Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 6 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Project Subject Run Number Events StartTimedown EndTime Text Attachments
  80   Sun Aug 23 13:15:42 2009 Marko DragicevicPt_ITE512Current and Humindity during first Run    Current of Pt modules during first run
Data
of the run was dicarded.
Compressed air flow was at ~2 bars
 IandRH_first_Pt_run.pngPicture_1.png 
  84   Sun Aug 23 23:38:27 2009 Georg Auzinger Phone numbers     Georg #70
Wolfgang - Building: 41, Room: 204,
Tel: ?
  
  94   Tue Aug 25 09:00:51 2009 Thomas Bergauer beam conditions    manually changed TRIM3, TRIM4 and TRIM6  magnet_settings_withH6B.802.jpg20090825_0859_beam_conditions.jpg 
  106   Wed Aug 26 14:26:13 2009 Wolfgang KiesenhoferITE128S/N final Single-Metalrun001 & run002   Most probable S/N, Single Metal Layer,
2D histogram fitted with langau in 5 bin
(strips) slices.
 sn-pos_h13-h14_strips_pa_5bins.pdf 
  107   Wed Sep 2 14:15:17 2009 Wolfgang KiesenhoferITE128ITE 128 Cross-Talkrun002   Preliminary strip correlation (Kendalls
Tau) for threshold = 3*stripnoise.
 stripcorr_modall_thrs3_ktau.pdf 
  114   Fri Dec 4 12:21:56 2009 Wolfgang Kiesenhofer ITE128 strip correlation kendall tau (preliminary result)    Kendall tau (rank correlation) for module
1 (single layer 1 / h13), module 2 (single
layer 2 / h14),  module 6 (standard
 stripcorr_mod1_thrs5_ktau_ev100000_run002_strip.pdfstripcorr_mod2_thrs5_ktau_ev100000_run002_strip.pdfstripcorr_mod6_thrs5_ktau_ev100000_run002_strip.pdf 
ELOG V3.1.5-fc6679b