ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
46
|
Fri Aug 21 12:06:06 2009 |
Christian Irmler | BELLE | APVDAQ standalone 40 MHz | run007 | interrupted | 21.08.2009 11:06:45 | 21.08.2009 11:10:40 |
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
zero supressed w bad strip definition of origami module, but reverse readout order of APV 2 and 3 on p-side |
47
|
Fri Aug 21 12:06:29 2009 |
Christian Irmler | BELLE | APVDAQ standalone hit mode 40 MHz | run008 | 75000 | 21.08.2009 11:15:09 | 21.08.2009 11:29:53 |
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
same as run6873, but w improved timing --> peak is now at sample 2 or 3
since eudetmac was not reachable by VNC, the telescope has not been restarted !
zero supressed w bad strip definition of origami module, but natural readout order of APV 2 and 3 on p-side
hit cut = 4 |
48
|
Fri Aug 21 12:06:39 2009 |
Christian Irmler | BELLE | APVDAQ standalone hit mode 40 MHz | run009 | 75000 | 21.08.2009 11:48:22 | 21.08.2009 12:01:53 |
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
same as run6873, but w improved timing --> peak is now at sample 2 or 3
since eudetmac was not reachable by VNC, the telescope has not been restarted !
zero supressed w bad strip definition of origami module, but natural readout order of APV 2 and 3 on p-side
hit cut = 5 |
50
|
Fri Aug 21 12:22:43 2009 |
Christian Irmler | BELLE | APVDAQ standalone 31.8 MHz hit mode | run010 | 75000 | 21.08.2009 12:53:02 | 21.08.2009 13:35:01 |
4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
switched to external clock source
processed mode, hit cut = 4
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped) |
51
|
Fri Aug 21 13:38:20 2009 |
Christian Irmler | BELLE | APVDAQ standalone 31.8 MHz hit mode | run011 | 75000 | 21.08.2009 13:35:25 | |
4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source
processed mode, hit cut = 5
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped) |
57
|
Fri Aug 21 18:35:13 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 31.8 MHz transparent mode | run012 | 60000 | 21.08.2009 18:31:01 | 21.08.2009 23:25:03 |
4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source
transparent mode
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors), beam spot: 9x9 mm
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
APVDAQ and telescope runs are not synchronized |
59
|
Sat Aug 22 01:06:34 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode (cooling?) | run013 | 75000 | 21.08.2009 23:49:38 | 22.08.2009 03:21:48 |
Belle DUT, tranparent mode
HV=80V, 40 MHz, beam on, 120 GeV
6 samples
chiller set to 13 deg.
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors), beam spot: 9x9 mm
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
APVDAQ and telescope runs are not synchronized
trigger rate: about 300 - 500 ev / spill
there was probably no water flow throught the pipe of the origami module during this run --> must be repeated |
60
|
Sat Aug 22 03:27:13 2009 |
Thomas Bergauer | BELLE | APVDAQ + telescope 31,8 MHz transparent mode (cooling?) | run014 | 75k | 22.08.2009 03:25:23 | 22.08.2009 07:08:09 |
HV=80V, 31.8 MHz, beam on, 120 GeV
6 samples
chiller set to 13 deg.
f=31.8 MHz
config file: cern09_belle_31.8mhz_multi6.cfg
there was probably no water flow throught the pipe of the origami module during this run --> must be repeated
|
61
|
Sat Aug 22 08:32:02 2009 |
Thomas Bergauer | BELLE | APVDAQ + telescope 31,8 MHz hit mode (cooling?) | run015 | 75k | 22.08.2009 08:15:05 | 22.08.2009 09:25:21 |
HV=80V, 31.8 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=4
chiller set to 13 deg.
f=31.8 MHz
config file: cern09_belle_31.8mhz_hit_multi6.cfg
there was probably no water flow throught the pipe of the origami module during this run --> must be repeated
|
62
|
Sat Aug 22 09:44:50 2009 |
Thomas Bergauer | BELLE | APVDAQ + telescope 31,8 MHz hit mode (cooling?) | run016 | 75k | 22.08.2009 09:42:38 | 22.08.2009 10:24:05 |
HV=80V, 31.8 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=5
chiller set to 13 deg.
f=31.8 MHz
config file: cern09_belle_31.8mhz_hit_cut5_multi6.cfg
there was probably no water flow throught the pipe of the origami module during this run!
|
63
|
Sat Aug 22 10:28:50 2009 |
Thomas Bergauer | BELLE | APVDAQ + telescope 40 MHz hit mode (cooling?) | run017 | 75k | 22.08.2009 10:26:28 | 22.08.2009 11:16:12 |
HV=80V, 40 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=4
chiller set to 13 deg.
f=40 MHz
config file: cern09_belle_hit_multi6.cfg
there was probably no water flow throught the pipe of the origami module during this run!
|
64
|
Sat Aug 22 11:26:00 2009 |
Thomas Bergauer | BELLE | APVDAQ + telescope 40 MHz hit mode (cooling?) | run018 | 75k | 22.08.2009 11:16:57 | 22.08.2009 11:58:56 |
HV=80V, 40 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=5
chiller set to 13 deg.
f=40 MHz
config file: cern09_belle_hit_cut5_multi6.cfg
trigger rate about 3500 ev / spill
there was probably no water flow throught the pipe of the origami module during this run!
|
73
|
Sat Aug 22 15:52:33 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 31.8 MHz transparent mode + cooling | run019 | 75k | 22.08.2009 15:50:40 | 22.08.2009 19:14:21 |
Belle DUT, HV=80V, 31.8 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg, 2900 rpm
water flow checked befor start of run |
74
|
Sat Aug 22 19:19:20 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode + cooling | run020 | 75k | 22.08.2009 19:17:29 | 22.08.2009 22:09:53 |
Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg, 2900 rpm
water flow checked befor start of run |
77
|
Sun Aug 23 01:46:03 2009 |
Thomas Bergauer | ITE128 | 2nd run with ITE128: central position | run021 | 100k | 23.08.09 00:10 (ca.) | 23.08.2009 02:15:10 |
ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope
XY-Table: x=48, y=115.31
new beam position (used TRIM4 magnet at 7A): y down by 2mm. see attached picture |
Attachment 1: Picture_1.png
|
|
78
|
Sun Aug 23 02:18:20 2009 |
Thomas Bergauer | ITE128 | 2nd run with ITE128: top position (3mm below center); during night | run022 | 407895 | 23.08.2009 02:16:21 | 23.08.2009 08:04:09 |
ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope
XY-Table: x=48, y=112.31 |
Attachment 1: Picture_1.png
|
|
79
|
Sun Aug 23 08:13:31 2009 |
Thomas Bergauer | ITE128 | 2nd run with ITE128: top position (4mm below center) | run023 | 100k | 23.08.2009 08:06:58 | 23.08.2009 09:30:53 |
ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope
XY-Table: x=48, y=111.31 |
81
|
Sun Aug 23 14:03:14 2009 |
Manfred Valentan | Pt_ITE512 | Pt & ITE512 center position, 1 deg | run024 | 20000 | 23.08.2009 13:59:06 | |
Pt: 1 Grad, HV=200V, 0% RH
ITE512: HV=70V
X-Y-Table: x=99.6, y=36
Telescope: run7316 |
85
|
Mon Aug 24 11:58:23 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 1deg air | run025 | 20k | 24.08.09 11:24:33 | 24.08.09 12:40:25 |
Pt: 1 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
86
|
Mon Aug 24 13:01:14 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 3deg air | run026 | 20k | 24.08.09 11:24:33 | 24.08.2009 14:11:45 |
Pt: 3 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |