Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 8 of 8  Not logged in ELOG logo
ID Date Author Project Subject Run Number Events StartTimedown EndTime Text Attachments
  94   Wed Oct 6 23:02:09 2010 Marko DragiceviccommonBeam Configuration    Beam Settings and Profile on 5.10.2010
- 17:00h
Saved as: H6B.801
 BeamProfile.gifBeamMagnets.gifBeamColli.gif 
  101   Fri Oct 8 23:22:32 2010 Manfred ValentanBELLESchnittwinkel barrel vs. slanted    17deg acceptance => Schnittwinkel barrel
option = 90-17 = 73deg     
----->  rotary table 80.5
  
  107   Sat Oct 9 18:56:35 2010 Thomas Bergauercommonpath to telescope data    eudetmac001.cern.ch
path is /Volumes/Data/eudet/Data/cern_2010_sept_silc_apvdaq
(Vienna system)
  
  111   Tue Oct 19 14:58:56 2010 Manfred ValentanMicron Babygeometry       IMG_8888.JPGmicron_baby_stack_telescope_geometry.JPGmicron_baby_stack_telectope_geometry.dwg 
  116   Fri Apr 8 13:25:58 2011 Manfred ValentanMicron Babysensors and modules    TRK1: B2Micron_2826_1_baby2
TRK2: B2Micron_2826_1_baby3
DUT3: B2Micron_2826_7_baby2 (common
  
  120   Wed May 4 15:14:31 2011 Thomas BergauerPtinfo about module    pt-Modul hat jeweils zwei OB1 Sensoren
von STM (mit 122um Pitch)
im Abstand von 2mm uebereinander
  
  135   Tue May 17 19:08:29 2011 Manfred ValentanMicron Babysensors for source test with intermediate strips    Every second bond of these sensors will
be removed to mimic the effect of an intermediate
strip. For comparison, this is done both
  
ELOG V3.1.5-fc6679b