Home
CMS Production
Clean room
MedAustron
HEPHY
testbeams
old
testbeam-RD50-DESY-Apr2024
testbeam-RD50-DESY-Jul2023
testbeam-RD50-CERN-Oct2022
testbeam-DESY-Oct2017
testbeam-DESY-April2017
testbeam-SPS2015
testbeam-SPS2014
testbeam-DESY14
testbeam-SPS12
testbeam-SPS11
testbeam-SPS10
testbeam-SPS09
testbeam-SPS08
LP-TPC
HEPHY logbook for testbeam at SPS June 2009, Page 3 of 6
Not logged in
Find
|
Login
|
Help
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Project --
common
SiLC
BELLE
Pt_ITE512
ITE128
alignment_laser
alignment_beam
106 Entries
Goto page
Previous
1
,
2
, 3,
4
,
5
,
6
Next
All
Sun Aug 23 17:18:25 2009, Christian Irmler, Pt_ITE512, pedestal correction, pedcorr008, , 23.08.2009 17:17:36 ,
Sun Aug 23 17:19:50 2009, Christian Irmler, Pt_ITE512, internal calibration, cal011, , 23.08.2009 16:30:43, 23.08.2009 17:02:14
Sun Aug 23 23:38:27 2009, Georg Auzinger, , Phone numbers, , , ,
Tue Aug 25 09:00:51 2009, Thomas Bergauer, , beam conditions, , , ,
Wed Aug 26 14:26:13 2009, Wolfgang Kiesenhofer, ITE128, S/N final Single-Metal, run001 & run002, , ,
Wed Sep 2 14:15:17 2009, Wolfgang Kiesenhofer, ITE128, ITE 128 Cross-Talk, run002, , ,
Fri Dec 4 12:21:56 2009, Wolfgang Kiesenhofer, , ITE128 strip correlation kendall tau (preliminary result), , , ,
Thu Aug 20 19:12:23 2009, Manfred Valentan, alignment_laser, background mesurement with laser OFF, laser002, 10000, 20.08.2009 19:10:09, 20.08.2009 19:11:57
Thu Aug 20 19:15:29 2009, Manfred Valentan, alignment_laser, laser on, laser003, 10000, 20.08.2009 19:13:04, 20.08.2009 19:14:49
Thu Aug 20 18:56:25 2009, Christian Irmler, alignment_laser, laser, laser001, 100000, 20.08.2009 18:48:53,
Thu Aug 20 19:35:06 2009, Manfred Valentan, alignment_laser, laser at high intensity (saturation on near sensor, good signal on far sensor), laser004, 100000, 20.08.2009 19:18:47, 20.08.2009 19:35:05
Wed Aug 19 20:43:14 2009, Christian Irmler, ITE128, ITE128 shooting into strips w/o pitch adapter, low position, run001, 100600, 19.08.2009 20:42:08, 19.08.2009 22:54:21
Wed Aug 19 22:56:07 2009, Christian Irmler, ITE128, ITE128 shooting into strips w pitch adapter, upper position, run002, 100600, 19.08.2009 22:54:23, 20.08.2009 00:11:31
Thu Aug 20 00:31:45 2009, Christian Irmler, ITE128, ITE128 shooting into strips w pitch adapter, upper position, run003, 100600, 20.08.2009 00:27:36,
Wed Aug 26 01:32:25 2009, Christian Irmler, BELLE, APVDAQ + telescope 40 MHz transparent mode + cooling, run043, 100600, 26.08.2009 01:46:38 , 26.08.2009 07:10:14
Sun Aug 23 01:46:03 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: central position, run021, 100k, 23.08.09 00:10 (ca.), 23.08.2009 02:15:10
Sun Aug 23 08:13:31 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: top position (4mm below center), run023, 100k, 23.08.2009 08:06:58, 23.08.2009 09:30:53
Thu Aug 20 11:23:04 2009, Christian Irmler, alignment_beam, beam in center of sensor w telescope, run004 (6860 telescope), 10600, 20.08.2009 11:09:50 , 20.08.2009 11:25:16
Thu Aug 20 11:38:11 2009, Christian Irmler, alignment_beam, top center, point 7, run6861 (+6862), 10600, 20.08.2009 11:36:35, 20.08.2009 11:53:51
Thu Aug 20 12:18:40 2009, Christian Irmler, alignment_beam, top left on sensor, point 2, run6863 (telescope 6864), 10600, 20.08.2009 12:07:28, 20.08.2009 12:25:57
Goto page
Previous
1
,
2
, 3,
4
,
5
,
6
Next
All
ELOG V3.1.5-fc6679b