| 
| ID | Date | Author | Project | Subject | Run Number | Events  | StartTime | EndTime | Text |  |  | 42 | Fri Aug 21 06:24:10 2009 | Christian Irmler | BELLE | APVDAQ + telescope (beam alignement) | run6872 | 5785 | 21.08.2009  00:12:26 | 21.08.2009  00:27:11 | 4 Belle DUTs HV=80V, 40 MHz, 6 sample, 120 GeV
 
 |  |  | 40 | Thu Aug 20 20:06:06 2009 | Manfred Valentan | alignment_laser | low intensity (like laser001), but far sensor in 2nd position | laser007 | 50k | 20.08.2009  19:57:52 | 20.08.2009  20:05:34 | HV=70V, 40MHz, 6 samples, beam off, far sensor in 2nd position
 5ns trigger pulse width, 1 kHz trigger,
 |  |  | 38 | Thu Aug 20 19:46:02 2009 | Manfred Valentan | alignment_laser | laser at high intensity, far sensor in 2nd position | laser005 | 50000 | 20.08.2009  19:45:16 | 20.08.2009  19:53:01 | far sensor in 2nd position; laser at high intensity (saturation on near sensor, good
 signal on far sensor)
 |  |  | 78 | Sun Aug 23 02:18:20 2009 | Thomas Bergauer | ITE128 | 2nd run with ITE128: top position (3mm below center); during night | run022 | 407895 | 23.08.2009  02:16:21 | 23.08.2009  08:04:09 | ITE128 HV = 70V, 40MHz, 120 GeV
 TLU trigger w telescope
 |   |  | 85 | Mon Aug 24 11:58:23 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 1deg air | run025 | 20k | 24.08.09 11:24:33 | 24.08.09 12:40:25 | Pt: 1 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V,
 X-Y-Table:
 x=99.6, y=36
 |  |  | 86 | Mon Aug 24 13:01:14 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 3deg air | run026 | 20k | 24.08.09 11:24:33 | 24.08.2009  14:11:45 | Pt: 3 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V,
 X-Y-Table:
 x=99.6, y=36
 |  |  | 87 | Mon Aug 24 14:23:01 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 5deg air | run027 | 20k | 24.08.2009  14:27:07 | 24.08.2009  15:26:20 | Pt: 5 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V,
 X-Y-Table:
 x=99.6, y=36
 |  |  | 88 | Mon Aug 24 15:28:49 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 7deg air | run028 | 20k | 24.08.09 15:39:50 | 24.08.09 16:40:54 | Pt: 7 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V,
 X-Y-Table:
 x=99.6, y=36
 |  |  | 89 | Mon Aug 24 16:44:36 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 9deg air | run029 | 20k | 24.08.09 17:03:21 | 24.08.09 18:20:55 | Pt: 9 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V,
 X-Y-Table:
 x=99.6, y=36
 |  |  | 90 | Mon Aug 24 18:30:07 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 11deg air | run030 | 20k | 24.08.09 18:45:09 | 24.08.09  20:37:04 | Pt: 11 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V,
 X-Y-Table:
 x=99.6, y=36
 |  |  | 91 | Mon Aug 24 22:04:56 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 13deg air | run031 | 20k | 24.08.09 20:53:50 | 24.08.09 22:00:49 | Pt: 13 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V,
 X-Y-Table:
 x=99.6, y=36
 |  |  | 95 | Tue Aug 25 09:01:12 2009 | Marko Dragicevic | Pt_ITE512 | Pt_ITE512 2deg air | run034 | 20k | 25.08.09 08:56:18 | 25.08.09 09:45: | Pt: 2 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V,
 X-Y-Table:
 x=99.6, y=36
 |  |  | 96 | Tue Aug 25 09:53:16 2009 | Marko Dragicevic | Pt_ITE512 | Pt_ITE512 4deg  NO air! | run035 | 20k | 25.08.2009  09:50 | 25.08.2009  11:00 | Pt: 4 Grad, HV=200V, 0% (start run) to 14% (end run) RH, beam on, 120GeV
 ITE512: HV=70V,
 X-Y-Table:
 |  |  | 97 | Tue Aug 25 11:26:23 2009 | Thomas Bergauer | Pt_ITE512 | Pt_ITE512 6deg NO air! | run036 | 20k | 25.08.2009 11:25 | 25.08.2009  12:19:55 | Pt: 6 Grad, HV=200V, 20% (start run) to % (end run) RH, beam on, 120GeV
 ITE512: HV=70V,
 X-Y-Table:
 |  |  | 98 | Tue Aug 25 12:30:04 2009 | Marko Dragicevic | Pt_ITE512 | Pt_ITE512 8deg  NO air! | run037 | 20k | 25.08.2009  12:45 | 25.08.2009  13:40:13 | Pt: 8 Grad, HV=200V, 28% (start run) to 31% (end run) RH, beam on, 120GeV
 ITE512: HV=70V, I=49.1muA
 X-Y-Table:
 |  |  | 99 | Tue Aug 25 13:48:30 2009 | Marko Dragicevic | Pt_ITE512 | Pt_ITE512 10deg  NO air! | run038 | 20k | 25.08.2009  13:54:54 | 25.08.2009  15:22:38 | Pt: 10 Grad, HV=200V, 31.7% (start run) to 33.8% (end run) RH, beam on, 120GeV
 ITE512: HV=70V, I=50muA
 X-Y-Table:
 |  |  | 100 | Tue Aug 25 15:33:07 2009 | Marko Dragicevic | Pt_ITE512 | Pt_ITE512 12deg NO air! | run039 | 20k | 25.08.2009 15:35 | 25.08.2009 17:10 | Pt: 12 Grad, HV=200V, 34.4% (start run) to 36.1% (end run) RH, beam on, 120GeV
 ITE512: HV=70V, I=50muA
 X-Y-Table:
 |  |  | 101 | Tue Aug 25 17:14:52 2009 | Marko Dragicevic | Pt_ITE512 | Pt_ITE512 17deg NO air! | run040 | 20k | 25.08.2009  17:17:11 | 25.08.2009  18:08:57 | Pt: 17 Grad, HV=200V, 36.5% (start run) to xx.1% (end run) RH, beam on, 120GeV
 ITE512: HV=70V, I=51muA
 X-Y-Table:
 |   |  | 81 | Sun Aug 23 14:03:14 2009 | Manfred Valentan | Pt_ITE512 | Pt & ITE512 center position, 1 deg | run024 | 20000 | 23.08.2009 13:59:06 |  | Pt: 1 Grad, HV=200V, 0% RH ITE512: HV=70V
 X-Y-Table: x=99.6, y=36
 |  |  | 92 | Mon Aug 24 22:12:22 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 15deg air | run032 | 19456 | 24.08.09 22:18:08 | 24.08.09 23:25:52 | Pt: 15 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V,
 X-Y-Table:
 x=99.6, y=36
 
 no
 |  |  |