Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 4 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Tue Aug 25 01:33:18 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 0deg air, run033, 151724, 25.08.09 01:35:18, 25.08.2009 08:44:27 
Pt: 0 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
Entry  Sun Aug 23 14:03:14 2009, Manfred Valentan, Pt_ITE512, Pt & ITE512 center position, 1 deg, run024, 20000, 23.08.2009 13:59:06,  
Pt: 1 Grad, HV=200V, 0% RH
ITE512: HV=70V
X-Y-Table: x=99.6, y=36
Entry  Sun Aug 23 23:38:27 2009, Georg Auzinger, , Phone numbers, , , ,  
 Georg #70
Wolfgang - Building: 41, Room: 204, Tel: ?
Manfred: Building 38, Room 522, Tel: 70522
Entry  Mon Jul 6 12:24:53 2009, Stephan Hänsel, SiLC, Module Drawings, , , ,  
 Pt Modules: 

     3D-View

    technical drawings:
    
Entry  Mon Jul 6 16:23:51 2009, Stephan Hänsel, SiLC, Module Components, , , ,  
 Pt Modules: 

Pt-1:
Entry  Fri Aug 14 16:45:25 2009, Stephan Hänsel, , Module - Setups, , , ,  
 

    5mm Inbus-Schlüssel
    3mm Inbus Schlüssel
    6- 2(1) x 30 Pt-Pins
    beim 5mm-Sockel müssen
die 2 Löcher über die das optische Modul h03 verschraubt wird noch ausgeweitet werden (Thomas)
    bei Pt-Deckel oben einzeichnen welche
Entry  Mon Jul 6 12:22:47 2009, Stephan Hänsel, SiLC, Measurements - hybrids with APV, , , ,  
Pt Modules: 
Hybrids with 4 APVs:
     h01-4APV 

    h02-4APV 

Entry  Mon Jul 6 16:22:36 2009, Stephan Hänsel, SiLC, Measurements - Sensors, , , ,  
 Pt Modules: 
OB1-Sensors:
     30210331516116 
     30210331415917 

    30210314845402 
     30210332911309 

 
Entry  Thu Jul 9 10:29:58 2009, Stephan Hänsel, SiLC, Measurements - Modules, , , ,  
 Pt Modules: 
- Sensoren sind Luftfeuhtigkeitsempfindlich
- die Sensoren brauchen einige Zeit unter Spannung bis sie sich bei einem akzeptablen Strom stabilisieren 
Entry  Fri Jul 31 19:23:26 2009, Thomas Bergauer, , Laser Spot size, , , ,  laser_spot_overview.jpglaser_spot_10cm.jpglaser_spot_20cm.jpglaser_spot_30cm.jpg
10cm nach Kollimator: Durchmesser 1.45mm (FWHM)
20cm nach Kollimator: Durchmesser 1,54mm (FWHM)
Entry  Fri Dec 4 12:21:56 2009, Wolfgang Kiesenhofer, , ITE128 strip correlation kendall tau (preliminary result), , , ,  stripcorr_mod1_thrs5_ktau_ev100000_run002_strip.pdfstripcorr_mod2_thrs5_ktau_ev100000_run002_strip.pdfstripcorr_mod6_thrs5_ktau_ev100000_run002_strip.pdf
Kendall tau (rank correlation) for module 1 (single layer 1 / h13), module 2 (single layer 2 / h14),  module 6 (standard sensor 2 / h12)
 
 
Entry  Wed Aug 19 20:43:14 2009, Christian Irmler, ITE128, ITE128 shooting into strips w/o pitch adapter, low position, run001, 100600, 19.08.2009 20:42:08, 19.08.2009 22:54:21 
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
Entry  Wed Aug 19 22:56:07 2009, Christian Irmler, ITE128, ITE128 shooting into strips w pitch adapter, upper position, run002, 100600, 19.08.2009 22:54:23, 20.08.2009 00:11:31 
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
Entry  Thu Aug 20 00:31:45 2009, Christian Irmler, ITE128, ITE128 shooting into strips w pitch adapter, upper position, run003, 100600, 20.08.2009 00:27:36,  
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
Entry  Wed Sep 2 14:15:17 2009, Wolfgang Kiesenhofer, ITE128, ITE 128 Cross-Talk, run002, , ,  stripcorr_modall_thrs3_ktau.pdf
Preliminary strip correlation (Kendalls Tau) for threshold = 3*stripnoise.
Entry  Wed Aug 19 22:57:13 2009, Marko Dragicevic, , How-To, , , ,  
TLU (run from DAQPCHEPHY):
ssh eudet@eudetmac001.cern.ch
ssh tlupc
~\eudaq\bin\TLUControl.exe -d1 -a12
Entry  Mon Jul 6 14:30:45 2009, Marko Dragicevic, , Equipment List, , , ,  carnet_aug09.xls
[B]Slow Control:[/B]
Source Measurement Unit Keithley K2410, Inv.Nr.: 540-702, 2000EUR
-- Koax-Kabel + Adapter auf Banane
Entry  Fri Aug 21 22:42:32 2009, Thomas Bergauer, common, EUDAQ config file used when running with telescope, , , ,  testfortis_with_eudrb_beam_backpressure_WITH_SILC.conf


 
Used until Friday, 21.08.09:
Entry  Sun Aug 23 13:15:42 2009, Marko Dragicevic, Pt_ITE512, Current and Humindity during first Run, , , ,  IandRH_first_Pt_run.pngPicture_1.png
Current of Pt modules during first run
Data of the run was dicarded.
Compressed air flow was at ~2 bars during run. Graph shows RH rise after switching of CA flow. Restarted at around 7% with very low pressure.
Timescales for RH and I graph are different!!!
Entry  Fri Aug 14 21:36:17 2009, Markus Friedl, , Config files, , , ,  
Status of config files as of Friday 14 August 2009 late evening

    
        
            Config
file name
            Timing adjusted
            Sensor definition
            Tested
ELOG V3.1.5-fc6679b