Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011, Page 3 of 5  Not logged in ELOG logo
ID Date Author Project Subject Run Number Events StartTime EndTimedown Data
  31   Tue Oct 4 22:11:12 2011 Christian IrmlerBELLEOrigami stackrun00533000004.10.2011 22:09:3705.10.2011 09:11:54Crap

Origami6
HV=+-40V, no cooling
beam on
Istart=95,2µA
pos: x=306, y=87 (centered)

longterm files (same files used for cal004 and run005):
It-pos-0410112056.txt 
It-neg-0410112056.txt  

currents and temp:
05.10.2011  09:11:21  event=329649  rate=0events/s temp/curr=33.0/-23.9 33.0/-28.9 33.0/-28.9 32.0/020.1 32.0/025.0 32.0/060.0

  89   Mon Mar 5 19:06:41 2012 Christian IrmlerBELLEOrigami Module #4cal1108380005.03.2012 19:05:5205.03.2012 19:17:01Unknown

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

  88   Mon Mar 5 18:41:23 2012 Christian IrmlerBELLEOrigami Module #4run110100k05.03.2012 18:45:2105.03.2012 19:04:30Unknown

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

  87   Mon Mar 5 18:08:02 2012 Christian IrmlerBELLEOrigami Module #4cal1098380005.03.2012 18:07:4005.03.2012 18:18:32Unknown

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 1

J7... HV ret @ hybrid

  86   Mon Mar 5 17:36:46 2012 Christian IrmlerBELLEOrigami Module #4run109100k05.03.2012 17:36:19 05.03.2012 17:55:24 Unknown

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 1

J7... HV ret @ hybrid

  85   Mon Mar 5 17:35:31 2012 Christian IrmlerBELLEOrigami Module #4cal1088380005.03.2012 16:47:5105.03.2012 17:05:16Unknown

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 0 1

J7... HV ret @ hybrid

Attachment 1: run108-109.jpg
run108-109.jpg
  84   Mon Mar 5 17:34:43 2012 Christian IrmlerBELLEOrigami Module #4run108100k 05.03.2012 16:24:12Unknown

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 0 1

J7... HV ret @ hybrid

  30   Tue Oct 4 21:40:52 2011 Christian IrmlerBELLEOrigami stackcal0048380004.10.2011 21:18:0904.10.2011 21:50:23Good

Origami6
HV=+-40V, no cooling
beam on
I=91µA

longterm files (same files used for cal004 and run005):
It-pos-0410112056.txt 
It-neg-0410112056.txt  

currents and temperatures:
04.10.2011  21:50:13  event=83750  rate=50events/s temp/curr=35.2/-26.1 35.2/-28.7 35.2/-31.4 34.6/022.6 34.6/025.0 34.6/060.4
 

  29   Tue Oct 4 15:16:45 2011 Manfred ValentanMicronMicron-Baby-Stack p-spray, run bottom right NOT USABLErun004200k4.10.2011 15:28:4804.10.2011 19:36:50Crap

HAS TO BE REPEATED!!! Before this run there were changes in the trigger line (vetoing the trigger when no spill), and thus the timing is incorrect.

hit modules in bottom right corner -> Zones narrow and half-narrow for COMB_IRRAD, Zones wide and half-wide for COMM_IRRAD

Position of HEPHY x-z-table:
x = 322
z = 89

  28   Tue Oct 4 15:16:06 2011 Manfred ValentanMicronMicron-Baby-Stack p-spray, run bottom leftrun003200k04.10.2011 11:29:1904.10.2011 13:57:54Good

hit modules in bottom left corner -> Zones wide and half-wide for COMB_IRRAD, Zones narrow and half-narrow for BOMM_IRRAD

Position of HEPHY x-z-table:
x = 336
z = 89

  26   Tue Oct 4 10:44:48 2011 Christian IrmlerMicronInternal Calibrationcal0038380004.10.2011 10:33:5004.10.2011 10:48:51 

micronbaby p-spray/irrad
HV = -100V
beam on, baseline of irrad APV reduced

APV #2 (I²C addr. 40) deactivated, latency error after initialization, reset line open?

  25   Tue Oct 4 10:44:09 2011 Christian IrmlerMicronInternal Calibrationcal0028380004.10.2011 10:04:4904.10.2011 10:19:41 

micronbaby p-spray/irrad
HV = -100V
beam on,

irrad APVs with standard baseline settings --> too high

APV #2 (I²C addr. 40) deactivated, latency error after initialization, reset line open?

  24   Tue Oct 4 00:11:31 2011 Manfred ValentanMicronMicron-Baby-Stack p-stop, zones w & h-wrun00276000004.10.2011 00:11:0604.10.2011 09:01:06Good

hit modules in bottom left corner -> Zones wide and half-wide for all modules

Position of HEPHY x-z-table:
x = 336
z = 89

  22   Mon Oct 3 21:01:00 2011 Manfred ValentanMicronMicron-Baby-Stack p-stop, zones n & h-nrun001200k03.10.2011 20:54:2203.10.2011 23:25:47Good

hit modules in top right corner -> Zones narrow and half-narrow for all modules

Position of HEPHY x-z-table:
x = 324
z = 103

  27   Tue Oct 4 10:47:59 2011 Manfred ValentanMicronInternal Calibrationcal0018380003.10.2011 20:34:4803.10.2011 20:50:57 

micronbaby p-stop stack
HV = -100V
beam on

  91   Wed Mar 7 15:12:42 2012 Christian IrmlerBELLEOrigami Module #4run112100k07.03.2012 15:13:18 07.03.2012 14:31:07Unknown

Sr90, small (new) scintillator, new trigger unit
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-19,6°C, Tout=-21.3°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

  8   Fri Sep 16 11:01:15 2011 Manfred ValentanMicronMicron Baby Modules     

Irradiated modules from last year:

COMB-IRRAD: B2Micron_2826_19_Baby4: combined p-stop, intermediate strips (was DUT4)
COMM-IRRAD: B2Micron_2826_07_Baby2: common p-stop, intermediate strips (was DUT3)
(the irradiated atoll p-stop sensor was destroyed for electron microscopy and SRP)

Unirradiated modules from last year:

COMB-1: B2Micron_2826_01_Baby4: combined p-stop, intermediate strips (was TRK6)
COMM-1: B2Micron_2826_19_Baby2: common p-stop, intermediate strips (was TRK7)
ATOLL-1: B2Micron_2826_07_Baby3: atoll p-stop, intermediate strips (was prepared, but not used in the beam test)

New modules:

SPRAY-I-1: B2Micron_2825_15_Baby2: p-spray, intermediate strips
SPRAY-I-2: B2Micron_2825_15_Baby3: p-spray, intermediate strips
SPRAY-1: B2Micron_2825_05_Baby3: p-spray, no intermediate strips
SPRAY-2: B2Micron_2825_05_Baby4: p-spray, no intermediate strips
COMB-2: B2Micron_2826_17_Baby4: combined p-stop, intermediate strips
COMM-2: B2Micron_2826_17_Baby2: common p-stop, intermediate strips
ATOLL-2: B2Micron_2826_17_Baby3: atoll p-stop, intermediate strips

 

  9   Mon Sep 19 17:38:34 2011 Manfred ValentanMicronModule ATOLL-2     

Sensor: B2Micron_2826_17_Baby3

p-stop: Atoll, with intermediate strips

Hybrid p-side: H35 (reused from last year)
Hybrid n-side: MB3

  10   Mon Sep 19 17:39:09 2011 Manfred ValentanMicronModule COMM-2     

Sensor: B2Micron_2826_17_Baby2

p-stop: Common, with intermediate strips

Hybrid p-side: H34 (reused from last year)
Hybrid n-side: MB4

  11   Mon Sep 19 17:39:55 2011 Manfred ValentanMicronModule COMB-2     

Sensor: B2Micron_2826_17_Baby4

p-stop: Combined with intermediate strips

Hybrid p-side: H42 (reused from last year)
Hybrid n-side: MB3

ELOG V3.1.5-fc6679b