Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 4 of 8  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Project Subject Run Number Events StartTime EndTimedown Text Attachments
  105   Sat Oct 9 12:25:36 2010 Thomas BergauerBELLErunrun05727647509.10.2010 12:22:2109.10.2010 15:08:46 
Origami1 (n-side only) + Micron1
(non-irrad)
  
  103   Sat Oct 9 00:17:02 2010 Markus FriedlBELLErunrun056225k09.10.2010 00:15:5309.10.2010 09:54:28Belle stack w/o Origami2 after irradiation
HV=80V / I_start=255 µA, I_stop=243
µA  
  
  102   Fri Oct 8 23:43:07 2010 Christian IrmlerBELLErunrun0551231608.10.2010 23:42:5109.10.2010 00:14:56 Belle stack w/o Origami2 after irradiation
HV=80V / 255 µA 
cooling: Origami only, chiller set
  
  99   Fri Oct 8 18:12:43 2010 Markus FriedlBELLErunrun0549000008.10.2010 18:08:4808.10.2010 21:49:36 Belle stack w/o Origami2 after irradiation
HV=80V I=224uA (beginning of run)
2 suspicious APVs on Micron n side
  
  98   Fri Oct 8 18:12:15 2010 Christian IrmlerBELLErunrun0539800008.10.2010 00:33:1408.10.2010 13:36:57Belle stack w/o Origami2 after irradiation
HV=80V
Telescope position 55/30/277.5
  
  96   Wed Oct 6 23:48:49 2010 Markus FriedlBELLErunrun05216578906.10.2010 23:47:1207.10.2010 08:43:42Belle stack without Origami2
HV=80V I=217uA
telescope setting 103 / 30 / 277.5
  
  95   Wed Oct 6 23:03:15 2010 Marko DragicevicBELLEcalcal0148380006.10.2010 23:01:5606.10.2010 23:34:07Belle stack without Origami2
HV=80V I=227uA
beam on
  
  93   Wed Oct 6 16:33:55 2010 Markus FriedlMicron Babyrunrun0519000006.10.2010 16:32:0306.10.2010 20:59:588 x Micron Baby (3 irradiated), no cooling
HV=100V I=209uA (start of run, still
rising); 203uA (end of run)
  
  92   Wed Oct 6 11:59:29 2010 Markus FriedlMicron Babyrunrun0509000006.10.2010 11:57:5506.10.2010 15:30:378 x Micron Baby (3 irradiated), no cooling
HV=100V I=141uA (start of run)
beam on
  
  91   Wed Oct 6 11:51:25 2010 Thomas BergauerMicron Babyrunrun049448906.10.2010 11:38:2106.10.2010 11:49:238 x Micron Baby (3 irradiated), no cooling
HV=100V
I=141uA (start of run)
beam on 
not yet optimized XY-table positions
  
  88   Tue Oct 5 18:13:05 2010 Christian IrmlerITErunrun04853312505.10.2010 18:14:5706.10.2010 09:27:446 x SILC + 2 x ITE
HV=100V
telescope position: 124/48
 LongtermITERun2.png 
  87   Tue Oct 5 17:50:23 2010 Christian IrmlerITEcalcal0128380005.10.2010 17:50:2605.10.2010 18:09:48 6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48
  
  85   Tue Oct 5 10:20:30 2010 Manfred ValentanBELLErunrun4635000005.10.2010 01:00:0005.10.2010 10:16:07angle scan Origami 1 and  Micron wedge
1
HV = 100V
  
  84   Mon Oct 4 23:59:05 2010 Manfred ValentanBELLErunrun45 04.10.2010 ??:??:??05.10.2010 00:56:48angle scan Origami 1 and  Micron wedge
1
HV = 100V
  
  86   Tue Oct 5 10:23:09 2010 Manfred ValentanBELLErunrun473000005.10.2010 10:21:2005.10.2010 angle scan Origami 1 and  Micron wedge
1
HV = 100V
  
  76   Mon Oct 4 12:50:13 2010 Erik HuemerPtrunrun039 --> run out of air --> repeat2560004.10.2010 12:45:1704.10.2010 14:00:00Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
  
  71   Mon Oct 4 00:08:55 2010 Manfred ValentanPtrunrun03418700004.10.2010 00:03:1804.10.2010 09:22:07Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=21.9A h02=7.5A
  
  70   Sun Oct 3 22:53:49 2010 Manfred ValentanPtrunrun0332560003.10.2010 22.47:3804.10.2010 00:02:37Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=22.9A h02=6.9A
  
  82   Mon Oct 4 21:01:25 2010 Christian IrmlerBELLErunrun433000004.10.2010 20:59:4804.10.2010 23:04:24angle scan Origami 1 and  Micron wedge
1
HV = 100V
  
  83   Mon Oct 4 23:12:16 2010 Manfred ValentanBELLErunrun443000004.10.2010 23:?:?04.10.2010 23.57.23angle scan Origami 1 and  Micron wedge
1
HV = 100V
  
ELOG V3.1.5-fc6679b