ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
Text |
|
21
|
Tue Sep 28 14:38:24 2010 |
Christian Irmler | BELLE | Temperature sensors Belle stack | | | | | PicoLogic TC-08 temperature sensor assignment
Belle stack:
Sensor type: K |
|
42
|
Thu Sep 30 10:56:34 2010 |
Christian Irmler | common | Room numbers | | | | | Room and telefone numbers.
|
|
66
|
Sun Oct 3 18:23:27 2010 |
Christian Irmler | Pt | cal | cal010 | 83800 | 03.10.2010 18:26:49 | | pt modules angle scan
h01-Pt and h02-Pt
currents: h01=23.1µA h02=10.4µA |
|
67
|
Sun Oct 3 18:52:56 2010 |
Christian Irmler | Pt | run | run030 | 25600 | 03.10.2010 19:16:29 | | Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=23.1A h02=10.4A |
|
74
|
Mon Oct 4 11:43:05 2010 |
Christian Irmler | Pt | run | run037 | 25600 | 04.10.2010 11:40:15 | 04.10.2010 12:15:03 | Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=25.4A h02=13.1A |
|
78
|
Mon Oct 4 15:39:34 2010 |
Christian Irmler | Pt | run | run041 | 25600 | 04.10.2010 15:46:22 | | Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A |
|
79
|
Mon Oct 4 16:15:48 2010 |
Christian Irmler | Pt | run | run042 | 25600 | 04.10.2010 16:12:52 | 04.10.2010 16:35:18 | Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=28.1A h02=2.4A |
|
80
|
Mon Oct 4 16:29:36 2010 |
Christian Irmler | common | beam settings | | | | | beam settings optimized by beamline operator
wire champer display fixed |
|
81
|
Mon Oct 4 20:16:19 2010 |
Christian Irmler | BELLE | cal | cal011 | 83800 | 04.10.2010 20:15:00 | | angle scan Origami 1 and Micron wedge
1
HV = 100V |
|
82
|
Mon Oct 4 21:01:25 2010 |
Christian Irmler | BELLE | run | run43 | 30000 | 04.10.2010 20:59:48 | 04.10.2010 23:04:24 | angle scan Origami 1 and Micron wedge
1
HV = 100V |
|
87
|
Tue Oct 5 17:50:23 2010 |
Christian Irmler | ITE | cal | cal012 | 83800 | 05.10.2010 17:50:26 | 05.10.2010 18:09:48 | 6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48 |
|
88
|
Tue Oct 5 18:13:05 2010 |
Christian Irmler | ITE | run | run048 | 533125 | 05.10.2010 18:14:57 | 06.10.2010 09:27:44 | 6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48 |
|
98
|
Fri Oct 8 18:12:15 2010 |
Christian Irmler | BELLE | run | run053 | 98000 | 08.10.2010 00:33:14 | 08.10.2010 13:36:57 | Belle stack w/o Origami2 after irradiation
HV=80V
Telescope position 55/30/277.5 |
|
102
|
Fri Oct 8 23:43:07 2010 |
Christian Irmler | BELLE | run | run055 | 12316 | 08.10.2010 23:42:51 | 09.10.2010 00:14:56 | Belle stack w/o Origami2 after irradiation
HV=80V / 255 µA
cooling: Origami only, chiller set |
|
104
|
Sat Oct 9 12:00:55 2010 |
Christian Irmler | BELLE | cal | cal017 | 83800 | 09.10.2010 11:59:37 | | Origami1 (n-side only) + Micron1 (non-irrad)
angle scan: 73°
HV=100V / 40 µA |
|
110
|
Mon Oct 11 11:18:17 2010 |
Christian Irmler | common | end of success | | | 09.10.2010 19:44:23 | NaN | der Beiweis :-) |
|
33
|
Wed Sep 29 11:53:16 2010 |
Erik Huemer | BELLE | run | run011 | 19003 | 29.09.2010 12:19:57 | 29.09.2010 14:00:57 | Belle stack: Origami-Micron-Micron-Origami
HV=100V, Ibias=83.22µA, beam |
|
50
|
Fri Oct 1 09:42:02 2010 |
Erik Huemer | Micron Baby | run | run020 | 1843 | 01.10.2010 09:59:09 | 01.10.2010 10.05 | micron baby: 4 DUTs
HV=100V I=10.9uA
Beam on |
|
56
|
Sat Oct 2 15:24:00 2010 |
Erik Huemer | ITE | XY Position and Slow Control | | | | | center position: 119/48/187,5
|
|
65
|
Sun Oct 3 16:23:20 2010 |
Erik Huemer | Pt | XY/R Position | | | | | centerposition: 119/43/187,5
27 grad: 214,5 |
|