Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011, Page 3 of 5  Not logged in ELOG logo
Entry  Tue Oct 4 22:11:12 2011, Christian Irmler, BELLE, Origami stack, run005, 330000, 04.10.2011 22:09:37, 05.10.2011 09:11:54, Crap 

Origami6
HV=+-40V, no cooling
beam on
Istart=95,2µA
pos: x=306, y=87 (centered)

longterm files (same files used for cal004 and run005):
It-pos-0410112056.txt 
It-neg-0410112056.txt  

currents and temp:
05.10.2011  09:11:21  event=329649  rate=0events/s temp/curr=33.0/-23.9 33.0/-28.9 33.0/-28.9 32.0/020.1 32.0/025.0 32.0/060.0

Entry  Mon Mar 5 19:06:41 2012, Christian Irmler, BELLE, Origami Module #4, cal110, 83800, 05.03.2012 19:05:52, 05.03.2012 19:17:01, Unknown 

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

Entry  Mon Mar 5 18:41:23 2012, Christian Irmler, BELLE, Origami Module #4, run110, 100k, 05.03.2012 18:45:21, 05.03.2012 19:04:30, Unknown 

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

Entry  Mon Mar 5 18:08:02 2012, Christian Irmler, BELLE, Origami Module #4, cal109, 83800, 05.03.2012 18:07:40, 05.03.2012 18:18:32, Unknown 

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 1

J7... HV ret @ hybrid

Entry  Mon Mar 5 17:36:46 2012, Christian Irmler, BELLE, Origami Module #4, run109, 100k, 05.03.2012 17:36:19 , 05.03.2012 17:55:24 , Unknown 

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 1

J7... HV ret @ hybrid

Entry  Mon Mar 5 17:35:31 2012, Christian Irmler, BELLE, Origami Module #4, cal108, 83800, 05.03.2012 16:47:51, 05.03.2012 17:05:16, Unknown run108-109.jpg

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 0 1

J7... HV ret @ hybrid

Entry  Mon Mar 5 17:34:43 2012, Christian Irmler, BELLE, Origami Module #4, run108, 100k, , 05.03.2012 16:24:12, Unknown 

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 0 1

J7... HV ret @ hybrid

Entry  Tue Oct 4 21:40:52 2011, Christian Irmler, BELLE, Origami stack, cal004, 83800, 04.10.2011 21:18:09, 04.10.2011 21:50:23, Good 

Origami6
HV=+-40V, no cooling
beam on
I=91µA

longterm files (same files used for cal004 and run005):
It-pos-0410112056.txt 
It-neg-0410112056.txt  

currents and temperatures:
04.10.2011  21:50:13  event=83750  rate=50events/s temp/curr=35.2/-26.1 35.2/-28.7 35.2/-31.4 34.6/022.6 34.6/025.0 34.6/060.4
 

Entry  Tue Oct 4 15:16:45 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-spray, run bottom right NOT USABLE, run004, 200k, 4.10.2011 15:28:48, 04.10.2011 19:36:50, Crap 

HAS TO BE REPEATED!!! Before this run there were changes in the trigger line (vetoing the trigger when no spill), and thus the timing is incorrect.

hit modules in bottom right corner -> Zones narrow and half-narrow for COMB_IRRAD, Zones wide and half-wide for COMM_IRRAD

Position of HEPHY x-z-table:
x = 322
z = 89

Entry  Tue Oct 4 15:16:06 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-spray, run bottom left, run003, 200k, 04.10.2011 11:29:19, 04.10.2011 13:57:54, Good 

hit modules in bottom left corner -> Zones wide and half-wide for COMB_IRRAD, Zones narrow and half-narrow for BOMM_IRRAD

Position of HEPHY x-z-table:
x = 336
z = 89

Entry  Tue Oct 4 10:44:48 2011, Christian Irmler, Micron, Internal Calibration, cal003, 83800, 04.10.2011 10:33:50, 04.10.2011 10:48:51,  

micronbaby p-spray/irrad
HV = -100V
beam on, baseline of irrad APV reduced

APV #2 (I²C addr. 40) deactivated, latency error after initialization, reset line open?

Entry  Tue Oct 4 10:44:09 2011, Christian Irmler, Micron, Internal Calibration, cal002, 83800, 04.10.2011 10:04:49, 04.10.2011 10:19:41,  

micronbaby p-spray/irrad
HV = -100V
beam on,

irrad APVs with standard baseline settings --> too high

APV #2 (I²C addr. 40) deactivated, latency error after initialization, reset line open?

Entry  Tue Oct 4 00:11:31 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-stop, zones w & h-w, run002, 760000, 04.10.2011 00:11:06, 04.10.2011 09:01:06, Good 

hit modules in bottom left corner -> Zones wide and half-wide for all modules

Position of HEPHY x-z-table:
x = 336
z = 89

Entry  Mon Oct 3 21:01:00 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-stop, zones n & h-n, run001, 200k, 03.10.2011 20:54:22, 03.10.2011 23:25:47, Good 

hit modules in top right corner -> Zones narrow and half-narrow for all modules

Position of HEPHY x-z-table:
x = 324
z = 103

Entry  Tue Oct 4 10:47:59 2011, Manfred Valentan, Micron, Internal Calibration, cal001, 83800, 03.10.2011 20:34:48, 03.10.2011 20:50:57,  

micronbaby p-stop stack
HV = -100V
beam on

Entry  Wed Mar 7 15:12:42 2012, Christian Irmler, BELLE, Origami Module #4, run112, 100k, 07.03.2012 15:13:18, 07.03.2012 14:31:07, Unknown 

Sr90, small (new) scintillator, new trigger unit
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-19,6°C, Tout=-21.3°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

Entry  Fri Sep 16 11:01:15 2011, Manfred Valentan, Micron, Micron Baby Modules, , , , ,  

Irradiated modules from last year:

COMB-IRRAD: B2Micron_2826_19_Baby4: combined p-stop, intermediate strips (was DUT4)
COMM-IRRAD: B2Micron_2826_07_Baby2: common p-stop, intermediate strips (was DUT3)
(the irradiated atoll p-stop sensor was destroyed for electron microscopy and SRP)

Unirradiated modules from last year:

COMB-1: B2Micron_2826_01_Baby4: combined p-stop, intermediate strips (was TRK6)
COMM-1: B2Micron_2826_19_Baby2: common p-stop, intermediate strips (was TRK7)
ATOLL-1: B2Micron_2826_07_Baby3: atoll p-stop, intermediate strips (was prepared, but not used in the beam test)

New modules:

SPRAY-I-1: B2Micron_2825_15_Baby2: p-spray, intermediate strips
SPRAY-I-2: B2Micron_2825_15_Baby3: p-spray, intermediate strips
SPRAY-1: B2Micron_2825_05_Baby3: p-spray, no intermediate strips
SPRAY-2: B2Micron_2825_05_Baby4: p-spray, no intermediate strips
COMB-2: B2Micron_2826_17_Baby4: combined p-stop, intermediate strips
COMM-2: B2Micron_2826_17_Baby2: common p-stop, intermediate strips
ATOLL-2: B2Micron_2826_17_Baby3: atoll p-stop, intermediate strips

 

Entry  Mon Sep 19 17:38:34 2011, Manfred Valentan, Micron, Module ATOLL-2, , , , ,  

Sensor: B2Micron_2826_17_Baby3

p-stop: Atoll, with intermediate strips

Hybrid p-side: H35 (reused from last year)
Hybrid n-side: MB3

Entry  Mon Sep 19 17:39:09 2011, Manfred Valentan, Micron, Module COMM-2, , , , ,  

Sensor: B2Micron_2826_17_Baby2

p-stop: Common, with intermediate strips

Hybrid p-side: H34 (reused from last year)
Hybrid n-side: MB4

Entry  Mon Sep 19 17:39:55 2011, Manfred Valentan, Micron, Module COMB-2, , , , ,  

Sensor: B2Micron_2826_17_Baby4

p-stop: Combined with intermediate strips

Hybrid p-side: H42 (reused from last year)
Hybrid n-side: MB3

ELOG V3.1.5-fc6679b