanMicronMicron-Baby-Stack p-stop, configuration     Photo of hand-drawn stack configuration,
config files
 Micron-Baby-Stack_p-stop.pngcern11_micronbaby_pstop_single.cfgcern11_micronbaby_pstop_multi6.cfg 
  36   Wed Oct 5 19:33:40 2011 Markus FriedlcommonTrigger condition  4.10.2011 15:00  Changed trigger such that off-spill scintillator
triggers are vetoed.
Inserted Flip-Flop which is set by
 trigger_path_with_veto.png 
  45   Fri Oct 7 18:28:53 2011 Christian Irmlercommonrun schedule    Unknown   run_schedule.pdfrun_schedule.xlsx 
  49   Sat Oct 8 09:30:44 2011 Christian IrmlerBELLECooling plant tests  08.10.2011 09:30 UnknownSoftware run with 6 samples to ensure that
APV chips dissipate full power.
DAQ data not saved, bias current
 biascurrent_cooling_test1.jpgtemp_cooling_test1.jpg 
ELOG V3.1.5-fc6679b