ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
Text |
 |
2
|
Mon Jul 6 12:24:53 2009 |
Stephan Hänsel | SiLC | Module Drawings | | | | | Pt Modules:
3D-View
technical drawings:
|
|
5
|
Mon Jul 6 12:29:20 2009 |
Stephan Hänsel | SiLC | Sensors - layout | | | | | Pt Modules:
CMS OB1 Sensors:
|
|
6
|
Mon Jul 6 14:30:45 2009 |
Marko Dragicevic | | Equipment List | | | | | [B]Slow Control:[/B]
Source Measurement Unit Keithley K2410, Inv.Nr.:
540-702, 2000EUR
|
|
7
|
Mon Jul 6 16:22:36 2009 |
Stephan Hänsel | SiLC | Measurements - Sensors | | | | | Pt Modules:
OB1-Sensors:
30210331516116 |
|
8
|
Mon Jul 6 16:23:51 2009 |
Stephan Hänsel | SiLC | Module Components | | | | | Pt Modules:
Pt-1: |
|
9
|
Thu Jul 9 10:29:58 2009 |
Stephan Hänsel | SiLC | Measurements - Modules | | | | | Pt Modules:
- Sensoren sind Luftfeuhtigkeitsempfindlich |
|
10
|
Fri Jul 17 14:03:21 2009 |
Stephan Hänsel | | What to measure | | | | | Origami
Testbeam08 Module |
|
11
|
Fri Jul 31 19:23:26 2009 |
Thomas Bergauer | | Laser Spot size | | | | | 10cm nach Kollimator: Durchmesser 1.45mm (FWHM)
20cm
nach Kollimator: Durchmesser 1,54mm (FWHM) |
   |
12
|
Tue Aug 11 14:03:57 2009 |
Marko Dragicevic | | Sensor Designs | | | | | Screenshots
HEPHY
Gallery
GDS File Viewer
|
6x |
13
|
Fri Aug 14 16:45:25 2009 |
Stephan Hänsel | | Module - Setups | | | | |
5mm Inbus-Schlüssel
3mm Inbus Schlüssel
|
|
14
|
Fri Aug 14 19:35:43 2009 |
Thomas Bergauer | Pt_ITE512 | intcal | | | | | HV=100V except h05-ITE-512 and h06-ITE-512
(runaway, HV off)
h01-Pt: 10uA |
|
15
|
Fri Aug 14 21:36:17 2009 |
Markus Friedl | | Config files | | | | | Status of config files as of Friday 14
August 2009 late evening
|
|
16
|
Wed Aug 19 15:37:37 2009 |
Christian Irmler | ITE128 | internal calibration | cal001 | | 15:31:29 | | 8 modules, HV=70V, 40MHz, 1 sample
no beam
APV 4,5: inverter off, higher baseline |
|
17
|
Wed Aug 19 15:41:17 2009 |
Wolfgang Kiesenhofer | SiLC | angle scan templates | | | | | Linie am rechten Seitenrand (in der Vorschau
unten leider nicht gut zu sehen) sollte mit
dem rechten Rand der Basisplatte abschließen |
13x |
20
|
Wed Aug 19 22:57:13 2009 |
Marko Dragicevic | | How-To | | | | | TLU (run from DAQPCHEPHY):
ssh
eudet@eudetmac001.cern.ch
ssh tlupc |
|
21
|
Thu Aug 20 00:16:45 2009 |
Christian Irmler | ITE128 | pedestal correction | pedcorr001 | | 20.08.2009 00:14:21 | 20.08.2009 00:24:28 | DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz
pedestal correction |
|
23
|
Thu Aug 20 10:48:39 2009 |
Christian Irmler | alignment_beam | internal calibration | cal002 | | 20.08.2009 10:49:07 | 20.08.2009 10:59:43 | 2 alignement modules
location in beam direction: h04-h03
HV=70V, 40MHz, 1 sample |
|
24
|
Thu Aug 20 11:05:26 2009 |
Christian Irmler | alignment_beam | pedeatal correction | pedcorr002 | | 20.08.2009 11:05:41 | 20.08.2009 11:09:35 | 2 alignement modules
location in beam direction: h04-h03
HV=70V, 40MHz, 1 sample |
|
32
|
Thu Aug 20 15:50:58 2009 |
Manfred Valentan | alignment_laser | slow control: HV graph | all alignemnt_laser runs | | 20.08.09 10:36 | 4h 43m 52s later | blue graph: h03
white graph: h04 |
|
33
|
Thu Aug 20 15:54:45 2009 |
Manfred Valentan | BELLE | temp/humidty logger data | | | | | position: underneath telescope. dewpoint
~ 15 degree
test with chiller: running 4 hours |
|