Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 2 of 6  Not logged in ELOG logo
ID Date Author Project Subject Run Numberdown Events StartTime EndTime
  92   Mon Aug 24 22:12:22 2009 Georg AuzingerPt_ITE512Pt_ITE512 15deg airrun0321945624.08.09 22:18:0824.08.09 23:25:52

Pt: 15 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
 
no beam
--> run stopped after 19456 events
  91   Mon Aug 24 22:04:56 2009 Georg AuzingerPt_ITE512Pt_ITE512 13deg airrun03120k24.08.09 20:53:5024.08.09 22:00:49

Pt: 13 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
  90   Mon Aug 24 18:30:07 2009 Georg AuzingerPt_ITE512Pt_ITE512 11deg airrun03020k24.08.09 18:45:0924.08.09 20:37:04

Pt: 11 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
  89   Mon Aug 24 16:44:36 2009 Georg AuzingerPt_ITE512Pt_ITE512 9deg airrun02920k24.08.09 17:03:2124.08.09 18:20:55

Pt: 9 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
  88   Mon Aug 24 15:28:49 2009 Georg AuzingerPt_ITE512Pt_ITE512 7deg airrun02820k24.08.09 15:39:5024.08.09 16:40:54

Pt: 7 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
  87   Mon Aug 24 14:23:01 2009 Georg AuzingerPt_ITE512Pt_ITE512 5deg airrun02720k24.08.2009 14:27:0724.08.2009 15:26:20

Pt: 5 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
  86   Mon Aug 24 13:01:14 2009 Georg AuzingerPt_ITE512Pt_ITE512 3deg airrun02620k24.08.09 11:24:3324.08.2009 14:11:45

Pt: 3 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
  85   Mon Aug 24 11:58:23 2009 Georg AuzingerPt_ITE512Pt_ITE512 1deg airrun02520k24.08.09 11:24:3324.08.09 12:40:25

Pt: 1 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
  81   Sun Aug 23 14:03:14 2009 Manfred ValentanPt_ITE512Pt & ITE512 center position, 1 degrun0242000023.08.2009 13:59:06 

Pt: 1 Grad, HV=200V, 0% RH
ITE512: HV=70V
X-Y-Table: x=99.6, y=36
Telescope: run7316

  79   Sun Aug 23 08:13:31 2009 Thomas BergauerITE1282nd run with ITE128: top position (4mm below center)run023100k23.08.2009 08:06:5823.08.2009 09:30:53

ITE128

HV = 70V, 40MHz, 120 GeV

TLU trigger w telescope 

XY-Table: x=48, y=111.31

  78   Sun Aug 23 02:18:20 2009 Thomas BergauerITE1282nd run with ITE128: top position (3mm below center); during nightrun02240789523.08.2009 02:16:2123.08.2009 08:04:09

ITE128

HV = 70V, 40MHz, 120 GeV

TLU trigger w telescope 

XY-Table: x=48, y=112.31

Attachment 1: Picture_1.png
Picture_1.png
  77   Sun Aug 23 01:46:03 2009 Thomas BergauerITE1282nd run with ITE128: central positionrun021100k23.08.09 00:10 (ca.)23.08.2009 02:15:10

ITE128

HV = 70V, 40MHz, 120 GeV

TLU trigger w telescope 

XY-Table: x=48, y=115.31

new beam position (used TRIM4 magnet at 7A): y down by 2mm. see attached picture

Attachment 1: Picture_1.png
Picture_1.png
  74   Sat Aug 22 19:19:20 2009 Christian IrmlerBELLEAPVDAQ + telescope 40 MHz transparent mode + coolingrun02075k22.08.2009 19:17:2922.08.2009 22:09:53

Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg,  2900 rpm

water flow checked befor start of run

  73   Sat Aug 22 15:52:33 2009 Christian IrmlerBELLEAPVDAQ + telescope 31.8 MHz transparent mode + coolingrun01975k22.08.2009 15:50:4022.08.2009 19:14:21

Belle DUT, HV=80V, 31.8 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg,  2900 rpm

water flow checked befor start of run

  64   Sat Aug 22 11:26:00 2009 Thomas BergauerBELLEAPVDAQ + telescope 40 MHz hit mode (cooling?)run01875k22.08.2009 11:16:5722.08.2009 11:58:56

 HV=80V, 40 MHz, beam on, 120 GeV

6 samples, hit mode, hitcut=5
chiller set to 13 deg.
 

f=40 MHz

config file: cern09_belle_hit_cut5_multi6.cfg

 

trigger rate about 3500 ev / spill

 

there was probably no water flow throught the pipe of the origami module during this run!

  63   Sat Aug 22 10:28:50 2009 Thomas BergauerBELLEAPVDAQ + telescope 40 MHz hit mode (cooling?)run01775k22.08.2009 10:26:2822.08.2009 11:16:12

 HV=80V, 40 MHz, beam on, 120 GeV

6 samples, hit mode, hitcut=4
chiller set to 13 deg.
 

f=40 MHz

config file: cern09_belle_hit_multi6.cfg

 

there was probably no water flow throught the pipe of the origami module during this run!

  62   Sat Aug 22 09:44:50 2009 Thomas BergauerBELLEAPVDAQ + telescope 31,8 MHz hit mode (cooling?)run01675k22.08.2009 09:42:3822.08.2009 10:24:05

 HV=80V, 31.8 MHz, beam on, 120 GeV

6 samples, hit mode, hitcut=5
chiller set to 13 deg.
 

f=31.8 MHz

config file: cern09_belle_31.8mhz_hit_cut5_multi6.cfg

 

there was probably no water flow throught the pipe of the origami module during this run!

  61   Sat Aug 22 08:32:02 2009 Thomas BergauerBELLEAPVDAQ + telescope 31,8 MHz hit mode (cooling?)run01575k22.08.2009 08:15:0522.08.2009 09:25:21

 HV=80V, 31.8 MHz, beam on, 120 GeV

6 samples, hit mode, hitcut=4
chiller set to 13 deg.
 

f=31.8 MHz

config file: cern09_belle_31.8mhz_hit_multi6.cfg

 

there was probably no water flow throught the pipe of the origami module during this run --> must be repeated

  60   Sat Aug 22 03:27:13 2009 Thomas BergauerBELLEAPVDAQ + telescope 31,8 MHz transparent mode (cooling?)run01475k22.08.2009 03:25:2322.08.2009 07:08:09

 HV=80V, 31.8 MHz, beam on, 120 GeV

6 samples
chiller set to 13 deg.
 

f=31.8 MHz

config file: cern09_belle_31.8mhz_multi6.cfg

 

there was probably no water flow throught the pipe of the origami module during this run --> must be repeated

  59   Sat Aug 22 01:06:34 2009 Christian IrmlerBELLEAPVDAQ + telescope 40 MHz transparent mode (cooling?)run0137500021.08.2009 23:49:38 22.08.2009 03:21:48

Belle DUT, tranparent mode
HV=80V, 40 MHz, beam on, 120 GeV
6 samples
chiller set to 13 deg.

beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors), beam spot: 9x9 mm
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

APVDAQ and telescope runs are not synchronized

trigger rate: about 300 - 500 ev / spill

there was probably no water flow throught the pipe of the origami module during this run --> must be repeated

ELOG V3.1.5-fc6679b