Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 4 of 8  Not logged in ELOG logo
ID Date Author Project Subjectdown Run Number Events StartTime EndTime
  106   Sat Oct 9 15:29:09 2010 Markus FriedlBELLErunrun0583000009.10.2010 15:26:5009.10.2010 16:21:37

Origami1 (n-side only) + Micron1 (non-irrad)
angle scan: 73 - now with multi6 (previous run was single)
HV=100V / 35uA (beginning of run) 34uA (end of run)
cooling: chiller set to 15C

telescope run 20201

Origami p-side does not receive triggers -> disabled

origami flex straight part needed to be folded due to severe rotation angle -> nanonics connector problem...

 

  107   Sat Oct 9 18:56:35 2010 Thomas Bergauercommonpath to telescope data    

eudetmac001.cern.ch

path is /Volumes/Data/eudet/Data/cern_2010_sept_silc_apvdaq (Vienna system)

and /Volumes/Data/eudet/Data/cern_2010_sept_silc_alibava (Santander system)

  120   Wed May 4 15:14:31 2011 Thomas BergauerPtinfo about module    

pt-Modul hat jeweils zwei OB1 Sensoren von STM (mit 122um Pitch)

im Abstand von 2mm uebereinander

  111   Tue Oct 19 14:58:56 2010 Manfred ValentanMicron Babygeometry    
  12   Fri Sep 24 12:09:32 2010 Manfred ValentanBELLEgds-file of Micron wafer    
  108   Sat Oct 9 19:44:36 2010 Markus Friedlcommonend of success  09.10.2010 19:44:23NaN
  109   Sun Oct 10 15:45:04 2010 Thomas Bergauercommonend of success  09.10.2010 19:44:23NaN

 ;-) 

genau das gleiche wollte ich auch gerade schreiben!

  110   Mon Oct 11 11:18:17 2010 Christian Irmlercommonend of success  09.10.2010 19:44:23NaN

der Beiweis  :-)

  17   Tue Sep 28 01:13:57 2010 Markus FriedlBELLEcalcal0018380028.09.2010 01:11:20 

first intcal with complete Belle stack: 2 x Origami, 2 x Micron

HV=100V  I=49uA

beam is on

chiller is set to 15°C (module temperature is ~17°C)

both Origamis and both Microns are serially cooled

  25   Tue Sep 28 22:07:16 2010 Markus FriedlBELLEcalcal002 DO NOT USE -> go to cal0038380028.09.2010 22:01:55 

Belle stack (Origami, Micron, Micron, Origami)

now cooling only for Origami, Micron are uncooled

chiller set point: -25°C, measured values on Origami: -10°C

HV=100V, Ibias=38µA, beam off

modified I2C settings for cold modules

temperature monitoring: Origami2 pipes in<->out swapped (to achieve shorter tubes)

 

PROBLEM: Origami n channels are swapped -> USE cal003 INSTEAD!!!

  30   Wed Sep 29 09:39:33 2010 Markus FriedlBELLEcalcal0038380029.09.2010 09:38:00 

same as cal002, but now with corrected readout order

  34   Wed Sep 29 14:03:55 2010 Markus FriedlBELLEcalcal0048380029.09.2010 14:02:2529.09.2010 14:45:05

Belle stack: Origami-Micron-Micron-Origami
HV=100V, Ibias=100µA, beam off
no cooling

Temp. at modules: 
Origami 1: 50°C
Micron 1: 46°C
Micron 2: 48°C
Origami 2: 48°C

standard I2C settings
centered

  37   Wed Sep 29 17:38:19 2010 Markus FriedlMicron Babycalcal0058380029.09.2010 17:36:38 

micron baby stack
HV=100V I=6.5uA
Beam off

  44   Thu Sep 30 15:06:28 2010 Markus FriedlMicron Babycalcal0068380030.09.2010 15:01:56 

micron baby: 4 DUTs - angle scan
HV=100V I=6.8uA
Beam off (turned on at ~8k events)
 

  59   Sat Oct 2 17:27:14 2010 Thomas BergauerITEcalcal0078380002.10.2010 17:11:18  

ITE: 2 DUTs
2 x SILC + 2 x ITE
HV=100V

Beam on 

one short only per sensor

  62   Sun Oct 3 08:14:39 2010 Markus FriedlITEcalcal0088380003.10.2010 08:13:06 

6 x SILC + 2 x ITE
HV=100V
telescope position: 119

no beam (technical problem)

  64   Sun Oct 3 14:35:12 2010 Marko DragicevicCNMcalcal0098380003.10.2010 13:50:54 

CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
DUT outside of beam

calibration started after 1 hour warmup

  66   Sun Oct 3 18:23:27 2010 Christian IrmlerPtcalcal0108380003.10.2010 18:26:49  

pt modules angle scan
h01-Pt and h02-Pt
currents: h01=23.1µA h02=10.4µA
HV=200V
beam on

modules flushed with dry air

 

  81   Mon Oct 4 20:16:19 2010 Christian IrmlerBELLEcalcal0118380004.10.2010 20:15:00 

angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C

HV connection of Origami 1 repaired

  87   Tue Oct 5 17:50:23 2010 Christian IrmlerITEcalcal0128380005.10.2010 17:50:2605.10.2010 18:09:48

6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48

DUTs and SILC4/5 swapped
new module order (downstream): SILC0 - SILC3 - SILC1 - W7 - W9 - SILC2 - SILC4 -SILC5
SILC1 and SILC2 are horizontal

beam on

modules flushed with dry air (black tube)
rel. humidity: ~0% @ 26°C

ELOG V3.1.5-fc6679b