ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
38
|
Wed Sep 29 18:53:05 2010 |
Thomas Bergauer | Micron Baby | XY Positions | | | | |
center position: 113/47/7.5
top left (direction jura): 121/53.5/7.5
bottom right (direction saleve): 105/40.5/7.5 |
42
|
Thu Sep 30 10:56:34 2010 |
Christian Irmler | common | Room numbers | | | | |
Room and telefone numbers.
Name |
Building |
Room |
Tel. |
Bergi |
38 |
418 |
70 418 or 162471 (mobile) |
Markus |
41 |
021 |
60 021 |
Manfred |
38 |
404 |
70 404 |
Erik |
38 |
463 |
70 463 |
Immanuel |
38 |
313 |
70 313 |
Chrisu |
39 |
324 |
79 324
|
Marko |
39 |
007 |
79 007 |
Paqui |
38 |
107 |
70 107 |
|
44
|
Thu Sep 30 15:06:28 2010 |
Markus Friedl | Micron Baby | cal | cal006 | 83800 | 30.09.2010 15:01:56 | |
micron baby: 4 DUTs - angle scan
HV=100V I=6.8uA
Beam off (turned on at ~8k events)
|
56
|
Sat Oct 2 15:24:00 2010 |
Erik Huemer | ITE | XY Position and Slow Control | | | | |
center position: 119/48/187,5
|
Attachment 1: ITE128_SlowControl_FirstRun.png
|
|
59
|
Sat Oct 2 17:27:14 2010 |
Thomas Bergauer | ITE | cal | cal007 | 83800 | 02.10.2010 17:11:18 | |
ITE: 2 DUTs
2 x SILC + 2 x ITE
HV=100V
Beam on
one short only per sensor |
Attachment 1: intcal_ITE10PAD_W7.png
|
|
Attachment 2: intcal_ITE10PAD_W9.png
|
|
62
|
Sun Oct 3 08:14:39 2010 |
Markus Friedl | ITE | cal | cal008 | 83800 | 03.10.2010 08:13:06 | |
6 x SILC + 2 x ITE
HV=100V
telescope position: 119
no beam (technical problem) |
64
|
Sun Oct 3 14:35:12 2010 |
Marko Dragicevic | CNM | cal | cal009 | 83800 | 03.10.2010 13:50:54 | |
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
DUT outside of beam
calibration started after 1 hour warmup |
Attachment 1: cal009_cal_apv6.png
|
|
Attachment 2: cal009_cal_apv7.png
|
|
Attachment 3: slowcontrol_CNM_cal009.gif
|
|
65
|
Sun Oct 3 16:23:20 2010 |
Erik Huemer | Pt | XY/R Position | | | | |
centerposition: 119/43/187,5
27 grad: 214,5 |
66
|
Sun Oct 3 18:23:27 2010 |
Christian Irmler | Pt | cal | cal010 | 83800 | 03.10.2010 18:26:49 | |
pt modules angle scan
h01-Pt and h02-Pt
currents: h01=23.1µA h02=10.4µA
HV=200V
beam on
modules flushed with dry air
|
Attachment 1: slowcontrol_pt_cal010.gif
|
|
67
|
Sun Oct 3 18:52:56 2010 |
Christian Irmler | Pt | run | run030 | 25600 | 03.10.2010 19:16:29 | |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=23.1A h02=10.4A
HV=200V beam on
angle: 27
telescope run 20134 |
68
|
Sun Oct 3 20:44:40 2010 |
Erik Huemer | Pt | run | run031 | 25600 | 03.10.2010 19:42:34 | |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=20.5A h02=6.5A
HV=200V beam on
angle: 29
telescope run 20135 |
72
|
Mon Oct 4 09:31:25 2010 |
Manfred Valentan | Pt | run | run035 | 25600 | 04.10.2010 09:28:40 | |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=24.7A h02=11.8A
HV=200V beam on
angle: 35 deg
telescope run 20140 |
78
|
Mon Oct 4 15:39:34 2010 |
Christian Irmler | Pt | run | run041 | 25600 | 04.10.2010 15:46:22 | |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
HV=200V beam on
angle: 45 deg
position axis = 232.5
repetition of run039
telescope run20147 |
80
|
Mon Oct 4 16:29:36 2010 |
Christian Irmler | common | beam settings | | | | |
beam settings optimized by beamline operator
wire champer display fixed |
Attachment 1: beamprofile_run042.gif
|
|
Attachment 2: beamsettings_run042.jpg
|
|
81
|
Mon Oct 4 20:16:19 2010 |
Christian Irmler | BELLE | cal | cal011 | 83800 | 04.10.2010 20:15:00 | |
angle scan Origami 1 and Micron wedge 1
HV = 100V
chiller set to 14°C
HV connection of Origami 1 repaired |
89
|
Wed Oct 6 10:15:26 2010 |
Marko Dragicevic | Micron Baby | XY Positions After Irradiation | | | | |
center position: 119/50/(7.5)
top left (direction jura, bottom right on sensor): 127/56.5/7.5
bottom right (direction saleve, top left on sensor): 111/43.5/7.5 |
90
|
Wed Oct 6 11:03:59 2010 |
Marko Dragicevic | Micron Baby | cal | cal013 | 83800 | 06.10.2010 11:03:12 | |
8 x Micron Baby (3 irradiated), no cooling
HV=100V I=115uA (start of run)
beam off
# VADJ/VPSP increased to 48 (was 30) for irradiated DUTs to restore baseline position (higher after irradiation)
ADC delay timing did not change after irradiation (verified)
|
94
|
Wed Oct 6 23:02:09 2010 |
Marko Dragicevic | common | Beam Configuration | | | | |
Beam Settings and Profile on 5.10.2010 - 17:00h
Saved as: H6B.801 |
Attachment 1: BeamProfile.gif
|
|
Attachment 2: BeamMagnets.gif
|
|
Attachment 3: BeamColli.gif
|
|
97
|
Fri Oct 8 17:26:36 2010 |
Markus Friedl | BELLE | cal | cal015 | 83800 | 08.10.2010 17:22:44 | |
Belle stack without Origami2
HV=11V I=32uA
beam on
2 suspicious APVs on n side of Micron due to burnt strip
trying to identify problematic Micron n side channels with low bias voltage (APV22 baseline saturates at higher bias) |
100
|
Fri Oct 8 23:05:03 2010 |
Markus Friedl | BELLE | cal | cal016 | 83800 | 08.10.2010 23:03:16 | |
Belle stack w/o Origami2 after irradiation
HV=80V / 258 µA
cooling: Origami only, chiller set to -25°C,
2 suspicious APVs on n side of Micron due to burnt strip
Bias connection of Origami repaired --> lower noise on p-side |