Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 8 of 8  Not logged in ELOG logo
ID Date Authorup Project Subject Run Number Events StartTime EndTime Text Attachments
  55   Sat Oct 2 09:57:20 2010 Thomas BergauerCNMrunrun025150k02.10.2010 09:54:2802.10.2010 14:21:20 CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA,
 run20122.pngslowcontrol_cnm.pngcnm_2d_1.pngcnm_2d_2.png 
  59   Sat Oct 2 17:27:14 2010 Thomas BergauerITEcalcal0078380002.10.2010 17:11:18  ITE: 2 DUTs
2 x SILC + 2 x ITE
 intcal_ITE10PAD_W7.pngintcal_ITE10PAD_W9.png 
  91   Wed Oct 6 11:51:25 2010 Thomas BergauerMicron Babyrunrun049448906.10.2010 11:38:2106.10.2010 11:49:238 x Micron Baby (3 irradiated), no cooling
HV=100V
I=141uA (start of run)
beam on 
not yet optimized XY-table positions
  
  105   Sat Oct 9 12:25:36 2010 Thomas BergauerBELLErunrun05727647509.10.2010 12:22:2109.10.2010 15:08:46 
Origami1 (n-side only) + Micron1
(non-irrad)
  
  107   Sat Oct 9 18:56:35 2010 Thomas Bergauercommonpath to telescope data    eudetmac001.cern.ch
path is /Volumes/Data/eudet/Data/cern_2010_sept_silc_apvdaq
(Vienna system)
  
  109   Sun Oct 10 15:45:04 2010 Thomas Bergauercommonend of success  09.10.2010 19:44:23NaN ;-) 
genau das gleiche wollte ich auch
gerade schreiben!
  
  120   Wed May 4 15:14:31 2011 Thomas BergauerPtinfo about module    pt-Modul hat jeweils zwei OB1 Sensoren
von STM (mit 122um Pitch)
im Abstand von 2mm uebereinander
  
ELOG V3.1.5-fc6679b