Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 4 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Thu Aug 20 12:35:13 2009, Christian Irmler, alignment_beam, top right on sensor, point 3, run6865, 10600, 20.08.2009 12:31:35, 20.08.2009 12:48:04 
Entry  Thu Aug 20 14:31:29 2009, Christian Irmler, alignment_beam, bottom left on sensor, point 5, run6868, 10600, 20.08.2009 14:36:00, 20.08.2009 14:51:57 
Entry  Thu Aug 20 19:56:21 2009, Manfred Valentan, alignment_laser, background mesurement with laser OFF, laser006, 10k, 20.08.2009 19:54:04, 20.08.2009 19:55:38 
Entry  Tue Aug 25 18:22:25 2009, Manfred Valentan, Pt_ITE512, Pt_ITE512 40deg NO air! (for calibration), run041, 10k, 25.08.2009 18:20:30, 25.08.2009 
Entry  Wed Aug 26 07:19:42 2009, Christian Irmler, BELLE, APVDAQ + telescope 31.8 MHz transparent mode + cooling, run044, 13504, 26.08.2009 07:18:19, 26.08.2009 08:46:11 (beam shut down @ 8:00) 
Entry  Tue Aug 25 01:33:18 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 0deg air, run033, 151724, 25.08.09 01:35:18, 25.08.2009 08:44:27 
Entry  Mon Aug 24 22:12:22 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 15deg air, run032, 19456, 24.08.09 22:18:08, 24.08.09 23:25:52 
Entry  Sun Aug 23 14:03:14 2009, Manfred Valentan, Pt_ITE512, Pt & ITE512 center position, 1 deg, run024, 20000, 23.08.2009 13:59:06,  
Entry  Mon Aug 24 11:58:23 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 1deg air, run025, 20k, 24.08.09 11:24:33, 24.08.09 12:40:25 
Entry  Mon Aug 24 13:01:14 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 3deg air, run026, 20k, 24.08.09 11:24:33, 24.08.2009 14:11:45 
Entry  Mon Aug 24 14:23:01 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 5deg air, run027, 20k, 24.08.2009 14:27:07, 24.08.2009 15:26:20 
Entry  Mon Aug 24 15:28:49 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 7deg air, run028, 20k, 24.08.09 15:39:50, 24.08.09 16:40:54 
Entry  Mon Aug 24 16:44:36 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 9deg air, run029, 20k, 24.08.09 17:03:21, 24.08.09 18:20:55 
Entry  Mon Aug 24 18:30:07 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 11deg air, run030, 20k, 24.08.09 18:45:09, 24.08.09 20:37:04 
Entry  Mon Aug 24 22:04:56 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 13deg air, run031, 20k, 24.08.09 20:53:50, 24.08.09 22:00:49 
Entry  Tue Aug 25 09:01:12 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 2deg air , run034, 20k, 25.08.09 08:56:18 , 25.08.09 09:45:  
Entry  Tue Aug 25 09:53:16 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 4deg NO air!, run035, 20k, 25.08.2009 09:50, 25.08.2009 11:00 
Entry  Tue Aug 25 11:26:23 2009, Thomas Bergauer, Pt_ITE512, Pt_ITE512 6deg NO air!, run036, 20k, 25.08.2009 11:25, 25.08.2009 12:19:55 
Entry  Tue Aug 25 12:30:04 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 8deg NO air!, run037, 20k, 25.08.2009 12:45, 25.08.2009 13:40:13 
Entry  Tue Aug 25 13:48:30 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 10deg NO air!, run038, 20k, 25.08.2009 13:54:54, 25.08.2009 15:22:38 
ELOG V3.1.5-fc6679b