Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 5 of 8  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Wed Oct 6 11:03:59 2010, Marko Dragicevic, Micron Baby, cal, cal013, 83800, 06.10.2010 11:03:12,  

8 x Micron Baby (3 irradiated), no cooling
HV=100V I=115uA (start of run)
beam off

# VADJ/VPSP increased to 48 (was 30) for irradiated DUTs to restore baseline position (higher after irradiation)

ADC delay timing did not change after irradiation (verified)
 

Entry  Wed Oct 6 23:03:15 2010, Marko Dragicevic, BELLE, cal, cal014, 83800, 06.10.2010 23:01:56, 06.10.2010 23:34:07 

Belle stack without Origami2
HV=80V I=227uA

beam on

Entry  Fri Oct 8 17:26:36 2010, Markus Friedl, BELLE, cal, cal015, 83800, 08.10.2010 17:22:44,  

Belle stack without Origami2
HV=11V I=32uA

beam on

2 suspicious APVs on n side of Micron due to burnt strip

trying to identify problematic Micron n side channels with low bias voltage (APV22 baseline saturates at higher bias)

Entry  Fri Oct 8 23:05:03 2010, Markus Friedl, BELLE, cal, cal016, 83800, 08.10.2010 23:03:16,  

Belle stack w/o Origami2 after irradiation
HV=80V / 258 µA
cooling: Origami only, chiller set to -25°C,
2 suspicious APVs on n side of Micron due to burnt strip
 

Bias connection of Origami repaired --> lower noise on p-side

Entry  Sat Oct 9 12:00:55 2010, Christian Irmler, BELLE, cal, cal017, 83800, 09.10.2010 11:59:37,  

Origami1 (n-side only) + Micron1 (non-irrad)
angle scan: 73°
HV=100V / 40 µA
cooling: chiller set to 15°C

Origami p-side does not receive triggers -> disabled

origami flex straight part needed to be folded due to severe rotation angle -> nanonics connector problem...

Entry  Mon Oct 4 16:29:36 2010, Christian Irmler, common, beam settings, , , ,  beamprofile_run042.gifbeamsettings_run042.jpg

beam settings optimized by beamline operator

wire champer display fixed

Entry  Sun Oct 3 16:23:20 2010, Erik Huemer, Pt, XY/R Position, , , ,  

centerposition: 119/43/187,5

27 grad: 214,5

Entry  Wed Oct 6 10:15:26 2010, Marko Dragicevic, Micron Baby, XY Positions After Irradiation, , , ,  

center position: 119/50/(7.5)

top left (direction jura, bottom right on sensor): 127/56.5/7.5

bottom right (direction saleve, top left on sensor): 111/43.5/7.5

Entry  Wed Sep 29 18:53:05 2010, Thomas Bergauer, Micron Baby, XY Positions, , , ,  

center position: 113/47/7.5

top left (direction jura): 121/53.5/7.5

bottom right (direction saleve): 105/40.5/7.5

Entry  Sat Oct 2 15:24:00 2010, Erik Huemer, ITE, XY Position and Slow Control, , , ,  ITE128_SlowControl_FirstRun.png

center position: 119/48/187,5

 

Entry  Mon Sep 27 18:54:47 2010, Thomas Bergauer, BELLE, XY Position, , , ,  

center position: 55/40/277,5

Entry  Tue Sep 28 14:38:24 2010, Christian Irmler, BELLE, Temperature sensors Belle stack, , , ,  

PicoLogic TC-08 temperature sensor assignment Belle stack:

Sensor type: K

channel 1:  Origami_mod1_in
channel 2:  Origami_mod1_out
channel 3:  Origami_mod2_in
channel 4:  Origami_mod2_out
channel 5:  Micron_wedge_mod1_p
channel 6:  Micron_wedge_mod1_n
channel 7:  Micron_wedge_mod2_p
channel 8:  Micron_wedge_mod2_n
 

The cooling pipes of the two Origami modules and that of the Micron modules are connected in series, respectively.

Entry  Tue Sep 28 22:09:39 2010, Markus Friedl, BELLE, Temperature sensors Belle stack, , , ,  

PicoLogic TC-08 temperature sensor assignment Belle stack:

Sensor type: K

channel 1:  Origami_mod1_in
channel 2:  Origami_mod1_out
channel 3:  Origami_mod2_out    (swapped with 4)  - label not changed
channel 4:  Origami_mod2_in      (swapped with 3)  - label not changed
channel 5:  Micron_wedge_mod1_p
channel 6:  Micron_wedge_mod1_n
channel 7:  Micron_wedge_mod2_p
channel 8:  Micron_wedge_mod2_n
 

The cooling pipes of the two Origami modules are connected in series, respectively.

Entry  Tue May 17 15:10:52 2011, Manfred Valentan, Micron Baby, TRK7, source run, unirrad, prezupf, cal110, 83800, 17.05.2011 15:16:25, 17.05.2011 15:24:35 

TRK7: B2Micron_2826_19_baby2 (common p-stop)
config file: D:/cern10/micronbaby/data_lab/TRK7/prezupf/micronbaby_single.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=1.1µA
I_end=1.7µA

Entry  Tue May 17 17:43:24 2011, Manfred Valentan, Micron Baby, TRK7, source run, unirrad, prezupf, run110, 100k, 17.05.2011 15:39:37, 17.05.2011 16:02:54 run110_all_hits_apv4.pngrun110_all_hits_apv5.pngcal110_pednoise_apv4.pngcal110_pednoise_apv5.png

DUT candidate common p-stop

TRK7: B2Micron_2826_19_baby2 (common p-stop)
config file: D:/cern10/micronbaby/data_lab/TRK7/prezupf/micronbaby_multi6.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=1.8µA
I_end=2.1µA

n-side: highest 32 strips of APV5 noisy = half of zone 4. Rest okay, DUT candidate

Entry  Wed May 18 15:36:03 2011, Manfred Valentan, Micron Baby, TRK7, source run, unirrad, postzupf, cal116, 83800, 18.05.2011 14:43:18, 18.05.2011 14:51:31 cal116_goodstrips_apv4.pngcal116_goodstrips_apv5.png

TRK7: B2Micron_2826_19_baby2 (common p-stop)
config file: D:/cern10/micronbaby/data_lab/TRK7/postzupf/micronbaby_single_postzupf.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=1.6µA
I_end=1.7µA

every second bond zupfed...

Entry  Wed May 18 15:38:29 2011, Manfred Valentan, Micron Baby, TRK7, source run, unirrad, postzupf, run116, 100k, 18.05.2011 15:02:05, 18.05.2011 15:24:07 6x

TRK7: B2Micron_2826_19_baby2 (common p-stop)
config file: D:/cern10/micronbaby/data_lab/TRK7/postzupf/micronbaby_multi6_postzupf.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=1.7µA
I_end=2.3µA

every second bond zupfed...

Entry  Tue May 17 14:36:36 2011, Manfred Valentan, Micron Baby, TRK6, source run, unirrad, prezupf, cal109, 83800, 17.05.2011 14:18:13, 17.05.2011 14:34:25 

TRK6: B2Micron_2826_1_baby4 (combined p-stop)
config file: D:/cern10/micronbaby/data_lab/TRK6/prezupf/micronbaby_multi6.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=1.3µA
I_end=1.8µA

Entry  Tue May 17 14:37:23 2011, Manfred Valentan, Micron Baby, TRK6, source run, unirrad, prezupf, run109, 100k, 17.05.2011 14:34:32, 17.05.2011 15:00:02 run109_all_hits_apv4.pngrun109_all_hits_apv5.pngcal109_pednoise_apv4.pngcal109_pednoise_apv5.png

DUT candidate combined p-stop

TRK6: B2Micron_2826_1_baby4 (combined p-stop)
config file: D:/cern10/micronbaby/data_lab/TRK6/prezupf/micronbaby_multi6.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=1.9µA
I_end=2.4µA

n-side zone 2 several unusable strips, zone 3 & 4 32 strips each suspicious. Nevertheless DUT candidate!

Entry  Wed May 18 14:40:33 2011, Manfred Valentan, Micron Baby, TRK6, source run, unirrad, postzupf, cal115, 83800, 18.05.2011 13:41:44, 18.05.2011 13:49:58 cal115_goodstrips_apv4.pngcal115_goodstrips_apv5.png

TRK6: B2Micron_2826_1_baby4 (combined p-stop)
config file: D:/cern10/micronbaby/data_lab/TRK6/postzupfzupf/micronbaby_single_postzupf.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=1.6µA
I_end=1.7µA

Every second bond zupfed. However, there was a mistake and the first ~60 channels are shifted by 1, see attachment!

ELOG V3.1.5-fc6679b