  12   Mon Sep 19 17:40:47 2011 Manfred ValentanMicronModule SPRAY-2     

Sensor: B2Micron_2825_05_Baby4

p-stop: p-spray WITHOUT intermediate strips

Hybrid p-side: H44 (reused from last year)
Hybrid n-side: MB6

  13   Mon Sep 19 17:41:27 2011 Manfred ValentanMicronModule SPRAY-I-2     

Sensor: B2Micron_2825_15_Baby3

p-stop: p-spray WITH intermediate strips

Hybrid p-side: H43 (reused from last year)
Hybrid n-side: MB7

  14   Mon Sep 19 17:42:01 2011 Manfred ValentanMicronModule SPRAY-1     

Sensor: B2Micron_2825_05_Baby3

p-stop: p-spray WITHOUT intermediate strips

Hybrid p-side: H32 (reused from last year)
Hybrid n-side: MB8

  15   Mon Sep 19 17:42:39 2011 Manfred ValentanMicronModule SPRAY-I-1     

Sensor: B2Micron_2825_15_Baby2

p-stop: p-spray WITH intermediate strips

Hybrid p-side: MB1
Hybrid n-side: MB9

  16   Mon Sep 19 17:44:00 2011 Manfred ValentanMicronModule COMM-1     

Sensor: B2Micron_2826_19_Baby2 (reused from last year, was TRK7)

p-stop: Common, with intermediate strips

Hybrid p-side: H46
Hybrid n-side: M37

  17   Mon Sep 19 17:44:39 2011 Manfred ValentanMicronModule COMB-1     

Sensor: B2Micron_2826_01_Baby4 (reused from last year, was TRK6)

p-stop: Combined, with intermediate strips

Hybrid p-side: H45
Hybrid n-side: M36

  18   Mon Sep 19 17:46:07 2011 Manfred ValentanMicronModule ATOLL-1     

Sensor: B2Micron_2826_07_Baby3 (reused from last year, but was not used in beam test SPS2010)

p-stop: Atoll, with intermediate strips

Hybrid p-side: H40
Hybrid n-side: M30

  19   Mon Sep 19 17:47:11 2011 Manfred ValentanMicronModule COMB-IRRAD     

Sensor: B2Micron_2826_19_Baby4 (reused from last year, was DUT4, module is irradiated to 700 kGy)

p-stop: Combined, with intermediate strips, irradiated

Hybrid p-side: H48
Hybrid n-side: M35

  20   Mon Sep 19 17:47:50 2011 Manfred ValentanMicronModule COMM-IRRAD     

Sensor: B2Micron_2826_07_Baby2 (reused from last year, was DUT3, module is irradiated to 700 kGy)

p-stop: Common, with intermediate strips, irradiated

Hybrid p-side: H41
Hybrid n-side: M31

  21   Mon Oct 3 20:30:14 2011 Thomas BergauercommonXY Tisch     

Grosser (DESY) Tisch:  x = -342.0    y = 343.0  (Einheiten unbekannt, möglicherweise mm)

Raten-Scan siehe gescannter Zettel im Attachment.

 

erster Wert: X, also horizontal (positive Zahlen: Saleve side = Restaurant Nr. 3)

zweiter Wert: Z, also Höhe (positive Zahlen nach unten)

Micron DUT: X:324, Z:103 [Einheiten in mm]

 

configuration: IP-Address 192.168.0.13; 2 Achsen

  23   Mon Oct 3 21:08:27 2011 Manfred ValentanMicronMicron-Baby-Stack p-stop, configuration     

Photo of hand-drawn stack configuration, config files

  35   Wed Oct 5 17:54:09 2011 Christian IrmlerBELLEOrigami stack cooledcal0078380005.10.2011 17:51:57  Good

I2C setting modified to improve the shape of the p-side signal --> shaping time reduced, pulse height still low

Origami6
HV=+-40V
beam on

CO2 cooling: 
preassure @ P_TT_4 = 18.2 bar
mass flow = 0.9 g/s

I=18.0µA

longterm files
It-pos-0510111531.txt 
It-neg-0510111531.txt  

currents and temperatures:
05.10.2011  17:53:00  event=2900  rate=47events/s temp/curr=35.3/-05.6 35.3/-06.0 35.3/-06.9 34.6/001.9 34.8/002.2 34.8/020.7
 

  36   Wed Oct 5 19:33:40 2011 Markus FriedlcommonTrigger condition  4.10.2011 15:00  

Changed trigger such that off-spill scintillator triggers are vetoed.

Inserted Flip-Flop which is set by begin of spill (WWE) and reset by end of spill signal (EE). Out-bar is put in coincidence with the scintillator trigger.

This also changes the timing, which was unfortunately not detected until 30 hours later. Thus, runs 4-7 have bad (wrong) timing -> UNUSABLE

  45   Fri Oct 7 18:28:53 2011 Christian Irmlercommonrun schedule    Unknown
  49   Sat Oct 8 09:30:44 2011 Christian IrmlerBELLECooling plant tests  08.10.2011 09:30 Unknown

Software run with 6 samples to ensure that APV chips dissipate full power.

DAQ data not saved, bias current monitored

new longterm files:
It-neg-0810110926.txt
It-pos-0810110926.txt

  50   Sat Oct 8 14:33:25 2011 Thomas BergauerHPKbaby_stdrun016250k08.10.2011 14:31:40 Crap

falsches config file (single statt multi6)

 

no cooling
beam on; xy table position x=322  y=80
HV=200V Istart_PY=7.6uA;  Istart_N=0.42
std. I2C settings

  51   Sat Oct 8 16:35:04 2011 Thomas BergauerHPKbaby_stdrun017 08.10.2011 16:26:10 Crap

wrong timing

 

no cooling
beam on; xy table position x=322  y=80
HV=200V Istart_PY=7.6uA;  Istart_N=0.42
std. I2C settings

  56   Sun Oct 9 10:13:11 2011 Karl-Heinz HoffmannHPKbaby_addcal0118380009.10.2011 10:05:01 Good

no cooling
beam on; xy table position x=  y=
HV=200V Istart_P=1.5uA;  Istart_N=0.22uA
std. I2C settings

  58   Sun Oct 9 11:28:30 2011 Manfred ValentanHPKHPK BSTD stack configuration    Unknown

Module order:

BSTD1-N
BSTD2-N

BADD1-N (for z information)

BSTD1-P
BSTD1-Y

BSTD2-P
BSTD2-Y

Talk from Marko on Testbeam with HPK Double Metal Sensors

  59   Sun Oct 9 11:31:43 2011 Manfred ValentanHPKHPK BADD stack configuration    Unknown

Module order:

BADD1-N
BADD2-N

BSTD1-N (for z information)

BADD1-P
BADD1-Y

BADD2-P
BADD2-Y

Talk from Marko on Testbeam with HPK Double Metal Sensors