Thu Aug 20 19:35:06 2009, Manfred Valentan, alignment_laser, laser at high intensity (saturation on near sensor, good signal on far sensor), laser004, 100000, 20.08.2009 19:18:47, 20.08.2009 19:35:05
|
HV=70V, 40MHz, 6 samples, beam off
5ns trigger pulse width, 1 kHz trigger,
current_laser=10mA, |
Thu Aug 20 19:46:02 2009, Manfred Valentan, alignment_laser, laser at high intensity, far sensor in 2nd position, laser005, 50000, 20.08.2009 19:45:16, 20.08.2009 19:53:01
|
far sensor in 2nd position; laser at high intensity (saturation on near sensor, good signal on far sensor)
HV=70V, 40MHz, 6 samples, beam off, far sensor in 2nd position
5ns trigger pulse width, 1 kHz trigger, |
Thu Aug 20 19:56:21 2009, Manfred Valentan, alignment_laser, background mesurement with laser OFF, laser006, 10k, 20.08.2009 19:54:04, 20.08.2009 19:55:38
|
|
Thu Aug 20 20:06:06 2009, Manfred Valentan, alignment_laser, low intensity (like laser001), but far sensor in 2nd position, laser007, 50k, 20.08.2009 19:57:52, 20.08.2009 20:05:34
|
HV=70V, 40MHz, 6 samples, beam off, far sensor in 2nd position
5ns trigger pulse width, 1 kHz trigger,
current_laser=10mA, |
Sun Aug 23 14:03:14 2009, Manfred Valentan, Pt_ITE512, Pt & ITE512 center position, 1 deg, run024, 20000, 23.08.2009 13:59:06,
|
Pt: 1 Grad, HV=200V, 0% RH
ITE512: HV=70V
X-Y-Table: x=99.6, y=36 |
Tue Aug 25 18:22:25 2009, Manfred Valentan, Pt_ITE512, Pt_ITE512 40deg NO air! (for calibration), run041, 10k, 25.08.2009 18:20:30, 25.08.2009
|
Pt: 40 Grad, HV=200V, 36.9% (start run) to xx% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=51muA
X-Y-Table: x=99.6, y=36 |
Mon Jul 6 14:30:45 2009, Marko Dragicevic, , Equipment List, , , ,
|
[B]Slow Control:[/B]
Source Measurement Unit Keithley K2410, Inv.Nr.: 540-702, 2000EUR
-- Koax-Kabel + Adapter auf Banane
|
Tue Aug 11 14:03:57 2009, Marko Dragicevic, , Sensor Designs, , , , 6x
|
Screenshots
HEPHY Gallery
GDS File Viewer
KLayout Website
Layer Properties File Warsaw.lyp in den Attachments. |
Wed Aug 19 22:57:13 2009, Marko Dragicevic, , How-To, , , ,
|
TLU (run from DAQPCHEPHY):
ssh eudet@eudetmac001.cern.ch
ssh tlupc
~\eudaq\bin\TLUControl.exe -d1 -a12 |
Sun Aug 23 13:15:42 2009, Marko Dragicevic, Pt_ITE512, Current and Humindity during first Run, , , ,
|
Current of Pt modules during first run
Data of the run was dicarded.
Compressed air flow was at ~2 bars during run. Graph shows RH rise after switching of CA flow. Restarted at around 7% with very low pressure.
Timescales for RH and I graph are different!!! |
Tue Aug 25 09:01:12 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 2deg air , run034, 20k, 25.08.09 08:56:18 , 25.08.09 09:45:
|
Pt: 2 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
Tue Aug 25 09:53:16 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 4deg NO air!, run035, 20k, 25.08.2009 09:50, 25.08.2009 11:00
|
Pt: 4 Grad, HV=200V, 0% (start run) to 14% (end run) RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
Tue Aug 25 12:30:04 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 8deg NO air!, run037, 20k, 25.08.2009 12:45, 25.08.2009 13:40:13
|
Pt: 8 Grad, HV=200V, 28% (start run) to 31% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=49.1muA
X-Y-Table: x=99.6, y=36 |
Tue Aug 25 13:48:30 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 10deg NO air!, run038, 20k, 25.08.2009 13:54:54, 25.08.2009 15:22:38
|
Pt: 10 Grad, HV=200V, 31.7% (start run) to 33.8% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=50muA
X-Y-Table: x=99.6, y=36 |
Tue Aug 25 15:33:07 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 12deg NO air! , run039, 20k, 25.08.2009 15:35, 25.08.2009 17:10
|
Pt: 12 Grad, HV=200V, 34.4% (start run) to 36.1% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=50muA
X-Y-Table: x=99.6, y=36 |
Tue Aug 25 17:14:52 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 17deg NO air!, run040, 20k, 25.08.2009 17:17:11, 25.08.2009 18:08:57
|
Pt: 17 Grad, HV=200V, 36.5% (start run) to xx.1% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=51muA
X-Y-Table: x=99.6, y=36 |
Fri Aug 14 21:36:17 2009, Markus Friedl, , Config files, , , ,
|
Status of config files as of Friday 14 August 2009 late evening
Config
file name
Timing adjusted
Sensor definition
Tested
|
Mon Jul 6 12:22:47 2009, Stephan Hänsel, SiLC, Measurements - hybrids with APV, , , ,
|
Pt Modules:
Hybrids with 4 APVs:
h01-4APV
h02-4APV
|
Mon Jul 6 12:24:53 2009, Stephan Hänsel, SiLC, Module Drawings, , , ,
|
Pt Modules:
3D-View
technical drawings:
|
Mon Jul 6 12:29:20 2009, Stephan Hänsel, SiLC, Sensors - layout, , , ,
|
Pt Modules:
CMS OB1 Sensors:
CMS OB1 Dimensions
|
|