Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 5 of 8  Not logged in ELOG logo
ID Date Author Project Subject Run Number Events StartTime EndTime Text Attachments
  69   Sun Oct 3 21:49:19 2010 Erik HuemerPtrunrun0322560003.10.2010 21:44:3003.10.2010 22.40.07Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=22.9A h02=6.9A
  
  68   Sun Oct 3 20:44:40 2010 Erik HuemerPtrunrun0312560003.10.2010 19:42:34 Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=20.5A h02=6.5A
  
  67   Sun Oct 3 18:52:56 2010 Christian IrmlerPtrunrun0302560003.10.2010 19:16:29 Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=23.1A h02=10.4A
  
  66   Sun Oct 3 18:23:27 2010 Christian IrmlerPtcalcal0108380003.10.2010 18:26:49  pt modules angle scan
h01-Pt and h02-Pt
currents: h01=23.1µA h02=10.4µA
 slowcontrol_pt_cal010.gif 
  65   Sun Oct 3 16:23:20 2010 Erik HuemerPtXY/R Position    centerposition: 119/43/187,5
27 grad: 214,5
  
  64   Sun Oct 3 14:35:12 2010 Marko DragicevicCNMcalcal0098380003.10.2010 13:50:54 CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA,
 cal009_cal_apv6.pngcal009_cal_apv7.pngslowcontrol_CNM_cal009.gif 
  63   Sun Oct 3 08:19:13 2010 Markus FriedlITErunrun0297500003.10.2010 08:33:2803.10.2010 10:50:27same as previous run
telescope run 20127
Configuration file for DAQ: cern10_ite_silc_single.cfg
  
  62   Sun Oct 3 08:14:39 2010 Markus FriedlITEcalcal0088380003.10.2010 08:13:06 6 x SILC + 2 x ITE
HV=100V
telescope position: 119
  
  61   Sat Oct 2 18:36:57 2010 Markus FriedlITErunrun02816226302.10.2010 18:34:0603.10.2010 08:11:13 6 x SILC + 2 x ITE
HV=100V
telescope position: 119
  
  60   Sat Oct 2 17:35:51 2010 Markus FriedlITErunrun027299902.10.2010 17:34:51 02.10.2010 17:38:392 x SILC + 2 x ITE
HV=100V
telescope position: 107
  
  59   Sat Oct 2 17:27:14 2010 Thomas BergauerITEcalcal0078380002.10.2010 17:11:18  ITE: 2 DUTs
2 x SILC + 2 x ITE
 intcal_ITE10PAD_W7.pngintcal_ITE10PAD_W9.png 
  58   Sat Oct 2 17:24:12 2010 Markus FriedlITErunrun026583402.10.2010 17:23:46 02.10.2010 17:31:512 x SILC + 2 x ITE
HV=100V
 
  
  56   Sat Oct 2 15:24:00 2010 Erik HuemerITEXY Position and Slow Control    center position: 119/48/187,5
 
 ITE128_SlowControl_FirstRun.png 
  55   Sat Oct 2 09:57:20 2010 Thomas BergauerCNMrunrun025150k02.10.2010 09:54:2802.10.2010 14:21:20 CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA,
 run20122.pngslowcontrol_cnm.pngcnm_2d_1.pngcnm_2d_2.png 
  54   Fri Oct 1 23:55:12 2010 Thomas BergauerCNMrunrun024320k01.10.2010 23:53:1202.10.2010 09:47:37CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA,
 cnm_2d_2.pngcnm_2d_1.png 
  53   Fri Oct 1 23:50:28 2010 Thomas BergauerCNMrunrun023227501.10.2010 23:49:2901.10.2010 23:53:12CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA,
  
  52   Fri Oct 1 23:18:34 2010 Markus FriedlCNMrunrun022813901.10.2010 23:17:02 01.10.2010 23:45:51CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA,
  
  51   Fri Oct 1 10:06:59 2010 Manfred ValentanMicron Babyrunrun0217500001.10.2010 10:07:3701.10.2010 15:24:44micron baby: 4 DUTs
HV=100V I=10.9uA (beginning) 
13.6uA (end of run)
 run021_sensordisplay1.jpghit_map_und_cluster.png 
  50   Fri Oct 1 09:42:02 2010 Erik HuemerMicron Babyrunrun020184301.10.2010 09:59:09 01.10.2010 10.05micron baby: 4 DUTs
HV=100V I=10.9uA
Beam on
  
  49   Fri Oct 1 09:33:45 2010 Immanuel GfallcommonEudet Hit Correlation, Num Clusters Screenshots201151611359:309:30   Eudet-Num_Clusters-run020115.jpgEudet-X_Cluster_Corr-run020115.jpg 
ELOG V3.1.5-fc6679b