Entry  Mon Jul 6 12:22:47 2009, Stephan Hänsel, SiLC, Measurements - hybrids with APV, , , ,  
Pt Modules: 
Hybrids with 4 APVs:
     h01-4APV 

    h02-4APV 

Entry  Mon Jul 6 12:24:53 2009, Stephan Hänsel, SiLC, Module Drawings, , , ,  
 Pt Modules: 

     3D-View

    technical drawings:
    
Entry  Mon Jul 6 12:29:20 2009, Stephan Hänsel, SiLC, Sensors - layout, , , ,  Wafer-Screenshot.png
 Pt Modules: 
CMS OB1 Sensors:

     CMS OB1 Dimensions 

 
Entry  Mon Jul 6 14:30:45 2009, Marko Dragicevic, , Equipment List, , , ,  carnet_aug09.xls
[B]Slow Control:[/B]
Source Measurement Unit Keithley K2410, Inv.Nr.: 540-702, 2000EUR
-- Koax-Kabel + Adapter auf Banane
Entry  Mon Jul 6 16:22:36 2009, Stephan Hänsel, SiLC, Measurements - Sensors, , , ,  
 Pt Modules: 
OB1-Sensors:
     30210331516116 
     30210331415917 

    30210314845402 
     30210332911309 

 
Entry  Mon Jul 6 16:23:51 2009, Stephan Hänsel, SiLC, Module Components, , , ,  
 Pt Modules: 

Pt-1:
Entry  Thu Jul 9 10:29:58 2009, Stephan Hänsel, SiLC, Measurements - Modules, , , ,  
 Pt Modules: 
- Sensoren sind Luftfeuhtigkeitsempfindlich
- die Sensoren brauchen einige Zeit unter Spannung bis sie sich bei einem akzeptablen Strom stabilisieren 
Entry  Fri Jul 17 14:03:21 2009, Stephan Hänsel, , What to measure, , , ,  
 Origami
 
Testbeam08 Module
Entry  Fri Jul 31 19:23:26 2009, Thomas Bergauer, , Laser Spot size, , , ,  laser_spot_overview.jpglaser_spot_10cm.jpglaser_spot_20cm.jpglaser_spot_30cm.jpg
10cm nach Kollimator: Durchmesser 1.45mm (FWHM)
20cm nach Kollimator: Durchmesser 1,54mm (FWHM)
Entry  Tue Aug 11 14:03:57 2009, Marko Dragicevic, , Sensor Designs, , , ,  6x
Screenshots
HEPHY Gallery
GDS File Viewer
 KLayout Website
 Layer Properties File Warsaw.lyp in den Attachments.
Entry  Fri Aug 14 16:45:25 2009, Stephan Hänsel, , Module - Setups, , , ,  
 

    5mm Inbus-Schlüssel
    3mm Inbus Schlüssel
    6- 2(1) x 30 Pt-Pins
    beim 5mm-Sockel müssen
die 2 Löcher über die das optische Modul h03 verschraubt wird noch ausgeweitet werden (Thomas)
    bei Pt-Deckel oben einzeichnen welche
Entry  Fri Aug 14 19:35:43 2009, Thomas Bergauer, Pt_ITE512, intcal, , , ,  
HV=100V except h05-ITE-512 and h06-ITE-512 (runaway, HV off)
h01-Pt: 10uA
h02-Pt: 1.6uA
Entry  Fri Aug 14 21:36:17 2009, Markus Friedl, , Config files, , , ,  
Status of config files as of Friday 14 August 2009 late evening

    
        
            Config
file name
            Timing adjusted
            Sensor definition
            Tested
Entry  Wed Aug 19 15:37:37 2009, Christian Irmler, ITE128, internal calibration, cal001, , 15:31:29,  
8 modules, HV=70V, 40MHz, 1 sample
no beam 
APV 4,5: inverter off, higher baseline = PAD modules
Entry  Wed Aug 19 15:41:17 2009, Wolfgang Kiesenhofer, SiLC, angle scan templates, , , ,  13x
Linie am rechten Seitenrand (in der Vorschau unten leider nicht gut zu sehen) sollte mit dem rechten Rand der Basisplatte abschließen (bezogen
auf die Beam Richtung).
Entry  Wed Aug 19 22:57:13 2009, Marko Dragicevic, , How-To, , , ,  
TLU (run from DAQPCHEPHY):
ssh eudet@eudetmac001.cern.ch
ssh tlupc
~\eudaq\bin\TLUControl.exe -d1 -a12
Entry  Thu Aug 20 00:16:45 2009, Christian Irmler, ITE128, pedestal correction, pedcorr001, , 20.08.2009 00:14:21, 20.08.2009 00:24:28 
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz
pedestal correction
Entry  Thu Aug 20 10:48:39 2009, Christian Irmler, alignment_beam, internal calibration, cal002, , 20.08.2009 10:49:07, 20.08.2009 10:59:43 
2 alignement modules
location in beam direction: h04-h03
HV=70V, 40MHz, 1 sample
Entry  Thu Aug 20 11:05:26 2009, Christian Irmler, alignment_beam, pedeatal correction, pedcorr002, , 20.08.2009 11:05:41, 20.08.2009 11:09:35 
2 alignement modules
location in beam direction: h04-h03
HV=70V, 40MHz, 1 sample
Entry  Thu Aug 20 15:50:58 2009, Manfred Valentan, alignment_laser, slow control: HV graph, all alignemnt_laser runs, , 20.08.09 10:36, 4h 43m 52s later slow_control_alignment_sensors.gif
blue graph: h03
white graph: h04
ELOG V3.1.5-fc6679b