| 
| ID | Date | Author | Project | Subject | Run Number | Events  | StartTime | EndTime | Text |  |  | 83 | Sun Aug 23 17:19:50 2009 | Christian Irmler | Pt_ITE512 | internal calibration | cal011 |  | 23.08.2009  16:30:43 | 23.08.2009  17:02:14 | Pt: 1 Grad, HV=200V, 0% RH, intcal, beam off
 ITE512: HV=70V,
 |  |  | 84 | Sun Aug 23 23:38:27 2009 | Georg Auzinger |  | Phone numbers |  |  |  |  | Georg #70 Wolfgang - Building: 41, Room: 204,
 Tel: ?
 |  |  | 94 | Tue Aug 25 09:00:51 2009 | Thomas Bergauer |  | beam conditions |  |  |  |  | manually changed TRIM3, TRIM4 and TRIM6 |    |  | 106 | Wed Aug 26 14:26:13 2009 | Wolfgang Kiesenhofer | ITE128 | S/N final Single-Metal | run001 & run002 |  |  |  | Most probable S/N, Single Metal Layer, 2D histogram fitted with langau in 5 bin
 (strips) slices.
 |   |  | 107 | Wed Sep  2 14:15:17 2009 | Wolfgang Kiesenhofer | ITE128 | ITE 128 Cross-Talk | run002 |  |  |  | Preliminary strip correlation (Kendalls Tau) for threshold = 3*stripnoise.
 |   |  | 114 | Fri Dec  4 12:21:56 2009 | Wolfgang Kiesenhofer |  | ITE128 strip correlation kendall tau (preliminary result) |  |  |  |  | Kendall tau (rank correlation) for module 1 (single layer 1 / h13), module 2 (single
 layer 2 / h14),  module 6 (standard
 |     |  |