Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 5 of 8  Not logged in ELOG logo
Entry  Sun Oct 3 18:52:56 2010, Christian Irmler, Pt, run, run030, 25600, 03.10.2010 19:16:29,  
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=23.1A h02=10.4A
Entry  Sun Oct 3 18:23:27 2010, Christian Irmler, Pt, cal, cal010, 83800, 03.10.2010 18:26:49 ,  slowcontrol_pt_cal010.gif
pt modules angle scan
h01-Pt and h02-Pt
currents: h01=23.1µA h02=10.4µA
Entry  Sun Oct 3 16:23:20 2010, Erik Huemer, Pt, XY/R Position, , , ,  
centerposition: 119/43/187,5
27 grad: 214,5
Entry  Sun Oct 3 14:35:12 2010, Marko Dragicevic, CNM, cal, cal009, 83800, 03.10.2010 13:50:54,  cal009_cal_apv6.pngcal009_cal_apv7.pngslowcontrol_CNM_cal009.gif
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
Entry  Sun Oct 3 08:19:13 2010, Markus Friedl, ITE, run, run029, 75000, 03.10.2010 08:33:28, 03.10.2010 10:50:27 
same as previous run
telescope run 20127
Configuration file for DAQ: cern10_ite_silc_single.cfg --> peak mode with 1 sample!
Entry  Sun Oct 3 08:14:39 2010, Markus Friedl, ITE, cal, cal008, 83800, 03.10.2010 08:13:06,  
6 x SILC + 2 x ITE
HV=100V
telescope position: 119
Entry  Sat Oct 2 18:36:57 2010, Markus Friedl, ITE, run, run028, 162263, 02.10.2010 18:34:06, 03.10.2010 08:11:13  
6 x SILC + 2 x ITE
HV=100V
telescope position: 119
Entry  Sat Oct 2 17:35:51 2010, Markus Friedl, ITE, run, run027, 2999, 02.10.2010 17:34:51 , 02.10.2010 17:38:39 
2 x SILC + 2 x ITE
HV=100V
telescope position: 107
Entry  Sat Oct 2 17:27:14 2010, Thomas Bergauer, ITE, cal, cal007, 83800, 02.10.2010 17:11:18 ,  intcal_ITE10PAD_W7.pngintcal_ITE10PAD_W9.png
ITE: 2 DUTs
2 x SILC + 2 x ITE
HV=100V
Entry  Sat Oct 2 17:24:12 2010, Markus Friedl, ITE, run, run026, 5834, 02.10.2010 17:23:46 , 02.10.2010 17:31:51 
2 x SILC + 2 x ITE
HV=100V
 
Entry  Sat Oct 2 15:24:00 2010, Erik Huemer, ITE, XY Position and Slow Control, , , ,  ITE128_SlowControl_FirstRun.png
center position: 119/48/187,5
 
Entry  Sat Oct 2 09:57:20 2010, Thomas Bergauer, CNM, run, run025, 150k, 02.10.2010 09:54:28, 02.10.2010 14:21:20 run20122.pngslowcontrol_cnm.pngcnm_2d_1.pngcnm_2d_2.png
 CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
Entry  Fri Oct 1 23:55:12 2010, Thomas Bergauer, CNM, run, run024, 320k, 01.10.2010 23:53:12, 02.10.2010 09:47:37 cnm_2d_2.pngcnm_2d_1.png
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
Entry  Fri Oct 1 23:50:28 2010, Thomas Bergauer, CNM, run, run023, 2275, 01.10.2010 23:49:29, 01.10.2010 23:53:12 
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
Entry  Fri Oct 1 23:18:34 2010, Markus Friedl, CNM, run, run022, 8139, 01.10.2010 23:17:02 , 01.10.2010 23:45:51 
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
Entry  Fri Oct 1 10:06:59 2010, Manfred Valentan, Micron Baby, run, run021, 75000, 01.10.2010 10:07:37, 01.10.2010 15:24:44 run021_sensordisplay1.jpghit_map_und_cluster.png
micron baby: 4 DUTs
HV=100V I=10.9uA (beginning)  13.6uA (end of run)
Beam on
Entry  Fri Oct 1 09:42:02 2010, Erik Huemer, Micron Baby, run, run020, 1843, 01.10.2010 09:59:09 , 01.10.2010 10.05 
micron baby: 4 DUTs
HV=100V I=10.9uA
Beam on
Entry  Fri Oct 1 09:33:45 2010, Immanuel Gfall, common, Eudet Hit Correlation, Num Clusters Screenshots, 20115, 161135, 9:30, 9:30 Eudet-Num_Clusters-run020115.jpgEudet-X_Cluster_Corr-run020115.jpg

[IMG]49/2[/IMG]
Entry  Thu Sep 30 23:09:29 2010, Thomas Bergauer, Micron Baby, run, run019, 162000, 30.09.2010 23:08:03, 01.10.2010 9:33:38 run019_sensordisplay1.jpgEudet-X_Cluster_Corr-run020115.jpgEudet-Num_Clusters-run020115.jpg
micron baby: 4 DUTs
HV=100V I=12uA I_stop=15.4uA
Beam on
Entry  Thu Sep 30 20:47:01 2010, Markus Friedl, Micron Baby, run, run018, 26938, 30.09.2010 20:45:48, 30.09.2010 22:25:25 
micron baby: 4 DUTs
HV=100V I=13.7uA, I_stop=15.6uA
Beam on
ELOG V3.1.5-fc6679b