ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
Text |
|
15
|
Sat May 31 13:34:28 2008 |
Thomas Bergauer | | how to copy data from lab2pc to eudetmac | | | | | rsync -rltvz --exclude "data_vie" --exclude
"hitfit_cern08" --exclude "output_vie" --exclude
"run2719*" --rsh="ssh -C -p222" friedl@routerhephy.cern.ch:/cygdrive/f/testbeam/cern_jun08/ |
|
57
|
Tue Jun 3 11:03:27 2008 |
Thomas Bergauer | | telescope alignment run | run2830 | 3897 | 2008-06-03 10:52:16.783 | 2008-06-03 10:58:52.790 | telescope run with reduced beam intensity
(BEND4=-600A instead of -620A and BEND7=-605A
instead of -615A) |
|
59
|
Tue Jun 3 12:41:22 2008 |
Eudet Telescope | | useful eudaq software commands | (work in progress) | | | | [b]to show information about a run (number
of events, start and end timestamp,....:[/b]
./TestReader.exe -b -e 2828 |
|
67
|
Wed Jun 4 15:41:04 2008 |
Thomas Bergauer | | end. | | | | | testbeam is over. DUTs and APVDAQ have been
dismounted and will be shipped back to Vienna.
EUDET telescope is still in H6B and taking |
|
68
|
Tue Jun 17 09:43:07 2008 |
Thomas Bergauer | | Data analysis progress | overview (in progress) | | | | [TABLE border="1"]
run number|What?|APVDAQ mode|Telescope mode|#events|hit
data processed|hitfit processed
|
|
7
|
Wed May 14 16:15:30 2008 |
Markus Friedl | BELLE | Micron DDD5 Photos | | | | | This is the new Micron DDD5 double-sided module
with 3+3 APV25 readout chips on each side.
|
|
52
|
Tue Jun 3 02:38:21 2008 |
Markus Friedl | BELLE | APVDAQ + telescope (0-sup) | run2829 | 105000 | 03.06.2008 02:29:51 | 03.06.2008 09:08:58 | SiLC beam test - CERN SPS June 2008
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d |
|
53
|
Tue Jun 3 09:12:42 2008 |
Markus Friedl | BELLE | APVDAQ only | run0005 | 45020 | 03.06.2008 09:11:30 | 03.06.2008 09:24:42 | SiLC beam test - CERN SPS June 2008 - HIT
MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
|
|
54
|
Tue Jun 3 09:27:27 2008 |
Markus Friedl | BELLE | APVDAQ only | run0006 | 23929 | 03.06.2008 09:26:16 | 03.06.2008 09:34:22 | SiLC beam test - CERN SPS June 2008 - HIT
MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
|
|
55
|
Tue Jun 3 09:57:17 2008 |
Markus Friedl | BELLE | APVDAQ only | run0007 | 105000 | 03.06.2008 09:40:18 | 03.06.2008 10:12:48 | SiLC beam test - CERN SPS June 2008 - HIT
MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
|
|
56
|
Tue Jun 3 10:58:54 2008 |
Markus Friedl | BELLE | APVDAQ only | ped007 | 10000 | 03.06.2008 10:53:04 | 03.06.2008 10:58:47 | SiLC beam test - CERN SPS June 2008
4 Belle modules, 40MHz, HV=80V, 6 samples
beam on (lower intensity) |
|
2
|
Wed May 7 10:43:09 2008 |
Thomas Bergauer | SiLC | Documentation: twiki, Stephans Hardware Drawings,.... | | | | | DUT, APVDAQ Documentation
CERN TWiki:
https://twiki.cern.ch/twiki/bin/view/Main/SiLCTestbeam
|
|
3
|
Wed May 7 16:28:23 2008 |
stephan hänsel | SiLC | Photos | | | | | Module Photos
[URL=http://wwwhephy.oeaw.ac.at/u3w/s/shaensel/www/HEPHY-Testbeam08/module-top.jpg]topview |
|
4
|
Fri May 9 11:46:36 2008 |
Markus Friedl | SiLC | Data file format | (work in progress) | | | | APVDAQ Data Analysis
====================
|
|
5
|
Fri May 9 15:29:28 2008 |
Thomas Bergauer | SiLC | Sensor Layout | | | | |
|
|
6
|
Wed May 14 09:21:39 2008 |
stephan hänsel | SiLC | capacity measurements - HPK-ILC-TS-6687-24 | | | | | ich hab mal die Kapazitäts-Messungen vom Thomas
in ein Diagram gegeben
|
|
10
|
Fri May 23 15:17:49 2008 |
Markus Friedl | SiLC | Module/chip/strip/zone numbering scheme | (work in progress) | | | | The SILC DUT is a stack of 8 silicon sensors
surrounded by the telescope.
The spacing between each of the 8 layers |
|
11
|
Mon May 26 15:38:53 2008 |
Markus Friedl | SiLC | How to run APVDAQ | | | | | Power-on Procedure
==================
|
|
14
|
Fri May 30 19:42:13 2008 |
stephan hänsel | SiLC | APVDAQ only | run0001 | 51803 | 30.05.2008 19:38:04 | 30.05.2008 22:54:59 | SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d |
|
16
|
Sat May 31 17:29:40 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) | run2716 | 20000 | 31.05.2008 14:59:26 | 31.05.2008 15:56:23 | SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d |
|