Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 4 of 8  Not logged in ELOG logo
ID Date Author Project Subject Run Number Events StartTime EndTimedown
  105   Sat Oct 9 12:25:36 2010 Thomas BergauerBELLErunrun05727647509.10.2010 12:22:2109.10.2010 15:08:46

 

Origami1 (n-side only) + Micron1 (non-irrad)

angle scan: 73 degree

HV=100V / 36 uA  (beginning), 35uA (end of run)

cooling: chiller set to 15C

 PROBLEM: wrong config file (single hit, not multi6)

telescope run 20200

Origami p-side does not receive triggers -> disabled

origami flex straight part needed to be folded due to severe rotation angle -> nanonics connector problem...

 

  103   Sat Oct 9 00:17:02 2010 Markus FriedlBELLErunrun056225k09.10.2010 00:15:5309.10.2010 09:54:28

Belle stack w/o Origami2 after irradiation
HV=80V / I_start=255 µA, I_stop=243 µA  

cooling: Origami only, chiller set to -25°C,
2 suspicious APVs on n side of Micron (possibly due to burnt strip)

same position as in previous run

telescope run 20198 - now with correct telescope threshold settings

a lot of "Error detected in APV 21, subevent 2. Event discarded, reset sent." errors started at 09.10.2010 09:00:25 (after whole night without any error)

  102   Fri Oct 8 23:43:07 2010 Christian IrmlerBELLErunrun0551231608.10.2010 23:42:5109.10.2010 00:14:56

Belle stack w/o Origami2 after irradiation
HV=80V / 255 µA
cooling: Origami only, chiller set to -25°C,
2 suspicious APVs on n side of Micron due to burnt strip

same position as in previous run

telescope run 20197  - wrong config file @ telescope -> new run with correct settings

  99   Fri Oct 8 18:12:43 2010 Markus FriedlBELLErunrun0549000008.10.2010 18:08:4808.10.2010 21:49:36

Belle stack w/o Origami2 after irradiation

HV=80V I=224uA (beginning of run)

2 suspicious APVs on Micron n side

xy-table position 7 / 30 / 277.5 (shoots at the smaller edge of the trapezoidal sensor)

 

telescope run 20195

  98   Fri Oct 8 18:12:15 2010 Christian IrmlerBELLErunrun0539800008.10.2010 00:33:1408.10.2010 13:36:57

Belle stack w/o Origami2 after irradiation
HV=80V
Telescope position 55/30/277.5
NIM trigger

temperature of chiller set to 15°C

Analog signal of APVs #22 and #23 has been bound to ground after 1200 events.

  96   Wed Oct 6 23:48:49 2010 Markus FriedlBELLErunrun05216578906.10.2010 23:47:1207.10.2010 08:43:42

Belle stack without Origami2
HV=80V I=217uA
telescope setting 103 / 30 / 277.5
telescope run 20184

temperature of chiller set to 15°C

beam stopped at 7.10. 08:00 sharp, no beam until 8.10 - 8:00 according to SPS Page 1. We keep DAQ and telescope running and cross our fingers for at least some spills of particles.

 

Irradiated micron module 2, n-side: excessive hit count on channels at the edges of the APV chips - no such thing on the p-side

  95   Wed Oct 6 23:03:15 2010 Marko DragicevicBELLEcalcal0148380006.10.2010 23:01:5606.10.2010 23:34:07

Belle stack without Origami2
HV=80V I=227uA

beam on

  93   Wed Oct 6 16:33:55 2010 Markus FriedlMicron Babyrunrun0519000006.10.2010 16:32:0306.10.2010 20:59:58

8 x Micron Baby (3 irradiated), no cooling
HV=100V I=209uA (start of run, still rising); 203uA (end of run)
beam on, NIM trigger from TLU (no handshake)
telescope position 131 / 53.5 / 7.5
 

no telescope run - being tuned (some intervals during data taking are possible)

 

  92   Wed Oct 6 11:59:29 2010 Markus FriedlMicron Babyrunrun0509000006.10.2010 11:57:5506.10.2010 15:30:37

8 x Micron Baby (3 irradiated), no cooling
HV=100V I=141uA (start of run)
beam on
telescope position 118 / 41.1 / 7.5

 

no telescope run

  91   Wed Oct 6 11:51:25 2010 Thomas BergauerMicron Babyrunrun049448906.10.2010 11:38:2106.10.2010 11:49:23
8 x Micron Baby (3 irradiated), no cooling
HV=100V I=141uA (start of run)

beam on 

not yet optimized XY-table positions (111/43.5/7.5)

  88   Tue Oct 5 18:13:05 2010 Christian IrmlerITErunrun04853312505.10.2010 18:14:5706.10.2010 09:27:44

6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48
telescope run: 20154-20155

DUTs and SILC4/5 swapped
new module order (downstream): SILC0 - SILC3 - SILC1 - W7 - W9 - SILC2 - SILC4 -SILC5
SILC1 and SILC2 are horizontal

beam on

modules flushed with dry air (black tube)
rel. humidity: ~0% @ 26°C

Attachment 1: LongtermITERun2.png
LongtermITERun2.png
  87   Tue Oct 5 17:50:23 2010 Christian IrmlerITEcalcal0128380005.10.2010 17:50:2605.10.2010 18:09:48

6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48

DUTs and SILC4/5 swapped
new module order (downstream): SILC0 - SILC3 - SILC1 - W7 - W9 - SILC2 - SILC4 -SILC5
SILC1 and SILC2 are horizontal

beam on

modules flushed with dry air (black tube)
rel. humidity: ~0% @ 26°C

  85   Tue Oct 5 10:20:30 2010 Manfred ValentanBELLErunrun4635000005.10.2010 01:00:0005.10.2010 10:16:07

angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C

angle: 15°
axis 1: 92.4 (horizontal)
axis 2: 35 (vertical)
axis 3: -7.5 (rotary table)

telescope run: 20152

  84   Mon Oct 4 23:59:05 2010 Manfred ValentanBELLErunrun45 04.10.2010 ??:??:??05.10.2010 00:56:48

angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C

angle: 45°
axis 1: 92.4 (horizontal)
axis 2: 35 (vertical)
axis 3: -37.5 (rotary table)

telescope run: 20151

  86   Tue Oct 5 10:23:09 2010 Manfred ValentanBELLErunrun473000005.10.2010 10:21:2005.10.2010

angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C

angle: 0°
axis 1: 92.4 (horizontal)
axis 2: 35 (vertical)
axis 3: +7.5 (rotary table)

telescope run: 20153

  76   Mon Oct 4 12:50:13 2010 Erik HuemerPtrunrun039 --> run out of air --> repeat2560004.10.2010 12:45:1704.10.2010 14:00:00

Pt modules, angle scan

h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
HV=200V beam on
angle: 45 deg

run out of dry air  --> h01 run into compliance --> HV turned off during run automatically  --> has to be repeated

telescope run 20145

  71   Mon Oct 4 00:08:55 2010 Manfred ValentanPtrunrun03418700004.10.2010 00:03:1804.10.2010 09:22:07

Pt modules, angle scan

h01-Pt and h02-Pt
currents: h01=21.9A h02=7.5A
HV=200V beam on
angle: 37

telescope run 20139

  70   Sun Oct 3 22:53:49 2010 Manfred ValentanPtrunrun0332560003.10.2010 22.47:3804.10.2010 00:02:37

Pt modules, angle scan

h01-Pt and h02-Pt
currents: h01=22.9A h02=6.9A
HV=200V beam on
angle: 33

telescope run 20138

  82   Mon Oct 4 21:01:25 2010 Christian IrmlerBELLErunrun433000004.10.2010 20:59:4804.10.2010 23:04:24

angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C

angle: 60°
axis 1: 92.4 (horizontal)
axis 2: 35 (vertical)
axis 3: -52.5 (rotary table)

telescope run: 20149

  83   Mon Oct 4 23:12:16 2010 Manfred ValentanBELLErunrun443000004.10.2010 23:?:?04.10.2010 23.57.23

angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C

angle: 30°
axis 1: 92.4 (horizontal)
axis 2: 35 (vertical)
axis 3: -22.5 (rotary table)

telescope run: 20150

ELOG V3.1.5-fc6679b