| ID | Date  | Author | Project | Subject | Run Number | Events | StartTime | EndTime | Text |  |  | 114 | Fri Dec  4 12:21:56 2009 | Wolfgang Kiesenhofer |  | ITE128 strip correlation kendall tau (preliminary result) |  |  |  |  | Kendall tau (rank correlation) for module 1 (single layer 1 / h13), module 2 (single
 layer 2 / h14),  module 6 (standard
 |     |  | 107 | Wed Sep  2 14:15:17 2009 | Wolfgang Kiesenhofer | ITE128 | ITE 128 Cross-Talk | run002 |  |  |  | Preliminary strip correlation (Kendalls Tau) for threshold = 3*stripnoise.
 |   |  | 106 | Wed Aug 26 14:26:13 2009 | Wolfgang Kiesenhofer | ITE128 | S/N final Single-Metal | run001 & run002 |  |  |  | Most probable S/N, Single Metal Layer, 2D histogram fitted with langau in 5 bin
 (strips) slices.
 |   |  | 105 | Wed Aug 26 07:19:42 2009 | Christian Irmler | BELLE | APVDAQ + telescope 31.8 MHz transparent mode + cooling | run044 | 13504 | 26.08.2009  07:18:19 | 26.08.2009  08:46:11  (beam shut down @ 8:00) | Belle DUT, HV=80V,  31.8 MHz, 120 GeV
 6 samples, transparent mode
 |  |  | 104 | Wed Aug 26 01:32:25 2009 | Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode + cooling | run043 | 100600 | 26.08.2009  01:46:38 | 26.08.2009  07:10:14 | Belle DUT, HV=80V,  40 MHz, 120 GeV 6 samples, transparent mode
 w cooling, chiller set to 13 deg,
 |  |  | 103 | Tue Aug 25 20:21:31 2009 | Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode | run042 | 85189 | 25.08.2009  20:18:18 | 26.08.2009  01:27:12 | Belle DUT, HV=80V,  40 MHz, 120 GeV 6 samples, transparent mode
 no cooling
 |  |  | 102 | Tue Aug 25 18:22:25 2009 | Manfred Valentan | Pt_ITE512 | Pt_ITE512 40deg NO air! (for calibration) | run041 | 10k | 25.08.2009 18:20:30 | 25.08.2009 | Pt: 40 Grad, HV=200V, 36.9% (start run) to xx% (end run) RH, beam on, 120GeV
 ITE512: HV=70V, I=51muA
 X-Y-Table:
 |  |  | 101 | Tue Aug 25 17:14:52 2009 | Marko Dragicevic | Pt_ITE512 | Pt_ITE512 17deg NO air! | run040 | 20k | 25.08.2009  17:17:11 | 25.08.2009  18:08:57 | Pt: 17 Grad, HV=200V, 36.5% (start run) to xx.1% (end run) RH, beam on, 120GeV
 ITE512: HV=70V, I=51muA
 X-Y-Table:
 |   |  | 100 | Tue Aug 25 15:33:07 2009 | Marko Dragicevic | Pt_ITE512 | Pt_ITE512 12deg NO air! | run039 | 20k | 25.08.2009 15:35 | 25.08.2009 17:10 | Pt: 12 Grad, HV=200V, 34.4% (start run) to 36.1% (end run) RH, beam on, 120GeV
 ITE512: HV=70V, I=50muA
 X-Y-Table:
 |  |  | 99 | Tue Aug 25 13:48:30 2009 | Marko Dragicevic | Pt_ITE512 | Pt_ITE512 10deg  NO air! | run038 | 20k | 25.08.2009  13:54:54 | 25.08.2009  15:22:38 | Pt: 10 Grad, HV=200V, 31.7% (start run) to 33.8% (end run) RH, beam on, 120GeV
 ITE512: HV=70V, I=50muA
 X-Y-Table:
 |  |  | 98 | Tue Aug 25 12:30:04 2009 | Marko Dragicevic | Pt_ITE512 | Pt_ITE512 8deg  NO air! | run037 | 20k | 25.08.2009  12:45 | 25.08.2009  13:40:13 | Pt: 8 Grad, HV=200V, 28% (start run) to 31% (end run) RH, beam on, 120GeV
 ITE512: HV=70V, I=49.1muA
 X-Y-Table:
 |  |  | 97 | Tue Aug 25 11:26:23 2009 | Thomas Bergauer | Pt_ITE512 | Pt_ITE512 6deg NO air! | run036 | 20k | 25.08.2009 11:25 | 25.08.2009  12:19:55 | Pt: 6 Grad, HV=200V, 20% (start run) to % (end run) RH, beam on, 120GeV
 ITE512: HV=70V,
 X-Y-Table:
 |  |  | 96 | Tue Aug 25 09:53:16 2009 | Marko Dragicevic | Pt_ITE512 | Pt_ITE512 4deg  NO air! | run035 | 20k | 25.08.2009  09:50 | 25.08.2009  11:00 | Pt: 4 Grad, HV=200V, 0% (start run) to 14% (end run) RH, beam on, 120GeV
 ITE512: HV=70V,
 X-Y-Table:
 |  |  | 95 | Tue Aug 25 09:01:12 2009 | Marko Dragicevic | Pt_ITE512 | Pt_ITE512 2deg air | run034 | 20k | 25.08.09 08:56:18 | 25.08.09 09:45: | Pt: 2 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V,
 X-Y-Table:
 x=99.6, y=36
 |  |  | 94 | Tue Aug 25 09:00:51 2009 | Thomas Bergauer |  | beam conditions |  |  |  |  | manually changed TRIM3, TRIM4 and TRIM6 |    |  | 93 | Tue Aug 25 01:33:18 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 0deg air | run033 | 151724 | 25.08.09 01:35:18 | 25.08.2009  08:44:27 | Pt: 0 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V,
 X-Y-Table:
 x=99.6, y=36
 |  |  | 92 | Mon Aug 24 22:12:22 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 15deg air | run032 | 19456 | 24.08.09 22:18:08 | 24.08.09 23:25:52 | Pt: 15 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V,
 X-Y-Table:
 x=99.6, y=36
 
 no
 |  |  | 91 | Mon Aug 24 22:04:56 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 13deg air | run031 | 20k | 24.08.09 20:53:50 | 24.08.09 22:00:49 | Pt: 13 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V,
 X-Y-Table:
 x=99.6, y=36
 |  |  | 90 | Mon Aug 24 18:30:07 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 11deg air | run030 | 20k | 24.08.09 18:45:09 | 24.08.09  20:37:04 | Pt: 11 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V,
 X-Y-Table:
 x=99.6, y=36
 |  |  | 89 | Mon Aug 24 16:44:36 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 9deg air | run029 | 20k | 24.08.09 17:03:21 | 24.08.09 18:20:55 | Pt: 9 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V,
 X-Y-Table: