ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
21
|
Tue Sep 28 14:38:24 2010 |
Christian Irmler | BELLE | Temperature sensors Belle stack | | | | |
PicoLogic TC-08 temperature sensor assignment Belle stack:
Sensor type: K
channel 1: Origami_mod1_in
channel 2: Origami_mod1_out
channel 3: Origami_mod2_in
channel 4: Origami_mod2_out
channel 5: Micron_wedge_mod1_p
channel 6: Micron_wedge_mod1_n
channel 7: Micron_wedge_mod2_p
channel 8: Micron_wedge_mod2_n
The cooling pipes of the two Origami modules and that of the Micron modules are connected in series, respectively. |
42
|
Thu Sep 30 10:56:34 2010 |
Christian Irmler | common | Room numbers | | | | |
Room and telefone numbers.
Name |
Building |
Room |
Tel. |
Bergi |
38 |
418 |
70 418 or 162471 (mobile) |
Markus |
41 |
021 |
60 021 |
Manfred |
38 |
404 |
70 404 |
Erik |
38 |
463 |
70 463 |
Immanuel |
38 |
313 |
70 313 |
Chrisu |
39 |
324 |
79 324
|
Marko |
39 |
007 |
79 007 |
Paqui |
38 |
107 |
70 107 |
|
66
|
Sun Oct 3 18:23:27 2010 |
Christian Irmler | Pt | cal | cal010 | 83800 | 03.10.2010 18:26:49 | |
pt modules angle scan
h01-Pt and h02-Pt
currents: h01=23.1µA h02=10.4µA
HV=200V
beam on
modules flushed with dry air
|
Attachment 1: slowcontrol_pt_cal010.gif
|
|
67
|
Sun Oct 3 18:52:56 2010 |
Christian Irmler | Pt | run | run030 | 25600 | 03.10.2010 19:16:29 | |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=23.1A h02=10.4A
HV=200V beam on
angle: 27
telescope run 20134 |
74
|
Mon Oct 4 11:43:05 2010 |
Christian Irmler | Pt | run | run037 | 25600 | 04.10.2010 11:40:15 | 04.10.2010 12:15:03 |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=25.4A h02=13.1A
HV=200V beam on
angle: 41 deg
telescope run 20143 |
78
|
Mon Oct 4 15:39:34 2010 |
Christian Irmler | Pt | run | run041 | 25600 | 04.10.2010 15:46:22 | |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
HV=200V beam on
angle: 45 deg
position axis = 232.5
repetition of run039
telescope run20147 |
79
|
Mon Oct 4 16:15:48 2010 |
Christian Irmler | Pt | run | run042 | 25600 | 04.10.2010 16:12:52 | 04.10.2010 16:35:18 |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=28.1A h02=2.4A
HV=200V beam on
angle: 47 deg
repetition of run040, but now biased :-)
telescope run 20148 |
80
|
Mon Oct 4 16:29:36 2010 |
Christian Irmler | common | beam settings | | | | |
beam settings optimized by beamline operator
wire champer display fixed |
Attachment 1: beamprofile_run042.gif
|
|
Attachment 2: beamsettings_run042.jpg
|
|
81
|
Mon Oct 4 20:16:19 2010 |
Christian Irmler | BELLE | cal | cal011 | 83800 | 04.10.2010 20:15:00 | |
angle scan Origami 1 and Micron wedge 1
HV = 100V
chiller set to 14°C
HV connection of Origami 1 repaired |
82
|
Mon Oct 4 21:01:25 2010 |
Christian Irmler | BELLE | run | run43 | 30000 | 04.10.2010 20:59:48 | 04.10.2010 23:04:24 |
angle scan Origami 1 and Micron wedge 1
HV = 100V
chiller set to 14°C
angle: 60°
axis 1: 92.4 (horizontal)
axis 2: 35 (vertical)
axis 3: -52.5 (rotary table)
telescope run: 20149 |
87
|
Tue Oct 5 17:50:23 2010 |
Christian Irmler | ITE | cal | cal012 | 83800 | 05.10.2010 17:50:26 | 05.10.2010 18:09:48 |
6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48
DUTs and SILC4/5 swapped
new module order (downstream): SILC0 - SILC3 - SILC1 - W7 - W9 - SILC2 - SILC4 -SILC5
SILC1 and SILC2 are horizontal
beam on
modules flushed with dry air (black tube)
rel. humidity: ~0% @ 26°C |
88
|
Tue Oct 5 18:13:05 2010 |
Christian Irmler | ITE | run | run048 | 533125 | 05.10.2010 18:14:57 | 06.10.2010 09:27:44 |
6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48
telescope run: 20154-20155
DUTs and SILC4/5 swapped
new module order (downstream): SILC0 - SILC3 - SILC1 - W7 - W9 - SILC2 - SILC4 -SILC5
SILC1 and SILC2 are horizontal
beam on
modules flushed with dry air (black tube)
rel. humidity: ~0% @ 26°C |
Attachment 1: LongtermITERun2.png
|
|
98
|
Fri Oct 8 18:12:15 2010 |
Christian Irmler | BELLE | run | run053 | 98000 | 08.10.2010 00:33:14 | 08.10.2010 13:36:57 |
Belle stack w/o Origami2 after irradiation
HV=80V
Telescope position 55/30/277.5
NIM trigger
temperature of chiller set to 15°C
Analog signal of APVs #22 and #23 has been bound to ground after 1200 events. |
102
|
Fri Oct 8 23:43:07 2010 |
Christian Irmler | BELLE | run | run055 | 12316 | 08.10.2010 23:42:51 | 09.10.2010 00:14:56 |
Belle stack w/o Origami2 after irradiation
HV=80V / 255 µA
cooling: Origami only, chiller set to -25°C,
2 suspicious APVs on n side of Micron due to burnt strip
same position as in previous run
telescope run 20197 - wrong config file @ telescope -> new run with correct settings |
104
|
Sat Oct 9 12:00:55 2010 |
Christian Irmler | BELLE | cal | cal017 | 83800 | 09.10.2010 11:59:37 | |
Origami1 (n-side only) + Micron1 (non-irrad)
angle scan: 73°
HV=100V / 40 µA
cooling: chiller set to 15°C
Origami p-side does not receive triggers -> disabled
origami flex straight part needed to be folded due to severe rotation angle -> nanonics connector problem... |
110
|
Mon Oct 11 11:18:17 2010 |
Christian Irmler | common | end of success | | | 09.10.2010 19:44:23 | NaN |
der Beiweis :-) |
Attachment 1: IMG_9033.JPG
|
|
33
|
Wed Sep 29 11:53:16 2010 |
Erik Huemer | BELLE | run | run011 | 19003 | 29.09.2010 12:19:57 | 29.09.2010 14:00:57 |
Belle stack: Origami-Micron-Micron-Origami
HV=100V, Ibias=83.22µA, beam on
no cooling
Temp. at modules:
Origami 1: 50°C
Micron 1: 46°C
Micron 2: 48°C
Origami 2: 48°C
standard I2C settings
centered
telescope run 20085 (continued) |
50
|
Fri Oct 1 09:42:02 2010 |
Erik Huemer | Micron Baby | run | run020 | 1843 | 01.10.2010 09:59:09 | 01.10.2010 10.05 |
micron baby: 4 DUTs
HV=100V I=10.9uA
Beam on
60° rotation
Teleskop nicht neu gestartet, machma nochamal |
56
|
Sat Oct 2 15:24:00 2010 |
Erik Huemer | ITE | XY Position and Slow Control | | | | |
center position: 119/48/187,5
|
Attachment 1: ITE128_SlowControl_FirstRun.png
|
|
65
|
Sun Oct 3 16:23:20 2010 |
Erik Huemer | Pt | XY/R Position | | | | |
centerposition: 119/43/187,5
27 grad: 214,5 |