Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 7 of 8  Not logged in ELOG logo
Entry  Wed Sep 29 18:53:05 2010, Thomas Bergauer, Micron Baby, XY Positions, , , ,  

center position: 113/47/7.5

top left (direction jura): 121/53.5/7.5

bottom right (direction saleve): 105/40.5/7.5

Entry  Thu Sep 30 10:56:34 2010, Christian Irmler, common, Room numbers, , , ,  

Room and telefone numbers.

 

Name Building Room Tel.
Bergi 38 418 70 418 or 162471 (mobile)
Markus 41 021 60 021
Manfred 38 404 70 404
Erik 38 463 70 463
Immanuel 38 313 70 313
Chrisu 39 324

79 324

Marko 39 007 79 007
Paqui 38 107 70 107

 

Entry  Thu Sep 30 15:06:28 2010, Markus Friedl, Micron Baby, cal, cal006, 83800, 30.09.2010 15:01:56,  

micron baby: 4 DUTs - angle scan
HV=100V I=6.8uA
Beam off (turned on at ~8k events)
 

Entry  Sat Oct 2 15:24:00 2010, Erik Huemer, ITE, XY Position and Slow Control, , , ,  ITE128_SlowControl_FirstRun.png

center position: 119/48/187,5

 

Entry  Sat Oct 2 17:27:14 2010, Thomas Bergauer, ITE, cal, cal007, 83800, 02.10.2010 17:11:18 ,  intcal_ITE10PAD_W7.pngintcal_ITE10PAD_W9.png

ITE: 2 DUTs
2 x SILC + 2 x ITE
HV=100V

Beam on 

one short only per sensor

Entry  Sun Oct 3 08:14:39 2010, Markus Friedl, ITE, cal, cal008, 83800, 03.10.2010 08:13:06,  

6 x SILC + 2 x ITE
HV=100V
telescope position: 119

no beam (technical problem)

Entry  Sun Oct 3 14:35:12 2010, Marko Dragicevic, CNM, cal, cal009, 83800, 03.10.2010 13:50:54,  cal009_cal_apv6.pngcal009_cal_apv7.pngslowcontrol_CNM_cal009.gif

CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
DUT outside of beam

calibration started after 1 hour warmup

Entry  Sun Oct 3 16:23:20 2010, Erik Huemer, Pt, XY/R Position, , , ,  

centerposition: 119/43/187,5

27 grad: 214,5

Entry  Sun Oct 3 18:23:27 2010, Christian Irmler, Pt, cal, cal010, 83800, 03.10.2010 18:26:49 ,  slowcontrol_pt_cal010.gif

pt modules angle scan
h01-Pt and h02-Pt
currents: h01=23.1µA h02=10.4µA
HV=200V
beam on

modules flushed with dry air

 

Entry  Sun Oct 3 18:52:56 2010, Christian Irmler, Pt, run, run030, 25600, 03.10.2010 19:16:29,  

Pt modules, angle scan

h01-Pt and h02-Pt
currents: h01=23.1A h02=10.4A
HV=200V beam on
angle: 27

telescope run 20134

Entry  Sun Oct 3 20:44:40 2010, Erik Huemer, Pt, run, run031, 25600, 03.10.2010 19:42:34,  

Pt modules, angle scan

h01-Pt and h02-Pt
currents: h01=20.5A h02=6.5A
HV=200V beam on
angle: 29

telescope run 20135

Entry  Mon Oct 4 09:31:25 2010, Manfred Valentan, Pt, run, run035, 25600, 04.10.2010 09:28:40,  

Pt modules, angle scan

h01-Pt and h02-Pt
currents: h01=24.7A h02=11.8A
HV=200V beam on
angle: 35 deg

telescope run 20140

Entry  Mon Oct 4 15:39:34 2010, Christian Irmler, Pt, run, run041, 25600, 04.10.2010 15:46:22,  

Pt modules, angle scan

h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
HV=200V beam on
angle: 45 deg
position axis = 232.5

repetition of run039

telescope run20147

Entry  Mon Oct 4 16:29:36 2010, Christian Irmler, common, beam settings, , , ,  beamprofile_run042.gifbeamsettings_run042.jpg

beam settings optimized by beamline operator

wire champer display fixed

Entry  Mon Oct 4 20:16:19 2010, Christian Irmler, BELLE, cal, cal011, 83800, 04.10.2010 20:15:00,  

angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C

HV connection of Origami 1 repaired

Entry  Wed Oct 6 10:15:26 2010, Marko Dragicevic, Micron Baby, XY Positions After Irradiation, , , ,  

center position: 119/50/(7.5)

top left (direction jura, bottom right on sensor): 127/56.5/7.5

bottom right (direction saleve, top left on sensor): 111/43.5/7.5

Entry  Wed Oct 6 11:03:59 2010, Marko Dragicevic, Micron Baby, cal, cal013, 83800, 06.10.2010 11:03:12,  

8 x Micron Baby (3 irradiated), no cooling
HV=100V I=115uA (start of run)
beam off

# VADJ/VPSP increased to 48 (was 30) for irradiated DUTs to restore baseline position (higher after irradiation)

ADC delay timing did not change after irradiation (verified)
 

Entry  Wed Oct 6 23:02:09 2010, Marko Dragicevic, common, Beam Configuration, , , ,  BeamProfile.gifBeamMagnets.gifBeamColli.gif

Beam Settings and Profile on 5.10.2010 - 17:00h

Saved as: H6B.801

Entry  Fri Oct 8 17:26:36 2010, Markus Friedl, BELLE, cal, cal015, 83800, 08.10.2010 17:22:44,  

Belle stack without Origami2
HV=11V I=32uA

beam on

2 suspicious APVs on n side of Micron due to burnt strip

trying to identify problematic Micron n side channels with low bias voltage (APV22 baseline saturates at higher bias)

Entry  Fri Oct 8 23:05:03 2010, Markus Friedl, BELLE, cal, cal016, 83800, 08.10.2010 23:03:16,  

Belle stack w/o Origami2 after irradiation
HV=80V / 258 µA
cooling: Origami only, chiller set to -25°C,
2 suspicious APVs on n side of Micron due to burnt strip
 

Bias connection of Origami repaired --> lower noise on p-side

ELOG V3.1.5-fc6679b