ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
49
|
Mon Jun 2 23:34:29 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** HV-scan *** | run2827 | 10000 | 02.06.2008 23:33:40 | 02.06.2008 23:52:04 | SiLC beam test - CERN SPS June 2008
HV scan, HV=150V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
JURA
| | |
| | | | |
beam ---->| | | | | | | |
| | | | |
| | |
0 1 2 3 4 5 6 7
SALEVE |
48
|
Mon Jun 2 23:14:58 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** HV-scan *** | run2826 | 10000 | 02.06.2008 23:14:19 | 02.06.2008 23:31:29 | SiLC beam test - CERN SPS June 2008
HV scan, HV=120V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
JURA
| | |
| | | | |
beam ---->| | | | | | | |
| | | | |
| | |
0 1 2 3 4 5 6 7
SALEVE |
47
|
Mon Jun 2 22:55:49 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** HV-scan *** | run2825 | 10000 | 02.06.2008 22:55:03 | 02.06.2008 23:12:09 | SiLC beam test - CERN SPS June 2008
HV scan, HV=90V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
JURA
| | |
| | | | |
beam ---->| | | | | | | |
| | | | |
| | |
0 1 2 3 4 5 6 7
SALEVE |
46
|
Mon Jun 2 22:37:13 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** HV-scan *** | run2824 | 10000 | 02.06.2008 22:36:37 | 02.06.2008 22:53:15 | SiLC beam test - CERN SPS June 2008
HV scan, HV=80V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
JURA
| | |
| | | | |
beam ---->| | | | | | | |
| | | | |
| | |
0 1 2 3 4 5 6 7
SALEVE |
45
|
Mon Jun 2 22:13:17 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** HV-scan *** | run2823 | 10000 | 02.06.2008 22:12:44 | 02.06.2008 22:34:49 | SiLC beam test - CERN SPS June 2008
HV scan, HV=70V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
JURA
| | |
| | | | |
beam ---->| | | | | | | |
| | | | |
| | |
0 1 2 3 4 5 6 7
SALEVE |
44
|
Mon Jun 2 21:54:34 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** HV-scan *** | run2822 | 10000 | 02.06.2008 21:53:37 | 02.06.2008 22:10:53 | SiLC beam test - CERN SPS June 2008
HV scan, HV=60V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
JURA
| | |
| | | | |
beam ---->| | | | | | | |
| | | | |
| | |
0 1 2 3 4 5 6 7
SALEVE |
43
|
Mon Jun 2 21:37:10 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** HV-scan *** | run2821 | 10000 | 02.06.2008 21:32:57 | 02.06.2008 21:51:55 | SiLC beam test - CERN SPS June 2008
HV scan, HV=50V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
re-try after several hours of beam down
HV scan after re-arranging the modules:
JURA
| | |
| | | | |
beam ---->| | | | | | | |
| | | | |
| | |
0 1 2 3 4 5 6 7
SALEVE |
42
|
Mon Jun 2 16:01:10 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** HV-scan *** | run2792 | 4536 | 02.06.2008 16:00:09 | 02.06.2008 16:19:42 | SiLC beam test - CERN SPS June 2008
HV scan, HV=50V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
stopped after beam problem
HV scan after re-arranging the modules:
JURA
| | |
| | | | |
beam ---->| | | | | | | |
| | | | |
| | |
0 1 2 3 4 5 6 7
SALEVE |
41
|
Mon Jun 2 15:41:20 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** HV-scan *** | run2791 | 10000 | 02.06.2008 15:40:20 | 02.06.2008 15:58:16 | SiLC beam test - CERN SPS June 2008
HV scan, HV=40V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
JURA
| | |
| | | | |
beam ---->| | | | | | | |
| | | | |
| | |
0 1 2 3 4 5 6 7
SALEVE |
40
|
Mon Jun 2 15:21:53 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** HV-scan *** | run2790 | 10000 | 02.06.2008 15:20:44 | 02.06.2008 15:38:04 | SiLC beam test - CERN SPS June 2008
HV scan, HV=30V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
JURA
| | |
| | | | |
beam ---->| | | | | | | |
| | | | |
| | |
0 1 2 3 4 5 6 7
SALEVE |
38
|
Mon Jun 2 14:55:38 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** HV-scan *** | run2789 | 10000 | 02.06.2008 14:54:33 | 02.06.2008 15:19:12 | SiLC beam test - CERN SPS June 2008
HV scan, HV=20V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
JURA
| | |
| | | | |
beam ---->| | | | | | | |
| | | | |
| | |
0 1 2 3 4 5 6 7
SALEVE |
37
|
Mon Jun 2 14:32:40 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** HV-scan *** | run2788 | 10000 | 02.06.2008 14:31:15 | 02.06.2008 14:51:55 | SiLC beam test - CERN SPS June 2008
HV scan, HV=10V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
JURA
| | |
| | | | |
beam ---->| | | | | | | |
| | | | |
| | |
0 1 2 3 4 5 6 7
SALEVE |
36
|
Mon Jun 2 13:19:10 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** HV-scan *** | run2787 | 30000 | 02.06.2008 13:15:04 | 02.06.2008 14:27:57 | SiLC beam test - CERN SPS June 2008
HV scan, HV=100V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
Reference run with nominal HV after re-arranging the modules:
JURA
| | |
| | | | |
beam ---->| | | | | | | |
| | | | |
| | |
0 1 2 3 4 5 6 7
SALEVE |
35
|
Sun Jun 1 23:46:33 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (raw) | run2758 - run2783 | 34873 | 01.06.2008 23:44:57 | 02.06.2008 10:08:46 | SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2.0 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: raw, new firmware
last raw run in RIGHT position |
28
|
Sun Jun 1 16:06:42 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (raw) | run2741 - run2757 | 22000 | 01.06.2008 16:02:56 | 01.06.2008 22:02:34 | SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: raw, new firmware
right from the start: no beam... |
22
|
Sun Jun 1 08:06:57 2008 |
stephan hänsel | SiLC | APVDAQ + telescope (raw) | run2721-2737 | 22000 | 01.06.2008 - 08:01:53 | 01.06.2008 - 14:19:13 | SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: raw, new firmware
horizontal position ("target") = -7.5mm
this is LEFT position |
33
|
Sun Jun 1 23:23:16 2008 |
Markus Friedl | SiLC | APVDAQ only (0-sup) | run0004 | 100000 | 01.06.2008 23:21:12 | 01.06.2008 23:41:09 | SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
no telescope
This is RIGHT position
APVDAQ runs in HIT MODE (=0-suppressed)
acquisition rate ~430 Hz during spill (TLU says ~86 Hz) |
32
|
Sun Jun 1 23:20:10 2008 |
Markus Friedl | SiLC | APVDAQ only | ped004 | 10000 | 01.06.2008 23:16:52 | 01.06.2008 23:19:59 | SiLC beam test - CERN SPS June 2008 - PEDESTAL with beam
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
software trigger
no telescope
this is RIGHT position |
26
|
Sun Jun 1 15:08:17 2008 |
Markus Friedl | SiLC | APVDAQ only (0-sup) | run0003 | 100000 | 01.06.2008 15:05:51 | 01.06.2008 15:33:58 | SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
no telescope
This is MID position
APVDAQ runs in HIT MODE (=0-suppressed)
acquisition rate ~300 Hz during spill |
25
|
Sun Jun 1 15:02:51 2008 |
Markus Friedl | SiLC | APVDAQ only | ped003 | 10000 | 01.06.2008 15:00:54 | 01.06.2008 15:04:14 | SiLC beam test - CERN SPS June 2008 - PEDESTAL with beam
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
software trigger
no telescope
PEDESTAL WITH BEAM (10k) @ MID |
|