Thu Sep 30 18:12:53 2010, Markus Friedl, Micron Baby, run, run017, 35000, 30.09.2010 18:11:53, 30.09.2010 20:22:43
|
micron baby: 4 DUTs
HV=100V I=13.5uA, I_stop=17uA
Beam on
15° rotation
telescope run 20111 |
Thu Sep 30 20:47:01 2010, Markus Friedl, Micron Baby, run, run018, 26938, 30.09.2010 20:45:48, 30.09.2010 22:25:25
|
micron baby: 4 DUTs
HV=100V I=13.7uA, I_stop=15.6uA
Beam on
30° rotation
telescope run 20112 |
Fri Oct 1 23:18:34 2010, Markus Friedl, CNM, run, run022, 8139, 01.10.2010 23:17:02 , 01.10.2010 23:45:51
|
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
not optimized alignment
telescope run 20118 |
Sat Oct 2 17:24:12 2010, Markus Friedl, ITE, run, run026, 5834, 02.10.2010 17:23:46 , 02.10.2010 17:31:51
|
2 x SILC + 2 x ITE
HV=100V
trying to find beam
telescope run 20124 |
Sat Oct 2 17:35:51 2010, Markus Friedl, ITE, run, run027, 2999, 02.10.2010 17:34:51 , 02.10.2010 17:38:39
|
2 x SILC + 2 x ITE
HV=100V
telescope position: 107
telescope run 20125
beam not found yet |
Sat Oct 2 18:36:57 2010, Markus Friedl, ITE, run, run028, 162263, 02.10.2010 18:34:06, 03.10.2010 08:11:13
|
6 x SILC + 2 x ITE
HV=100V
telescope position: 119
short break ~2.10.2010 20:00 (beam off for a couple of minutes for access by marcos)
telescope run 20126 |
Sun Oct 3 08:14:39 2010, Markus Friedl, ITE, cal, cal008, 83800, 03.10.2010 08:13:06,
|
6 x SILC + 2 x ITE
HV=100V
telescope position: 119
no beam (technical problem) |
Sun Oct 3 08:19:13 2010, Markus Friedl, ITE, run, run029, 75000, 03.10.2010 08:33:28, 03.10.2010 10:50:27
|
same as previous run
telescope run 20127
Configuration file for DAQ: cern10_ite_silc_single.cfg --> peak mode with 1 sample! |
Wed Oct 6 11:59:29 2010, Markus Friedl, Micron Baby, run, run050, 90000, 06.10.2010 11:57:55, 06.10.2010 15:30:37
|
8 x Micron Baby (3 irradiated), no cooling
HV=100V I=141uA (start of run)
beam on
telescope position 118 / 41.1 / 7.5
no telescope run |
Wed Oct 6 16:33:55 2010, Markus Friedl, Micron Baby, run, run051, 90000, 06.10.2010 16:32:03, 06.10.2010 20:59:58
|
8 x Micron Baby (3 irradiated), no cooling
HV=100V I=209uA (start of run, still rising); 203uA (end of run)
beam on, NIM trigger from TLU (no handshake)
telescope position 131 / 53.5 / 7.5
no telescope run - being tuned (some intervals during data taking are possible)
|
Wed Oct 6 23:48:49 2010, Markus Friedl, BELLE, run, run052, 165789, 06.10.2010 23:47:12, 07.10.2010 08:43:42
|
Belle stack without Origami2
HV=80V I=217uA
telescope setting 103 / 30 / 277.5
telescope run 20184
temperature of chiller set to 15°C
beam stopped at 7.10. 08:00 sharp, no beam until 8.10 - 8:00 according to SPS Page 1. We keep DAQ and telescope running and cross our fingers for at least some spills of particles.
Irradiated micron module 2, n-side: excessive hit count on channels at the edges of the APV chips - no such thing on the p-side |
Fri Oct 8 17:26:36 2010, Markus Friedl, BELLE, cal, cal015, 83800, 08.10.2010 17:22:44,
|
Belle stack without Origami2
HV=11V I=32uA
beam on
2 suspicious APVs on n side of Micron due to burnt strip
trying to identify problematic Micron n side channels with low bias voltage (APV22 baseline saturates at higher bias) |
Fri Oct 8 18:12:43 2010, Markus Friedl, BELLE, run, run054, 90000, 08.10.2010 18:08:48, 08.10.2010 21:49:36
|
Belle stack w/o Origami2 after irradiation
HV=80V I=224uA (beginning of run)
2 suspicious APVs on Micron n side
xy-table position 7 / 30 / 277.5 (shoots at the smaller edge of the trapezoidal sensor)
telescope run 20195 |
Fri Oct 8 23:05:03 2010, Markus Friedl, BELLE, cal, cal016, 83800, 08.10.2010 23:03:16,
|
Belle stack w/o Origami2 after irradiation
HV=80V / 258 µA
cooling: Origami only, chiller set to -25°C,
2 suspicious APVs on n side of Micron due to burnt strip
Bias connection of Origami repaired --> lower noise on p-side |
Sat Oct 9 00:17:02 2010, Markus Friedl, BELLE, run, run056, 225k, 09.10.2010 00:15:53, 09.10.2010 09:54:28
|
Belle stack w/o Origami2 after irradiation
HV=80V / I_start=255 µA, I_stop=243 µA
cooling: Origami only, chiller set to -25°C,
2 suspicious APVs on n side of Micron (possibly due to burnt strip)
same position as in previous run
telescope run 20198 - now with correct telescope threshold settings
a lot of "Error detected in APV 21, subevent 2. Event discarded, reset sent." errors started at 09.10.2010 09:00:25 (after whole night without any error) |
Sat Oct 9 15:29:09 2010, Markus Friedl, BELLE, run, run058, 30000, 09.10.2010 15:26:50, 09.10.2010 16:21:37
|
Origami1 (n-side only) + Micron1 (non-irrad)
angle scan: 73 - now with multi6 (previous run was single)
HV=100V / 35uA (beginning of run) 34uA (end of run)
cooling: chiller set to 15C
telescope run 20201
Origami p-side does not receive triggers -> disabled
origami flex straight part needed to be folded due to severe rotation angle -> nanonics connector problem...
|
|
Sat Oct 9 19:44:36 2010, Markus Friedl, common, end of success, , , 09.10.2010 19:44:23, NaN
|
|
Wed Sep 15 10:25:13 2010, Marko Dragicevic, common, Equipment List, , , ,
|
Slow Control:
3x Source Measurement Unit Keithley K2410
-- Inv.Nr.: 540-702, 1000EUR
-- Inv.Nr.: 540-730, 1000EUR
-- Inv.Nr.: 540-709, 1000EUR
-- Koax-Kabel + Adapter auf Banane
Scanning Voltmeter Keithley K2700 , Inv.Nr.: 540-698, 1000EUR
-- Shunt-Widerstand-Platine
-- Flachbandkabel fuer Verbindung Shunt-Platine<->K2700
TRHX
-- 3 Sensoren
-- 2 lange Flachbandkabel, 1 serielles Kabel
LV-Power-Supplies, je 150EUR
-- GW Instek GPC-1850, SN.: 4080392
-- GW Instek GPC-1850D, Inv.Nr.: 545-059
-- GW Instek GPC-1850D, Inv.Nr.: 545-062
-- Systron Donner HR 20-10A, SN.: 781-092
-- Systron Donner HR 20-10A, SN.: 781-096
-- GW Instek GPS-3030D SN.: E871711
-- HAMEG MHP4030 SN.: 057910044 500EUR
Oszilloskop Tektronix TDS 3054, SN.: B011109, 2500EUR
-- 3 probes
Die Katze (Belle-HV-Supply)
-- 2x HV-Kabel 30m (rot/schwarz)
GBIP
USB Adapter NI GPIB-USB-HS, S/N 14693EB, 100EUR
-Kabel, 3x lang, 1x kurz
USB Temperaturlogger PicoTech TC-08, S/N.: VSR 08/519 100EUR
BELLE DAQ (CERN):
Chrisu-PC, Inv.Nr.: 401-925
-- Monitore
---- Belinea, Inv.Nr.: 401-696
---- Gericom, SN.: M1132GR5467345
-- Keyboard & Maus
Wiener 9U-VME-Crate, Inv.Nr.: 545-043, 2000EUR
-- Power Supply
-- VME-Controller
-- 4 VME-Module (1x Buffer, 1, Neco, 2x FADC)
DOCK-Box
-- Power Kabel
VME-Kabel (bockig) + Verlaengerung
30m-Kabel (8xCat7, 2xCat5, 2xgrau)
Lemo-Kabel
100pin-Flachkabel Neco-Buffer
Bananenkabel
Hybridkabel
Special TLU-Adapter (flipping pin order of RJ45)
Schrauben für Crate-Montage
Erdungskabel (liegen am CERN im Labor)
Magic Box
APVDAQ (Mol):
PC Inv.Nr: 401-943
-- Ilyama E2407, S/N 1105702000889
-- Keyboard & Maus
VME Crate Inv.Nr: 545-030
-- Create Controller Inv.Nr: 540-732
-- 3x APVDAQ
Repeater Board
-- 3x auf Platte montiert
Kabel
-- VME-Kabel (bockig)
-- 4x Netzwerk (gelb 1:1 verschalten)
-- 4x Netzwerk (grau 1:1 verschalten)
-- 1x Flachband
-- diverse Bananen
DUT:
Schraubenbox bau
-- diverse Schrauben
-- Gewindestangen
-- Fluegelmittern
-- 2x Sockel
4mm Steckschlauch fuer Trockenluft
Anschluss 1/8" auf 4mm Steckschlauch
Druckminderer
-- 6mm Snap-In
-- 6mm Schlauch
Chiller Huber ministat 230, Inv.Nr.: 482-021, 3000EUR
-- Manual
-- Netzteil
-- langes serielles Kabel
-- 5-6mm Schlauch
-- Adapter
-- 5 Liter dest. Wasser (falls noch Platz ist)
-- Frostschutz
-- LabView (falls ferngesteuert)
Box-Deckel
Baseplates (4?)
Schwarze Selbstklebefolie
Alufolie
GROSSES SCHWARZES LICHTDICHTES TUCH !!!!
Module
-- 2 x Micron Trapezoid
-- 2 x 6" Origami
-- 9 x Micron Baby
-- 2 x CNM 2D Sensoren
-- 8x SiLC (No. 0-7)
-- 2x Pt
EDV:
Netzwerk-Switch:
-- D-Link 8-Port GBit-Switch DGS1008D S/N F37v89B010104, 40 EUR
WLAN-Router: Linksys WRT54GL-DE, SN.: CL7B1H502248, 60 EUR
1TB externe Festplatte: Western Digital MyBook, SN.: WCAJ1469094, 40 EUR
-- Netzgeraet
-- USB-Kabel
-- Firewire 400/800 Kabel
Webcam
USB-Stick
Etikettiergeraet: Brother P-touch 1000
Laptops
-- Apple MacBook (MV) Inv.Nr.: 401-810
(-- Apple MacBook Pro (MD) Inv Nr.: 401-831)
2x USB-Seriell Adapter
Netzwerkkabel
1 Trommel Ethernet-Kabel (100m, vom Walzel)
einige RJ-45 Stecker
2.5" externe HD
CD/DVD Rohlinge
Tools:
Diverse Adaptoren Lemo-BNC, Lemo-Lemo
Taschenlampe + 2x Hirnbirn
Massband
Multimeter
Werkzeug (Schraubenzieher & Co)
Pinzetten
Laserpointer
Schwarze Fetzen
Gaffa
Doppelscotch
Kabelbinder
Druckluft zur Reinigung
Adapter f. Steckdosen
Verteiler-Leisten
Kabeltrommel
Schaltbare Steckerleisten
Tixo klein & gross
Loetstation Advanced JBC, SN.: 76841165, inkl. Zubehoer
Ethernet-Crimp-Zange
Eisensagl
Schublehre
Wasserwaage
Misc:
Fondueset
Spiegelreflex Digitalkamera
-- Stativ
-- Reflexionszelt
Scheinwerfer
-- 3 x 500 W
-- 2 x Stativ
Akkus+Ladegerät
Dickes Logbook
Kugelschreiber/Bleistifte
Pflaster
Carnet ATA |
Sun Oct 3 14:35:12 2010, Marko Dragicevic, CNM, cal, cal009, 83800, 03.10.2010 13:50:54,
|
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
DUT outside of beam
calibration started after 1 hour warmup |
Mon Oct 4 10:43:45 2010, Marko Dragicevic, Pt, run, run036, 25600, 04.10.2010 10:33:05, 04.10.2010 11:35:51
|
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=24.9A h02=12.5A
HV=200V beam on
angle: 39 deg
telescope run 20142 |
|