Entry  Mon Aug 24 22:12:22 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 15deg air, run032, 19456, 24.08.09 22:18:08, 24.08.09 23:25:52 

Pt: 15 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
 
no beam
--> run stopped after 19456 events
Entry  Mon Aug 24 22:04:56 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 13deg air, run031, 20k, 24.08.09 20:53:50, 24.08.09 22:00:49 

Pt: 13 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
Entry  Mon Aug 24 18:30:07 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 11deg air, run030, 20k, 24.08.09 18:45:09, 24.08.09 20:37:04 

Pt: 11 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
Entry  Mon Aug 24 16:44:36 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 9deg air, run029, 20k, 24.08.09 17:03:21, 24.08.09 18:20:55 

Pt: 9 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
Entry  Mon Aug 24 15:28:49 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 7deg air, run028, 20k, 24.08.09 15:39:50, 24.08.09 16:40:54 

Pt: 7 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
Entry  Mon Aug 24 14:23:01 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 5deg air, run027, 20k, 24.08.2009 14:27:07, 24.08.2009 15:26:20 

Pt: 5 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
Entry  Mon Aug 24 13:01:14 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 3deg air, run026, 20k, 24.08.09 11:24:33, 24.08.2009 14:11:45 

Pt: 3 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
Entry  Mon Aug 24 11:58:23 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 1deg air, run025, 20k, 24.08.09 11:24:33, 24.08.09 12:40:25 

Pt: 1 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
Entry  Sun Aug 23 14:03:14 2009, Manfred Valentan, Pt_ITE512, Pt & ITE512 center position, 1 deg, run024, 20000, 23.08.2009 13:59:06,  

Pt: 1 Grad, HV=200V, 0% RH
ITE512: HV=70V
X-Y-Table: x=99.6, y=36
Telescope: run7316

Entry  Sun Aug 23 08:13:31 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: top position (4mm below center), run023, 100k, 23.08.2009 08:06:58, 23.08.2009 09:30:53 

ITE128

HV = 70V, 40MHz, 120 GeV

TLU trigger w telescope 

XY-Table: x=48, y=111.31

Entry  Sun Aug 23 02:18:20 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: top position (3mm below center); during night, run022, 407895, 23.08.2009 02:16:21, 23.08.2009 08:04:09 Picture_1.png

ITE128

HV = 70V, 40MHz, 120 GeV

TLU trigger w telescope 

XY-Table: x=48, y=112.31

Entry  Sun Aug 23 01:46:03 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: central position, run021, 100k, 23.08.09 00:10 (ca.), 23.08.2009 02:15:10 Picture_1.png

ITE128

HV = 70V, 40MHz, 120 GeV

TLU trigger w telescope 

XY-Table: x=48, y=115.31

new beam position (used TRIM4 magnet at 7A): y down by 2mm. see attached picture

Entry  Sat Aug 22 19:19:20 2009, Christian Irmler, BELLE, APVDAQ + telescope 40 MHz transparent mode + cooling, run020, 75k, 22.08.2009 19:17:29, 22.08.2009 22:09:53 

Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg,  2900 rpm

water flow checked befor start of run

Entry  Sat Aug 22 15:52:33 2009, Christian Irmler, BELLE, APVDAQ + telescope 31.8 MHz transparent mode + cooling, run019, 75k, 22.08.2009 15:50:40, 22.08.2009 19:14:21 

Belle DUT, HV=80V, 31.8 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg,  2900 rpm

water flow checked befor start of run

Entry  Sat Aug 22 11:26:00 2009, Thomas Bergauer, BELLE, APVDAQ + telescope 40 MHz hit mode (cooling?), run018, 75k, 22.08.2009 11:16:57, 22.08.2009 11:58:56 

 HV=80V, 40 MHz, beam on, 120 GeV

6 samples, hit mode, hitcut=5
chiller set to 13 deg.
 

f=40 MHz

config file: cern09_belle_hit_cut5_multi6.cfg

 

trigger rate about 3500 ev / spill

 

there was probably no water flow throught the pipe of the origami module during this run!

Entry  Sat Aug 22 10:28:50 2009, Thomas Bergauer, BELLE, APVDAQ + telescope 40 MHz hit mode (cooling?), run017, 75k, 22.08.2009 10:26:28, 22.08.2009 11:16:12 

 HV=80V, 40 MHz, beam on, 120 GeV

6 samples, hit mode, hitcut=4
chiller set to 13 deg.
 

f=40 MHz

config file: cern09_belle_hit_multi6.cfg

 

there was probably no water flow throught the pipe of the origami module during this run!

Entry  Sat Aug 22 09:44:50 2009, Thomas Bergauer, BELLE, APVDAQ + telescope 31,8 MHz hit mode (cooling?), run016, 75k, 22.08.2009 09:42:38, 22.08.2009 10:24:05 

 HV=80V, 31.8 MHz, beam on, 120 GeV

6 samples, hit mode, hitcut=5
chiller set to 13 deg.
 

f=31.8 MHz

config file: cern09_belle_31.8mhz_hit_cut5_multi6.cfg

 

there was probably no water flow throught the pipe of the origami module during this run!

Entry  Sat Aug 22 08:32:02 2009, Thomas Bergauer, BELLE, APVDAQ + telescope 31,8 MHz hit mode (cooling?), run015, 75k, 22.08.2009 08:15:05, 22.08.2009 09:25:21 

 HV=80V, 31.8 MHz, beam on, 120 GeV

6 samples, hit mode, hitcut=4
chiller set to 13 deg.
 

f=31.8 MHz

config file: cern09_belle_31.8mhz_hit_multi6.cfg

 

there was probably no water flow throught the pipe of the origami module during this run --> must be repeated

Entry  Sat Aug 22 03:27:13 2009, Thomas Bergauer, BELLE, APVDAQ + telescope 31,8 MHz transparent mode (cooling?), run014, 75k, 22.08.2009 03:25:23, 22.08.2009 07:08:09 

 HV=80V, 31.8 MHz, beam on, 120 GeV

6 samples
chiller set to 13 deg.
 

f=31.8 MHz

config file: cern09_belle_31.8mhz_multi6.cfg

 

there was probably no water flow throught the pipe of the origami module during this run --> must be repeated

Entry  Sat Aug 22 01:06:34 2009, Christian Irmler, BELLE, APVDAQ + telescope 40 MHz transparent mode (cooling?), run013, 75000, 21.08.2009 23:49:38 , 22.08.2009 03:21:48 

Belle DUT, tranparent mode
HV=80V, 40 MHz, beam on, 120 GeV
6 samples
chiller set to 13 deg.

beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors), beam spot: 9x9 mm
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

APVDAQ and telescope runs are not synchronized

trigger rate: about 300 - 500 ev / spill

there was probably no water flow throught the pipe of the origami module during this run --> must be repeated