Sun Oct 3 18:52:56 2010, Christian Irmler, Pt, run, run030, 25600, 03.10.2010 19:16:29,
|
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=23.1A h02=10.4A |
Sun Oct 3 18:23:27 2010, Christian Irmler, Pt, cal, cal010, 83800, 03.10.2010 18:26:49 ,
|
pt modules angle scan
h01-Pt and h02-Pt
currents: h01=23.1µA h02=10.4µA |
Sun Oct 3 16:23:20 2010, Erik Huemer, Pt, XY/R Position, , , ,
|
centerposition: 119/43/187,5
27 grad: 214,5 |
Sun Oct 3 14:35:12 2010, Marko Dragicevic, CNM, cal, cal009, 83800, 03.10.2010 13:50:54,
|
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA |
Sun Oct 3 08:19:13 2010, Markus Friedl, ITE, run, run029, 75000, 03.10.2010 08:33:28, 03.10.2010 10:50:27
|
same as previous run
telescope run 20127
Configuration file for DAQ: cern10_ite_silc_single.cfg --> peak mode with 1 sample! |
Sun Oct 3 08:14:39 2010, Markus Friedl, ITE, cal, cal008, 83800, 03.10.2010 08:13:06,
|
6 x SILC + 2 x ITE
HV=100V
telescope position: 119 |
Sat Oct 2 18:36:57 2010, Markus Friedl, ITE, run, run028, 162263, 02.10.2010 18:34:06, 03.10.2010 08:11:13
|
6 x SILC + 2 x ITE
HV=100V
telescope position: 119 |
Sat Oct 2 17:35:51 2010, Markus Friedl, ITE, run, run027, 2999, 02.10.2010 17:34:51 , 02.10.2010 17:38:39
|
2 x SILC + 2 x ITE
HV=100V
telescope position: 107 |
Sat Oct 2 17:27:14 2010, Thomas Bergauer, ITE, cal, cal007, 83800, 02.10.2010 17:11:18 ,
|
ITE: 2 DUTs
2 x SILC + 2 x ITE
HV=100V |
Sat Oct 2 17:24:12 2010, Markus Friedl, ITE, run, run026, 5834, 02.10.2010 17:23:46 , 02.10.2010 17:31:51
|
2 x SILC + 2 x ITE
HV=100V
|
Sat Oct 2 15:24:00 2010, Erik Huemer, ITE, XY Position and Slow Control, , , ,
|
center position: 119/48/187,5
|
Sat Oct 2 09:57:20 2010, Thomas Bergauer, CNM, run, run025, 150k, 02.10.2010 09:54:28, 02.10.2010 14:21:20
|
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA |
Fri Oct 1 23:55:12 2010, Thomas Bergauer, CNM, run, run024, 320k, 01.10.2010 23:53:12, 02.10.2010 09:47:37
|
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA |
Fri Oct 1 23:50:28 2010, Thomas Bergauer, CNM, run, run023, 2275, 01.10.2010 23:49:29, 01.10.2010 23:53:12
|
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA |
Fri Oct 1 23:18:34 2010, Markus Friedl, CNM, run, run022, 8139, 01.10.2010 23:17:02 , 01.10.2010 23:45:51
|
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA |
Fri Oct 1 10:06:59 2010, Manfred Valentan, Micron Baby, run, run021, 75000, 01.10.2010 10:07:37, 01.10.2010 15:24:44
|
micron baby: 4 DUTs
HV=100V I=10.9uA (beginning) 13.6uA (end of run)
Beam on |
Fri Oct 1 09:42:02 2010, Erik Huemer, Micron Baby, run, run020, 1843, 01.10.2010 09:59:09 , 01.10.2010 10.05
|
micron baby: 4 DUTs
HV=100V I=10.9uA
Beam on |
Fri Oct 1 09:33:45 2010, Immanuel Gfall, common, Eudet Hit Correlation, Num Clusters Screenshots, 20115, 161135, 9:30, 9:30
|
[IMG]49/2[/IMG] |
Thu Sep 30 23:09:29 2010, Thomas Bergauer, Micron Baby, run, run019, 162000, 30.09.2010 23:08:03, 01.10.2010 9:33:38
|
micron baby: 4 DUTs
HV=100V I=12uA I_stop=15.4uA
Beam on |
Thu Sep 30 20:47:01 2010, Markus Friedl, Micron Baby, run, run018, 26938, 30.09.2010 20:45:48, 30.09.2010 22:25:25
|
micron baby: 4 DUTs
HV=100V I=13.7uA, I_stop=15.6uA
Beam on |
|